Bear Creek Mining Files NI 43-101 Technical Report for Corani Phase 1 Detailed Engineering Study

Silver Investing

Bear Creek Mining (TSX Venture: BCM) (“Bear Creek” or the “Company”) announces that it has filed a Technical Report (as defined in National Instrument 43-101) regarding the Company’s Corani Silver-Lead-Zinc property in Peru, entitled “NI43-101 Technical Report, Corani Project Detailed Engineering Phase 1 (FEED)” (the “2017 Corani Technical Report”). The 2017 Corani Technical Report is …

Bear Creek Mining (TSX Venture: BCM) (“Bear Creek” or the “Company”) announces that it has filed a Technical Report (as defined in National Instrument 43-101) regarding the Company’s Corani Silver-Lead-Zinc property in Peru, entitled “NI43-101 Technical Report, Corani Project Detailed Engineering Phase 1 (FEED)” (the “2017 Corani Technical Report”). The 2017 Corani Technical Report is dated effective September 13, 2017 and was prepared on behalf of the Company by Sedgman Chile SpA, with contributions from other mining and engineering consulting firms.

The 2017 Corani Technical Report supports and augments the Phase 1 Detailed Engineering results contained in the Company’s news release issued on September 15, 2017.
There are no material differences between the scientific and technical disclosure contained in the September 15, 2017 News Release and the 2017 Corani Technical Report, both of which are available to the public on SEDAR (www.sedar.com) and on the Company’s website (www.bearcreekmining.com).

Click here to read the full text release. 

The Conversation (0)
×