UEX Files Updated Shea Creek Technical Report

(TheNewswire)

UEX Corporation

Saskatoon, Saskatchewan TheNewswire - June 6, 2022,  UEX Corporation (TSX:UEX) (OTC:UEXCF) ("UEX" or the "Company") is pleased to announce that is has filed an updated technical report for the Company's 49.0975% owned Shea Creek Project that includes an updated mineral resource estimate for the property. The remaining 50.9025% interest in the Shea Creek Project is owned by Orano Canada Inc.

The updated technical report and mineral resource estimate was completed by Mr. James Gray, P.Geo. of Advantage Geoservices Limited, Mr. David Rhys, P.Geo. of Panterra Geoservices Inc., and Mr. Chris Hamel, P.Geo., UEX's Vice President of Exploration.  Mr. Gray, Mr. Rhys, and Mr. Hamel are Qualified Persons as defined by National Instrument 43-101. Mr. Gray is considered independent of the Company.  Mr. Hamel is an employee of UEX, and Mr. Rhys is a technical advisor to the Company.  Mr. Hamel and Mr. Rhys are not considered to be independent of the Company.

The Shea Creek mineral resource estimate for the four deposits were determined using a cut-off grade of 0.30% U 3 O 8 .  A total of 2,056,000 tonnes containing 67.57 million pounds of U 3 O 8 at an average grade of 1.491% U 3 O 8 have been estimated in the indicated mineral resource category.  A total of 1,254,000 tonnes containing 28.06 million pounds of U 3 O 8 at an average grade of 1.015% U 3 O 8 have been estimated in the inferred mineral resource category.

Table 1 – Shea Creek Mineral Resource Estimate at 0.3% U 3 O 8 cut-off grade


Click Image To View Full Size

The current mineral resource estimate includes the results from 477 diamond drill holes totalling 402,800 m which were drilled from 1992 to 2012.  On average, indicated resource blocks were located within 8 m of a drill hole and inferred blocks within 16 m.  Mineralized wireframes of the Colette, 58B, Kianna and Anne zones bound perched, unconformity, and basement mineralization were prepared at a 0.05% U 3 O 8 mineralized threshold to constrain the mineral resource estimate at each deposit area.  The estimate was completed by ordinary kriging using Gemcom software with block sizes of 5 x 5 x 5 m.  The impact of anomalously high-grade samples were controlled through a process of grade capping and well as interpolation distance restrictions for some zones.

The mineral resource estimate primarily utilized uranium geochemical analyses from the Saskatchewan Research Council ("SRC") Geoanalytical Laboratories in Saskatoon, Saskatchewan, obtained through Inductively Coupled Plasma Mass Spectroscopy ("ICP-MS") for all samples with grades lower than 1,000 ppm U and using Inductively Couple Plasma Optical Emission Spectroscopy for samples determined by ICP-MS to contain uranium concentrations higher than 1,000 ppm U.  Duplicate and independent check analyses were performed on approximately 5% of the mineralized assay database.

In cases where geochemical analyses were not available due to incomplete sampling or core recovery issues, downhole gamma probe data were used to calculate equivalent uranium grades obtained using a DHT27-STD gamma probe which collects continuous readings along the length of the drill hole.  Probe results are calibrated using an algorithm calculated from comparison of probe results against geochemical analyses in previous holes in the Shea Creek area.

The technical report was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"),has been be filed on SEDAR at www.sedar.com and is available on the Company's website at www.uexcorp.com .

Qualified Persons and Data Acquisition

The technical report was prepared under the supervision of Messrs. James Gray, P.Geo., David Rhys, P.Geo, and Chris J. Hamel P.Geo., all Qualified Persons   They have reviewed and approved the technical contents relating to the technical report in this release. The technical information in this news release has been reviewed and approved by Roger Lemaitre, P.Eng., P.Geo., UEX's President, who is considered to be a Qualified Person as defined by National Instrument 43-101.

About UEX

UEX is a Canadian uranium and cobalt exploration and development company involved in an exceptional portfolio of uranium projects.

