QX Resources

RC Drilling Recommences At Turner River Lithium Project, WA

QX Resources Limited (ASX: QXR, ‘QXR’ of the ‘Company’) is pleased to advise that it has recommenced RC drilling at the Company’s 100%-owned Turner River hard rock lithium project, located 15 km to south-east of Mineral Resources’ Wodgina lithium mine, located within the Pilbara lithium province of Western Australia (Figures 1 & 2).


  • ~1,500m follow-up RC drilling program underway at QXR’s Turner River hard rock lithium project
  • Continuation of drilling aimed to extend the areas of known mineralisation over an increased strike length
  • Maiden drilling in December 2022 highlighted the presence of pegmatites and potential lithium rich micas, based on visual observations
  • Encouraging indications of significant areas of pegmatites were observed in drill pads and drill chips, extending beyond the previously sampled area of high grade lithium rock chip results
  • Assay results from the first phase drill program are anticipated in late-February, with the second program results expected in April 2023
  • Yule River tenement, which has pegmatite occurrences, has been granted for an initial 5-year term
In December 2022, QXR undertook a ~1,200m maiden RC drill program at Turner River. The maiden program produced encouraging indications of significant areas of potential lithium bearing pegmatites observed in drill pads and drill chips at QXR’s 100%-owned Turner River hard rock lithium project (Carbonate Hill prospect). These indications extend beyond the area with previously reported high grade rock chip samples of 1.6% Li2O, 1.1% Li2O and 4.9% Li2O (refer QXR ASX announcements 8 Nov, 10 Nov, 12 Dec and 30 June 2022).

Pegmatites and potential lithium rich micas were intersected in the maiden drilling, based on visual observations, which achieved the aim of the maiden drill program. Drilling targeted the potential for either lithium mica and spodumene bearing pegmatites, or a new style of large tonnage hard rock lithium deposit hosted near the top of a large granite body rich in lithium micas.

Assay results from the first phase of the program are anticipated in mid-February. Results from the follow-up program are expected ~6 weeks after completion of the program.

Figure 1: Location map of QXR’s Turner River project licences relative to large Pilbara lithium mines, andphoto of weathered lepidolite in rock samples from the drilling area shown in Figure 2,3.

Figure 2: Location Map Turner River lithium project, with lithium results in rock chip

Grant of Yule River Project (E45/6159)

The Yule River project (140km2) has been granted for an initial 5-year term. The Yule River project is an exploration stage package which lies wholly within the Yule Granitoid Complex, which has interpreted pegmatite occurrences (Figure 5). From initial due diligence, the Company understands the granite within the tenement has been intruded by the Split Rock Supersuite with which the Wodgina, Pilgangoora and Global Lithium deposits are associated.

All of the tenements applied for by the Company are now fully granted in the highly-prospective Pilbara lithium region, following the grant of Yule River.


Click here for the full ASX Release

This article includes content from QX Resources Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

QXR:AU
The Conversation (0)
QX Resources

QX Resources

Copper/Moly/Gold assets in Queensland

Copper/Moly/Gold assets in Queensland Keep Reading...
Quarterly Activities/Appendix 5B Cash Flow Report

Quarterly Activities/Appendix 5B Cash Flow Report

QX Resources (QXR:AU) has announced Quarterly Activities/Appendix 5B Cash Flow ReportDownload the PDF here. Keep Reading...
Glowing digital battery icon with particle connections on dark background.

POSCO Signs Lithium Supply Deal With CATL Through 2028

South Korea’s POSCO Group, trading under POSCO Holdings (NYSE:PKX,KRX:005490), has signed a long-term agreement to supply lithium to Contemporary Amperex Technology (SZSE:300750,HKEX:3750) (CATL), the world’s largest electric vehicle battery maker, covering 2026 to 2028 with deliveries already... Keep Reading...
Argentina Lithium & Energy IR Manager Shawn Perger.

Argentina Lithium and Energy: PFS at Rincon West Targeted in 2027

Argentina Lithium and Energy (TSXV:LIT,OTCQB:LILIF,FWB:OAY3) IR Manager Shawn Perger spoke to the Investing News Network at the New Orleans Investment Conference, highlighting the expected completion of a prefeasibility study (PFS) for Rincon West in Q2 2027 and a production pathway to follow.... Keep Reading...
Rio Tinto website.

Rio Tinto Opens Two Argentine Lithium Projects Worth US$1.4 Billion

Rio Tinto (ASX:RIO,NYSE:RIO,LSE:RIO) opened two lithium operations in Argentina's Catamarca province on Thursday (October 29), which is touted to add 25,000 metric tons of annual lithium carbonate equivalent (LCE) capacity once fully ramped up.To date, Rio Tinto has invested roughly US$1.4... Keep Reading...
Silver batteries surround a rising green graph on a lithium-themed backdrop with the text: Lithium, Li.

Benchmark: New Lithium Mine Needed Every Two Months to Meet 2050 Demand

The lithium industry will need to bring the equivalent of a new mine into production roughly every two months for the next 24 years to keep up with demand, according to new data from Benchmark Mineral Intelligence.Benchmark forecasts global lithium demand will reach about 7 million metric tons... Keep Reading...
Blue battery with Australian flag design on a wooden surface.

5 Best-performing ASX Lithium Stocks in 2026

After a sharp rally in the first half of the year, lithium prices retreated during the third quarter, surrendering a significant portion of the gains generated in May when carbonate values reached a multi-year high. Data from Benchmark Mineral Intelligence shows FOB Australia spodumene... Keep Reading...
Glowing battery symbol with lightning bolt on purple circuit board.

Lithium Market Trends: Q3 2026 Review and Forecast

Lithium prices lost ground in Q3, giving back much of the momentum built during a sharp first-half rally.The decline came despite demand indicators that market watchers continue to describe as strong, with electric vehicles (EVs) and grid-scale energy storage both pulling on supply. Price action... Keep Reading...

Interactive Chart

Latest Press Releases

Related News