bam company

Bam Bam Adds Second Drill at Majuba Hill Porphyry Copper Project

Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) ("Bam Bam" or the "Company") is pleased to announce that a Second Drill Rig is being added at the Majuba Hill Porphyry Copper Project in Pershing County Nevada. Falcon Drilling has been engaged to drill 914 m (3000 ft) of core. The second drill rig is being added to expand the footprint of the Porphyry Copper deposit at Majuba.

Reverse-circulation ("RC") drilling with rig one began in the beginning of October and is making tremendous footage-production. The Company is very pleased with the results. The ongoing RC drilling program is focused on in-fill and expansion of the known oxide copper mineralization identified in previous drilling and mined from the historic underground Majuba Hill Mine.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/6332/99197_761ac024b49a1942_001.jpg

Figure 1

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/6332/99197_761ac024b49a1942_001full.jpg

Core drilling will be targeting the copper-gold target. Widespread soil geochemistry completed this summer has outlined a distinct copper-gold zone in a granodiorite intrusive. A mafic dike zone also cuts the widespread granodiorite intrusive. A small portion of the dike zone was mined by underground methods in the early 1900's at the historic Last Chance Mine.

The mafic dike zone is strongly coincident with a distinct magnetic anomaly from the Drone Mag Survey and a high-chargeability corridor from the most recent Induced Polarization/Resistivity Survey.

David Greenway, President and CEO, commented: "I am very pleased that we are adding a second rig at Majuba. Bam Bam's drilling at Majuba has always been based on a systematic, staged exploration approach and it is exciting that the results are driving an expanded drill program."

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps. The sample rejects and remaining pulps will be retrieved from ALS.

RSU Grant

Further, the Company has granted an aggregate 6,300,000 restricted share units (the "RSUs") to consultants and a director of the Company. The RSUs are valid for a one-year term and are governed by the Company's RSU Plan, approved by the Company's shareholders on December 2, 2019.

Qualified Person

The scientific and technical information contained in this news release has been reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who is a "Qualified Person" as such term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR) (OTC Pink: NPEZF) (FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

On Behalf of the Board of Bam Bam Resources Corp.

"David Greenway"

David C. Greenway
President & CEO

For further information, please contact:
Joel Warawa
VP of Corporate Communications
E: jw@bambamresources.com
P: 1 (855) 475-0745

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of Bam Bam Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

###

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/99197

News Provided by Newsfile via QuoteMedia

The Conversation (0)
"investingnews"

Bam Bam Resources

Developing a Prospective High-Grade, Copper-Gold Asset with District Size Potential

Developing a Prospective High-Grade, Copper-Gold Asset with District Size Potential Keep Reading...
Don Durrett, gold and silver bars.

Don Durrett: Gold, Silver Prices Going Higher, Watch These Stocks

Don Durrett of GoldStockData.com explains why gold's record-setting price run isn't over. "The reason gold is at US$5,000 (per ounce) and going higher is because the US bond market is fragile and becoming more fragile every day," he said. "But not only that — I've said this — it's going to fail,... Keep Reading...
Kalgoorlie Gold Mining Managing Director Matt Painter.

Kalgoorlie Gold Mining Targets Multimillion-Ounce Deposit in a Proven Gold Corridor

Kalgoorlie Gold Mining (ASX:KAL) is advancing a focused exploration strategy aimed at uncovering a multimillion-ounce gold resource within one of Western Australia’s most established gold corridors. With the gold price strengthening and regional activity accelerating, the company is intensifying... Keep Reading...
Mayfair Gold CEO Nicholas Campbell.

Mayfair Gold Begins NYSE American Trading, Fast Tracks Fenn-Gib Project

Mayfair Gold (TSXV:MFG,NYSEAMERICAN:MINE) reached a significant milestone by officially commencing trading on the NYSE American under the ticker "MINE." This strategic move from the OTCQX aims to broaden the company's US shareholder base as it fast tracks its flagship property, the Fenn-Gib gold... Keep Reading...
First Development Resources

Selta Project - Gold Exploration Update

First Development Resources plc (AIM: FDR), a UK-based, Australia-focused mineral exploration company with interests in Western Australia and the Northern Territory, is pleased to provide an update on its gold ("Au") focused exploration at the Selta Project ("Selta" or the "Project"), located in... Keep Reading...
Tectonic Metals (TSXV:TECT)

Tectonic Metals Drills 4.50 g/t Au over 48.77 metres with 7.79 g/t Au over 24.38 metres at New Target, Flat Gold Project, Alaska

First-Ever Drilling by Tectonic at Black Creek Intrusion Delivers High-Grade Gold Six Kilometres North of Chicken Mountain, Validating Multi-Intrusion Gold System Across 99,800-Acre Flat Property VANCOUVER, BC / ACCESS Newswire / January 29, 2026 / Tectonic Metals Inc. ("Tectonic" or the... Keep Reading...
Flow Metals Provides Structural Interpretation Update from Sixtymile Gold Project

Flow Metals Provides Structural Interpretation Update from Sixtymile Gold Project

Flow Metals Corp. (CSE: FWM) ("Flow Metals" or the "Company") is pleased to announce a technical update on its Sixtymile Gold Project, Yukon. Recent re-logging of historic drill core has resulted in a revised structural interpretation of gold mineralization.The revised interpretation supports a... Keep Reading...

Interactive Chart

Latest Press Releases

Related News