- WORLD EDITIONAustraliaNorth AmericaWorld
Investing News NetworkYour trusted source for investing success
- Lithium Outlook
- Oil and Gas Outlook
- Gold Outlook Report
- Uranium Outlook
- Rare Earths Outlook
- All Outlook Reports
- Top Generative AI Stocks
- Top EV Stocks
- Biggest AI Companies
- Biggest Blockchain Stocks
- Biggest Cryptocurrency-mining Stocks
- Biggest Cybersecurity Companies
- Biggest Robotics Companies
- Biggest Social Media Companies
- Biggest Technology ETFs
- Artificial Intellgience ETFs
- Robotics ETFs
- Canadian Cryptocurrency ETFs
- Artificial Intelligence Outlook
- EV Outlook
- Cleantech Outlook
- Crypto Outlook
- Tech Outlook
- All Market Outlook Reports
- Cannabis Weekly Round-Up
- Top Alzheimer's Treatment Stocks
- Top Biotech Stocks
- Top Plant-based Food Stocks
- Biggest Cannabis Stocks
- Biggest Pharma Stocks
- Longevity Stocks to Watch
- Psychedelics Stocks to Watch
- Top Cobalt Stocks
- Small Biotech ETFs to Watch
- Top Life Science ETFs
- Biggest Pharmaceutical ETFs
- Life Science Outlook
- Biotech Outlook
- Cannabis Outlook
- Pharma Outlook
- Psychedelics Outlook
- All Market Outlook Reports
Bear Creek Mining Files NI 43-101 Technical Report for Corani Phase 1 Detailed Engineering Study
Bear Creek Mining (TSX Venture: BCM) (“Bear Creek” or the “Company”) announces that it has filed a Technical Report (as defined in National Instrument 43-101) regarding the Company’s Corani Silver-Lead-Zinc property in Peru, entitled “NI43-101 Technical Report, Corani Project Detailed Engineering Phase 1 (FEED)” (the “2017 Corani Technical Report”). The 2017 Corani Technical Report is …
Bear Creek Mining (TSX Venture: BCM) (“Bear Creek” or the “Company”) announces that it has filed a Technical Report (as defined in National Instrument 43-101) regarding the Company’s Corani Silver-Lead-Zinc property in Peru, entitled “NI43-101 Technical Report, Corani Project Detailed Engineering Phase 1 (FEED)” (the “2017 Corani Technical Report”). The 2017 Corani Technical Report is dated effective September 13, 2017 and was prepared on behalf of the Company by Sedgman Chile SpA, with contributions from other mining and engineering consulting firms.
The 2017 Corani Technical Report supports and augments the Phase 1 Detailed Engineering results contained in the Company’s news release issued on September 15, 2017.
There are no material differences between the scientific and technical disclosure contained in the September 15, 2017 News Release and the 2017 Corani Technical Report, both of which are available to the public on SEDAR (www.sedar.com) and on the Company’s website (www.bearcreekmining.com).
Latest News
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.