bam company

Bam Bam Adds Second Drill at Majuba Hill Porphyry Copper Project

Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) ("Bam Bam" or the "Company") is pleased to announce that a Second Drill Rig is being added at the Majuba Hill Porphyry Copper Project in Pershing County Nevada. Falcon Drilling has been engaged to drill 914 m (3000 ft) of core. The second drill rig is being added to expand the footprint of the Porphyry Copper deposit at Majuba.

Reverse-circulation ("RC") drilling with rig one began in the beginning of October and is making tremendous footage-production. The Company is very pleased with the results. The ongoing RC drilling program is focused on in-fill and expansion of the known oxide copper mineralization identified in previous drilling and mined from the historic underground Majuba Hill Mine.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/6332/99197_761ac024b49a1942_001.jpg

Figure 1

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/6332/99197_761ac024b49a1942_001full.jpg

Core drilling will be targeting the copper-gold target. Widespread soil geochemistry completed this summer has outlined a distinct copper-gold zone in a granodiorite intrusive. A mafic dike zone also cuts the widespread granodiorite intrusive. A small portion of the dike zone was mined by underground methods in the early 1900's at the historic Last Chance Mine.

The mafic dike zone is strongly coincident with a distinct magnetic anomaly from the Drone Mag Survey and a high-chargeability corridor from the most recent Induced Polarization/Resistivity Survey.

David Greenway, President and CEO, commented: "I am very pleased that we are adding a second rig at Majuba. Bam Bam's drilling at Majuba has always been based on a systematic, staged exploration approach and it is exciting that the results are driving an expanded drill program."

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps. The sample rejects and remaining pulps will be retrieved from ALS.

RSU Grant

Further, the Company has granted an aggregate 6,300,000 restricted share units (the "RSUs") to consultants and a director of the Company. The RSUs are valid for a one-year term and are governed by the Company's RSU Plan, approved by the Company's shareholders on December 2, 2019.

Qualified Person

The scientific and technical information contained in this news release has been reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who is a "Qualified Person" as such term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

On Behalf of the Board of Bam Bam Resources Corp.

"David Greenway"

David C. Greenway
President & CEO

For further information, please contact:
Joel Warawa
VP of Corporate Communications
E: jw@bambamresources.com
P: 1 (855) 475-0745

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of Bam Bam Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

###

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/99197

News Provided by Newsfile via QuoteMedia

The Conversation (0)
"investingnews"

Bam Bam Resources

Developing a Prospective High-Grade, Copper-Gold Asset with District Size Potential

Developing a Prospective High-Grade, Copper-Gold Asset with District Size Potential Keep Reading...

Onyx Gold Intersects 1.7 g/t Au over 67.0 Meters, Including 13.2 g/t over 6.0 Meters and Visible Gold Grading 73.4 g/t Au at Argus Main

Drilling Continues to Define Higher-Grade Plunging Mineralization within the 1.4-km-long Argus Gold System Onyx Gold Corp. (TSXV: ONYX,OTC:ONXGF) (OTCQX: ONXGF) ("Onyx" or the "Company") is pleased to report assay results from an additional nine (9) drill holes from the Argus Gold System... Keep Reading...
Skull Ridge Gold Acquires 17,225-Hectare Strategic Land Position Along Emerging Crippleback–Stony Lake Gold-Copper Corridor

Skull Ridge Gold Acquires 17,225-Hectare Strategic Land Position Along Emerging Crippleback–Stony Lake Gold-Copper Corridor

Skull Ridge Gold Corp. (CSE: SKUL) (“Skull Ridge” or the “Company”) is pleased to announce that it has acquired, through an arm’s-length Newfoundland prospector 689 mineral claims covering approximately 17,225 hectares in Central Newfoundland. The claims were acquired through the reimbursement... Keep Reading...
M&A written on puzzle pieces.

OceanaGold to Acquire Ausgold in US$549 Million Deal

OceanaGold (TSX:OGC,NYSE:OGC) has agreed to acquire Australian developer Ausgold (ASX:AUC,OTCPL:AUSGF) for US$549 million, securing full ownership of the Katanning gold project in Western Australia.The Ausgold board unanimously recommended the transaction, and major shareholder Dundee... Keep Reading...
American Eagle Drills One Kilometre of Copper-Gold Mineralization from Surface at NAK: 1,001 Metres of 0.46% CuEq, Including 218 Metres of 1.01% CuEq

American Eagle Drills One Kilometre of Copper-Gold Mineralization from Surface at NAK: 1,001 Metres of 0.46% CuEq, Including 218 Metres of 1.01% CuEq

Highlights: NAK26-87 intersected 1,001 metres of 0.46% copper equivalent (CuEq) starting at surface, including 218 metres of 1.01% CuEq, a full kilometre of continuous copper-gold mineralization and the longest mineralized intercept ever drilled at NAK. Kilometre-long intercepts of copper and... Keep Reading...
iMetal Resources Announces Closing of Private Placement

iMetal Resources Announces Closing of Private Placement

iMetal Resources, Inc. (TSXV: IMR,OTC:IMRFF) (OTCQB: IMRFF) (FSE: A7VA) ("iMetal" or the "Company") confirms that its previously announced non-brokered private placement (the "Offering") has now been closed. In connection with closing of the Offering, the Company issued 30,000,000 Units (each, a... Keep Reading...
Red "approved" stamp over architectural proposal with technical drawings.

Equinox Gold Secures Federal Approval for Nevada Mine

Equinox Gold (TSX:EQX,NYSEAMERICAN:EQX) has secured federal approval to build the South Railroad mine in Nevada, clearing the primary regulatory hurdle for its next major development project.The US Bureau of Land Management issued a positive record of decision for the site on Monday (August 17),... Keep Reading...

Interactive Chart

Latest Press Releases

Related News