UEX's directly-owned portfolio of projects is located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium region which in 2020 accounted for approximately 8.1% of the global primary uranium production. In addition to advancing its uranium development projects through its ownership interest in JCU, UEX is currently advancing several other uranium deposits in the Athabasca Basin which include the Paul Bay, Ken Pen and Ōrora deposits at the Christie Lake Project , the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project, the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Project and the West Bear Uranium Deposit located at its 100%-owned West Bear Project.

UEX is also 50:50 co-owner of JCU (Canada) Exploration Company, Limited with Denison Mines Corp. JCU's portfolio of projects includes interests in some of Canada's key future uranium development projects, notably a 30.099% interest in Cameco's Millennium Project, a 10% interest in Denison's Wheeler River Project, and a 33.8123% interest in Orano Canada's Kiggavik Project, located in the Thelon Basin in Nunavut, as well as minority interests in nine other grassroots uranium projects in the Athabasca Basin.

UEX is also leading the discovery of cobalt in Canada, with three cobalt-nickel exploration projects located in the Athabasca Basin of northern Saskatchewan, including the only primary cobalt deposit in Canada. The 100% owned West Bear Project hosts the West Bear Cobalt-Nickel Deposit, the newly discovered Michael Lake Co-Ni Zone, and the West Bear Uranium Deposit. UEX also owns 100% of two early-stage cobalt exploration projects, the Axis Lake and Key West Projects.

FOR FURTHER INFORMATION PLEASE CONTACT

Roger Lemaitre

President & CEO

(306) 979-3849

www.uexcorp.com

Forward-Looking Information

This news release contains statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such statements are based on UEX's current expectations, estimates, forecasts and projections. Such forward-looking information includes statements regarding UEX's drill hole results, uranium, cobalt and nickel prices, outlook for our future operations, plans and timing for exploration activities, and other expectations, intentions and plans that are not historical fact. Such forward-looking information is based on certain factors and assumptions and is subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking information. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to the, interpretation of drill results and geology, assay confirmation, additional drilling results, continuity and grade of deposits, fluctuations in uranium, cobalt and nickel prices and currency exchange rates, changes in environmental and other laws affecting uranium, cobalt and nickel exploration and mining and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable Canadian securities commissions on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Copyright (c) 2022 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

UEX:CA,UEXCF
The Conversation (0)
Nuclear Fuels CEO and President Greg Huffman.

Nuclear Fuels Aims to Boost US Domestic Uranium Supply Chain, CEO Greg Huffman says

Issues facing the global uranium supply chain have created a significant opportunity for emerging explorers and producers to leverage the growing demand for nuclear energy and build more secure and stable domestic supply chains.

In an interview with the Investing News Network, Nuclear Fuels (CSE:NF) CEO and President Greg Huffman said his company is strategically positioned to supply growing US uranium demand by advancing its uranium projects in Wyoming.

“We have massive, massive increases in terms of expected demand for uranium,” he said. “What we at Nuclear Fuels are focused on is being able to come up with new sources of domestic US uranium to help supply that increase in demand for nuclear power.”

Keep reading...Show less

Laramide's 2024 Drill Program Continues to Return Strong Results at the Westmoreland Project in Queensland, Australia, including Notable Gold Mineralisation

Highlights:

