Winsome Resources

Quarterly Activities/Appendix 5B Cash Flow Report

Winsome Resources (ASX:WR1; “Winsome” or “the Company”) is pleased to provide this report onactivities for the quarter ending 31 March 2023.


QUARTER HIGHLIGHTS

DRILLING & EXPLORATION

  • Drilling at Adina extends potential strike length of the mineralised pegmatite target to 3.1km
  • Mineralisation at Adina remains open to both the east and west of the Main Zone
  • Further assay results confirm Adina as a robust high-grade lithium project
  • Assays from Main Zone at Adina included several +50m intersections at high grades of Li2O
  • Resource development drilling ramps up at Adina with additional drilling rigs being mobilised

CORPORATE

  • A$52M raised to accelerate resource development and exploration activities across Canadian portfolio
  • Strengthened balance sheet provides additional capital to pursue other corporate opportunities
  • Winsome increased its interest in Power Metals Corp to approximately 10%

HEALTH & SAFETY & ENVIRONMENT

  • Continue to record zero lost time and safety incidents throughout exploration and drill campaigns
  • ESG Framework established
DRILLING & EXPLORATION ACTIVITIES

ADINA MAIDEN RESOURCE AND EXTENSIONAL DRILLING

During the quarter, Winsome reported its step-out drilling program at Adina extended the strike length of the mineralised pegmatite body to a potential 1,600m.

The extension of the mineralised pegmatite body was validated through the drilling of hole AD-22-043, which intersected 17.1m of spodumene bearing pegmatite about 1km east of previously reported drilling at Adina.

Drilling at Adina continued to intersect broad widths of spodumene bearing pegmatite, including;

  • 52.2m in AD-22-059 (from 118.2m)
  • 50.8m in AD-22-037 (from 162.3m)
  • 49.9m in AD-22-042 (from 30.7m)1

These results followed strong lithium mineralisation from initial assay results reported earlier in the quarter from drill hole AD-22-0052;

  • 1.34% Li2O over 107.6m from 2.3m to 109.9m, including:
    • 1.52% Li2O over 20.7m from 2.3m to 23.0m
    • 2.21% Li2O over 30.0m from 41.0m to 71.0m
    • 1.05% Li2O over 26.5m from 71.0m to 97.5m
    • 0.96% Li2O over 6.9m from 103.0m to 109.9m

An additional significant mineralised pegmatite interval was also intersected in AD-22-005, reporting 1.08% Li2O over 30.0m from 147.0m to 177.0m.

Further assay results throughout the quarter continued to confirm Adina as a robust high-grade lithium project.

Assays from the central portion of the Main Zone at Adina included several +50 metre intersections above grades of 1% Li2O.

Subsequent3 to quarter end, assay results from Adina East confirmed high-grade lithium mineralisation some 1.9km east of the Main Zone, bringing the total strike length of the lithium mineralised trend to over 3 km.


Click here for the full ASX Release

This article includes content from Winsome Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

WR1:AU
The Conversation (0)
Restructure of the Renard Option

Restructure of the Renard Option

Highlights Reduction of initial payment upon exercise of the option from C$15 million to C$1 million . The balance of the Renard consideration payment delayed until 2026 and 2027. Renard Option restructure preserves shareholder value by deferring material payments by 12 months and extending the... Keep Reading...
Winsome Resources

Winsome Further Expands Lithium Exploration Footprint in Quebec

Perth-based lithium exploration and development company Winsome Resources (ASX:WR1; “Winsome” or “the Company”) is pleased to advise it has partnered with geology specialist Mr Glenn Griesbach and with local prospector Mr Marc de Keyser. Highlights: Exclusive option agreement executed for... Keep Reading...
Winsome Resources

Quarterly Report for Period Ending 31 March 2022

Winsome Resources Limited (ASX: WR1) ("the Company" or "Winsome Resources ") is pleased to report on its Quarterly activities for the period ending 31 March 2022.Quarter Highlights Exploration Entered into exclusive option agreement to explore and acquire 669 claims in the highly prospective... Keep Reading...
Argentina Lithium & Energy IR Manager Shawn Perger.

Argentina Lithium and Energy: PFS at Rincon West Targeted in 2027

Argentina Lithium and Energy (TSXV:LIT,OTCQB:LILIF,FWB:OAY3) IR Manager Shawn Perger spoke to the Investing News Network at the New Orleans Investment Conference, highlighting the expected completion of a prefeasibility study (PFS) for Rincon West in Q2 2027 and a production pathway to follow.... Keep Reading...
Rio Tinto website.

Rio Tinto Opens Two Argentine Lithium Projects Worth US$1.4 Billion

Rio Tinto (ASX:RIO,NYSE:RIO,LSE:RIO) opened two lithium operations in Argentina's Catamarca province on Thursday (October 29), which is touted to add 25,000 metric tons of annual lithium carbonate equivalent (LCE) capacity once fully ramped up.To date, Rio Tinto has invested roughly US$1.4... Keep Reading...
Silver batteries surround a rising green graph on a lithium-themed backdrop with the text: Lithium, Li.

Benchmark: New Lithium Mine Needed Every Two Months to Meet 2050 Demand

The lithium industry will need to bring the equivalent of a new mine into production roughly every two months for the next 24 years to keep up with demand, according to new data from Benchmark Mineral Intelligence.Benchmark forecasts global lithium demand will reach about 7 million metric tons... Keep Reading...
Blue battery with Australian flag design on a wooden surface.

5 Best-performing ASX Lithium Stocks in 2026

After a sharp rally in the first half of the year, lithium prices retreated during the third quarter, surrendering a significant portion of the gains generated in May when carbonate values reached a multi-year high. Data from Benchmark Mineral Intelligence shows FOB Australia spodumene... Keep Reading...
Glowing battery symbol with lightning bolt on purple circuit board.

Lithium Market Trends: Q3 2026 Review and Forecast

Lithium prices lost ground in Q3, giving back much of the momentum built during a sharp first-half rally.The decline came despite demand indicators that market watchers continue to describe as strong, with electric vehicles (EVs) and grid-scale energy storage both pulling on supply. Price action... Keep Reading...
An electric vehicle beside a charging station.

EU Hybrid EV Cap Sinks Chinese Lithium to 10 Month Low

The EU announced it will cap imports of Chinese hybrid electric vehicles at 350,000 units annually starting this December, sending Chinese lithium futures plunging to a 10 month low.European Trade Commissioner Maros Sefcovic brokered the quota system during recent negotiations held in Beijing.... Keep Reading...

Interactive Chart

Latest Press Releases

Related News