bam company

Bam Bam Adds Second Drill at Majuba Hill Porphyry Copper Project

Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) ("Bam Bam" or the "Company") is pleased to announce that a Second Drill Rig is being added at the Majuba Hill Porphyry Copper Project in Pershing County Nevada. Falcon Drilling has been engaged to drill 914 m (3000 ft) of core. The second drill rig is being added to expand the footprint of the Porphyry Copper deposit at Majuba.

Reverse-circulation ("RC") drilling with rig one began in the beginning of October and is making tremendous footage-production. The Company is very pleased with the results. The ongoing RC drilling program is focused on in-fill and expansion of the known oxide copper mineralization identified in previous drilling and mined from the historic underground Majuba Hill Mine.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/6332/99197_761ac024b49a1942_001.jpg

Figure 1

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/6332/99197_761ac024b49a1942_001full.jpg

Core drilling will be targeting the copper-gold target. Widespread soil geochemistry completed this summer has outlined a distinct copper-gold zone in a granodiorite intrusive. A mafic dike zone also cuts the widespread granodiorite intrusive. A small portion of the dike zone was mined by underground methods in the early 1900's at the historic Last Chance Mine.

The mafic dike zone is strongly coincident with a distinct magnetic anomaly from the Drone Mag Survey and a high-chargeability corridor from the most recent Induced Polarization/Resistivity Survey.

David Greenway, President and CEO, commented: "I am very pleased that we are adding a second rig at Majuba. Bam Bam's drilling at Majuba has always been based on a systematic, staged exploration approach and it is exciting that the results are driving an expanded drill program."

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps. The sample rejects and remaining pulps will be retrieved from ALS.

RSU Grant

Further, the Company has granted an aggregate 6,300,000 restricted share units (the "RSUs") to consultants and a director of the Company. The RSUs are valid for a one-year term and are governed by the Company's RSU Plan, approved by the Company's shareholders on December 2, 2019.

Qualified Person

The scientific and technical information contained in this news release has been reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who is a "Qualified Person" as such term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

On Behalf of the Board of Bam Bam Resources Corp.

"David Greenway"

David C. Greenway
President & CEO

For further information, please contact:
Joel Warawa
VP of Corporate Communications
E: jw@bambamresources.com
P: 1 (855) 475-0745

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of Bam Bam Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

###

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/99197

News Provided by Newsfile via QuoteMedia

The Conversation (0)
"investingnews"

Bam Bam Resources

Developing a Prospective High-Grade, Copper-Gold Asset with District Size Potential

Developing a Prospective High-Grade, Copper-Gold Asset with District Size Potential Keep Reading...
Gold bars on a table in front of U.S. hundred dollar bills and stacked coins.

WGC: Investment Key Driver of Gold Demand in Q3 2025

Investor appetite for safe-haven assets resulted in a record quarter for gold demand in Q3 2025, according to the World Gold Council’s (WGC) latest report.The WGC published its Gold Demand Trends Q3 report on October 30, which clearly demonstrates that investor demand for gold is exploding as... Keep Reading...
Gold bars, coins, and cash with financial chart and green arrows in the background.

Gold Miners Ride Record Prices to Strong Q3 Results

Global gold producers reported robust third-quarter earnings on the back of record bullion prices. The yellow metal surged to its all-time high of US$4,379.13 on October 17, 2025, coming off the back of rising geopolitical and economic tensions that reignited safe-haven demand.The metal broke... Keep Reading...
LAURION Starts defining Gold Mineralization North and Northeast of the Brenbar Shaft, Highlighting 2.68 g/t Au over 1.05 m from 117.6 m to 118.65 m

LAURION Starts defining Gold Mineralization North and Northeast of the Brenbar Shaft, Highlighting 2.68 g/t Au over 1.05 m from 117.6 m to 118.65 m

(TheNewswire) Toronto, Ontario November 4, 2025 TheNewswire - Laurion Mineral Exploration Inc. (TSX.V: LME | OTC: LMEFF) ("LAURION" or the "Corporation") is pleased to announce encouraging results from its 7,700-metre Summer 2025 drill exploration program at the 100%-owned Ishkõday Project,... Keep Reading...
Significant Gold Discoveries Continue at Golden Gate - Drilling Hits 253.0m @ 1.5 g/t Au from Surface and Open in all Directions Ending in Mineralisation

Significant Gold Discoveries Continue at Golden Gate - Drilling Hits 253.0m @ 1.5 g/t Au from Surface and Open in all Directions Ending in Mineralisation

Drilling Confirms Discovery Status at Horse Heaven’s Golden Gate Target with Three Consecutive Holes Ending in Mineralisation, Identifying the Large Intrusion-Related Gold System Only 16km from the Stibnite Gold Project (PPTA.NAS)

Resolution Minerals Ltd (ASX: RML; OTCQB: RLMLF) (“Resolution” or “Company”) is pleased to report that its maiden drill program at its 100% owned Horse Heaven Gold-Antimony-Tungsten- Silver Project (“Horse Heaven” or the “Project”), Idaho, USA (Figure 1) has delivered additional broad intervals... Keep Reading...
Trigg Minerals Managing Director Andre Booyzen.

Trigg Minerals Poised for 2027 Production as Push for Domestic Critical Minerals Supply Heightens

As global supply chains tighten under China’s growing dominance in critical minerals, Trigg Minerals (ASX:TMG,OTCQB:TMGLF) is moving quickly to advance its Antimony Canyon and Tennessee Mountain projects toward production by 2027.In a recent interview with the Investing News Network, Managing... Keep Reading...

Latest Press Releases

Related News