80 tungsten

i-80 Gold to Proceed with Underground Program at McCoy-Cove

i-80 Gold Corp. (TSX: IAU) (OTCQX: IAUCF) ("i-80", or the "Company") is pleased to announce it is proceeding with its planned underground, advanced-exploration program at the Company's 100%-owned McCoy-Cove Property ("McCoy-Cove" or "the Property") located in Nevada .

McCoy-Cove is one of four projects currently being advanced by i-80 and is one of the key projects contemplated in the Company's plans to restart the Lone Tree processing facility that includes an autoclave. The underground plan will include the construction of a decline and a level that will include multiple drill bays in order to upgrade resources and complete a Feasibility Study. The Cove deposit on the Property represents one of North America's higher grade gold deposits with grades in excess of 10 grams per tonne gold (g/t Au) (Table 1). See Premier Gold Mines press release dated January 18, 2021 . The deposit remains open for expansion to the southeast.

Table 1 – McCoy Cove Resource

Mineral Resources


Tonnage

Au Grade

Ag Grade

Gold

Silver


(kt)

(g/t)

(g/t)

(koz)

(koz)

Indicated

1,007

10.9

29.1

351

943

Inferred

3,867

10.9

20.6

1,353

2,565

Mineral Resources have been estimated at a gold price of $1,500 per troy ounce;

2. Mineral Resources have been estimated using gold metallurgical recoveries of 79.5% and 85.2% for roasting and pressure oxidation respectively;

3. Mineral Resources have been estimated using a gold equivalent cutoff grade of 0.141 opt;

4. One ounce of gold is equivalent to 98 ounces of silver;

5. The effective date of the Mineral Resource estimate is January 1, 2021;

6. Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, socio-political, marketing, or other relevant factors;

7. An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration; and

8. The reference point for mineral resources is in situ.

"McCoy-Cove is one of the four projects being advanced, with mineralization anticipated to be processed at the Company's recently acquired Lone Tree Complex", stated Matt Gili , President & COO of i-80. "With the processing arrangement we have with Nevada Gold Mines , in addition to our autoclave, we have secured the required processing that will allow us to build this high-grade mine that is an important component in our growth plans".

Formal Request for Proposal (RFP) documents were submitted to six underground mining contractors and site visits were completed in November. Contractor selection will take place in December 2021 . i-80 is anticipating breaking ground for the underground plan at McCoy-Cove in early 2022.

The initial Scope of Work for the Cove Exploration Decline consists of a new portal and over 1,000 meters of underground development. From this decline and drill platform we will commence a 40,000 meter in-fill and definition drilling campaign, primary focused on upgrading the known resource.

The McCoy-Cove Property is strategically located approximately 50 km south of the Company's Lone Tree Complex, and immediately south of Nevada Gold Mines' Phoenix Mine within the Battle Mountain-Eureka Trend (Figure 1). The Property is accessed via an all-season road from Highway 55 in Nevada .


Qualified Person

The technical and scientific information contained in this press release has been reviewed by Tim George, PE, Manager, Engineering Services of the Company, and a is a Qualified Person within the meaning of National Instrument 43-101.

About i-80 Gold Corp.

i-80 Gold Corp. is a well-financed, Nevada-focused, mining company with a goal of achieving mid-tier gold producer status through the development of multiple deposits within the Company's advanced-stage property portfolio to complement existing gold production from the Ruby Hill open pit.

___________________________________

Certain statements in this release constitute "forward-looking statements" or "forward-looking information" within the meaning of applicable securities laws, including but not limited to, timing of the commencement and completion of the underground plan work at the McCoy-Cove Property, the timing of completion of a feasibility study at the McCoy Cove Property, timing of commencement of processing minerals from the McCoy Cove Property-. Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of the company, its projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such statements can be identified by the use of words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate", "scheduled", "forecast", "predict" and other similar terminology, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. These statements reflect the Company's current expectations regarding future events, performance and results and speak only as of the date of this release.


Forward-looking statements and information involve significant risks and uncertainties, should not be read as guarantees of future performance or results and will not necessarily be accurate indicators of whether or not such results will be achieved. A number of factors could cause actual results to differ materially from the results discussed in the forward-looking statements or information, including, but not limited to: material adverse changes, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with the company to perform as agreed; social or labour unrest; changes in commodity prices; and the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations.

View original content to download multimedia: https://www.prnewswire.com/news-releases/i-80-gold-to-proceed-with-underground-program-at-mccoy-cove-301429691.html

SOURCE i-80 Gold Corp

View original content to download multimedia: https://www.newswire.ca/en/releases/archive/November2021/22/c4386.html

News Provided by Canada Newswire via QuoteMedia

The Conversation (0)
Gold nuggets with text: "5 Top Australian Mining Stocks This Week."

Top 5 Australian Mining Stocks This Week: African Gold Shines on Acquisition by Montage

Welcome to the Investing News Network's weekly round-up of the top-performing mining stocks listed on the ASX, starting with news in Australia's resource sector.Gold, rare earths, metals and iron ore are all in this week’s list, with each company’s share climbing on either M&A news or project... Keep Reading...
Frank Holmes, gold bars.

Frank Holmes: Next Gold, Silver Price Calls, Plus Top 2026 Asset

Frank Holmes of US Global Investors (NASDAQ:GROW) shares his forecast for gold and silver.He sees gold testing US$5,000 per ounce next year and then reaching US$7,000 by the end of US President Donald Trump's second term in office. "And I think that silver will be over US$100," he added.Don't... Keep Reading...
Electronic display showing gold price with upward trend indicators.

Gold’s Next Test: WGC Lists 3 Potential Price Scenarios in 2026 Outlook

Investors should brace for continued economic uncertainty and financial market volatility in 2026, the World Gold Council (WGC) warns in its 2026 outlook — and those circumstances could have various effects on gold. After a blistering 2025 that has so far seen the yellow metal hit more than 50... Keep Reading...
PDAC 2026

Registration opens for PDAC 2026: The World’s Premier Mineral Exploration & Mining Convention

The Prospectors & Developers Association of Canada (PDAC) is pleased to announce that registration is now open for PDAC 2026, taking place March 1-4, 2026, at the Metro Toronto Convention Centre in Toronto. The world’s leading gathering for mineral exploration and mining will once again unite... Keep Reading...
Metals One

Placement to Institutional and Sophisticated Investors, Appointment of Joint Broker,Issue of Equity & TVR

Metals One (AIM: MET1, OTCQB: MTOPF), a critical and precious metals exploration and development company, is pleased to announce it has successfully raised gross proceeds of £4.4 million (before expenses) through a placing of new ordinary shares with institutional and sophisticated investors... Keep Reading...
Blocks forming "2026" on cash and gold bars background.

Gold Price Forecast: Top Trends for Gold in 2026

Gold has reached once-unthinkable prices in 2025, gaining over 60 percent by early December. Looking ahead to 2026, experts believe the major themes that carried the gold price to new heights this year will continue to underwrite its trajectory in the months ahead, boosting the metal even... Keep Reading...

Latest Press Releases

Related News