  • Results continue to demonstrate the potential to link the Huarabagoo and Junnagunna uranium deposits
    • HJ24DD017 – 25.00m @ 393.64 ppm (0.04%) U 3 O 8 from 15.00m ,
      • including 1.00m @ 1,015.29 ppm (0.10%) U 3 O 8 from 28.00m
      • and 1.00m @ 2,128.46 ppm (0.21%) U 3 O 8 from 34.00m
    • HJ24DD019 – 6.00m @ 1,177.43 ppm (0.12%) U 3 O 8 from 87.00m ,
      • including 4.00m @ 1,520.58 ppm (0.15%) U 3 O 8 from 89.00m
  • Uranium mineralisation at Huarabagoo continues to deliver impressive results including:
    • HB24DD010 – 15.60m @ 2,237.03 ppm (0.22%) U 3 O 8 and 0.53 g/t Au from 68.40m ,
      • including 1.00m @ 2,264.06 ppm (0.23%) U 3 O 8 and 0.23 g/t Au from 70.00m
      • and 7.00m @ 4311.16 ppm (0.43%) U 3 O 8 and 0.10 g/t Au from 76.00m
      • with highest intercept result of 1.00m @ 1.42% U 3 O 8 and 0.01 g/t Au from 80.00m
  • Broad zones of gold mineralisation were also intercepted with grades up to 24.2g/t Au
    • HB24DD008 – 19.00m @ 620.58 ppm (0.06%) U 3 O 8 and 1.95 g/t Au from 48.00m ,
      • including 2.00m @ 1,720.45 ppm (0.17%) U 3 O 8 and 1.64 g/t Au from 57.00m
      • and 2.00m @ 2,202.16 ppm (0.22%) U 3 O 8 and 12.39 g/t Au from 64.00m
      • with highest intercept result of 1.00m @ 2,299.44 ppm (0.22%) U 3 O 8 and 24.20g/t Au from 65.00m
    • HB24DD006 – 8.00m @ 1,449.86 ppm (0.14%) U 3 O 8 & 0.22 g/t Au from 36.00m ,
      • including 1.70m @ 6,208.83 ppm (0.62%) U 3 O 8 & 0.78 g/t Au from 37.60m .
  • New Exploration Permit (EPM 28807) granted adjacent to Westmoreland Project adding 327km   2 of highly prospective tenure in NW Queensland

Laramide Resources Ltd. ( "Laramide" or the "Company" ) (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF), a uranium mine development and exploration company with globally significant assets in the United States and Australia is pleased to announce another batch of assay results from the 2024 drilling campaign completed at the Westmoreland Uranium Project in Queensland, Australia ( "Westmoreland" ) and the receipt of a permit for exploration for a large land package immediately east of and adjacent to the current Westmoreland land tenure.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Nuclear reactors at dusk.

NexGen Signs First Uranium Contracts, Will Sell 5 Million Pounds to US Utilities

NexGen Energy (TSX:NXE,NYSE:NXE,ASX:NXG) said on Wednesday (December 4) that it has set up its first uranium sales agreements with several leading US nuclear utility companies.

These contracts, starting in 2029, cover the delivery of 5 million pounds of uranium over a five year period and employ market-related pricing mechanisms to optimize returns by leveraging future uranium prices.

The uranium will be sourced from NexGen’s Rook I Project in Saskatchewan, Canada, which the company believes is positioned to become one of the largest uranium-mining operations globally.

Keep reading...Show less

Laramide Resources closes option agreement on exploration opportunity in Kazakhstan's prolific Chu-Sarysu Basin

Highlights:

  • Laramide has completed the agreement terms for the opportunity to explore 22 subsoil use license applications covering approximately 5,500 km 2 comprising the Chu-Sarysu Project located in the Suzak District of the South Kazakhstan Oblast, Republic of Kazakhstan .
  • The prospective land package covers an area which is proximal to some of Kazatomprom's largest uranium deposits and operational mines, including Cameco's JV project, Inkai, and Orano's JV project, Muyunkum-Tortkuduk.
  • The Chu-Sarysu Project area includes a number of mapped, paleo-channel roll-fronts, associated with uranium deposits and amenable to ISR mining.
  • Laramide will operate and fund the exploration program towards the discovery of a viable uranium resource.

Laramide Resources Ltd. ( "Laramide" or the "Company" ) (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF), a uranium mine development and exploration company with globally significant assets in the United States and Australia is pleased to announce the successful closing of a three-year option agreement (the " Option Agreement "), with an option to extend for an additional year, with Aral Resources Ltd. (" Aral "), a Kazakh company registered with the Astana International Financial Center and the shareholders of Aral (the " Optionors "). Aral has secured 22 mineral licenses covering nearly 5,500 square kilometres of the Chu-Sarysu sedimentary basin of Kazakhstan (collectively, the " Chu-Sarysu Project ").

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×