MAG Silver Reports Second Quarter Financial Results

MAG Silver Corp. (TSX NYSE American: MAG) ("MAG", or the "Company") announces the Company's unaudited consolidated financial results for the three months ended June 30, 2024 ("Q2 2024"). For details of the unaudited condensed interim consolidated financial statements of the Company for the three and six months ended June 30, 2024 ("Q2 2024 Financial Statements") and management's discussion and analysis for the three and six months ended June 30, 2024 ("Q1 2024 MD&A"), please see the Company's filings on the System for Electronic Document Analysis and Retrieval Plus ("SEDAR+") at ( www.sedarplus.ca ) or on the Electronic Data Gathering, Analysis, and Retrieval ("EDGAR") at ( www.sec.gov ).

All amounts herein are reported in $000s of United States dollars ("US$") unless otherwise specified (C$ refers to thousands of Canadian dollars).

KEY HIGHLIGHTS FOR Q2 2024 (on a 100% basis unless otherwise noted)

  • MAG reported net income of $21,614 ($0.21 per share) driven by income from Juanicipio (equity accounted) of $25,123, and adjusted EBITDA 1 of $50,353.
  • A total of 336,592 tonnes of ore at a silver head grade of 498 grams per tonne ("g/t") (equivalent silver head grade 2 746 g/t) was processed at Juanicipio.
  • Juanicipio achieved silver production and equivalent silver production 2 of 5.0 and 7.1 million ounces, respectively.
  • Juanicipio generated strong operating cash flow of $92,766 and free cash flow 1 of $88,637.
  • Building on the robust Q1 2024 cost performance, Juanicipio continued to improve with cash cost 1 of $1.15 per silver ounce sold ($8.86 per equivalent silver ounce sold 3 ) and all-in sustaining cost 1 of $4.49 per silver ounce sold ($11.31 per equivalent silver ounce sold 3 ).
  • With the continued operational outperformance in the first half of 2024, full year guidance has been increased. As reported by Fresnillo plc ("Fresnillo"), Juanicipio's operator, silver head grade at Juanicipio is expected to be between 420g/t and 460g/t for 2024 (previously 380g/t to 420g/t). Juanicipio is expected to produce between 16.3 million and 17.3 million (previously 14.3 million and 15.8 million) silver ounces yielding between 14.5 million and 15.4 million (previously 13.2 million and 14.6 million) silver ounces sold at all-in sustaining costs 1 of between $8.50 and $9.25 (previously $9.50 and $10.50) per silver ounce sold.
  • Juanicipio returned a total of $29,818 in interest and loan principal repayments to MAG further augmenting MAG's liquidity position to $97,337 million at the end of the quarter.

CORPORATE

  • On May 15, 2024, MAG announced that the Toronto Stock Exchange ("TSX") had accepted the Company's Notice of Intention to Make a Normal Course Issuer Bid ("NCIB"). Under the NCIB, the Company may purchase for cancellation up to an aggregate of 8,643,374 common shares of the Company ("Common Shares"), representing approximately 10% of the public float (as defined in the rules and policies of the TSX) of the Common Shares as of May 8, 2024.
  • On May 31, 2024, MAG filed a final short form base shelf prospectus with the securities commissions in all of the provinces and territories of Canada ("Final Shelf Prospectus") and a corresponding registration statement on Form F-10 with the United States Securities and Exchange Commission under the United States Securities Act of 1933, as amended and the U.S./Canada Multijurisdictional Disclosure System allowing the Company to offer up to $250,000 of common shares, preferred shares, debt securities, subscription receipts, units and warrants or any combination thereof during the 25-month period that the Final Shelf Prospectus remains effective. In order to maintain financial flexibility, and consistent with past practice, the Company has historically maintained a base shelf prospectus, and has no present intention to offer securities pursuant to this Final Shelf Prospectus.
  • The Company published its 2023 sustainability report on July 18, 2024, underscoring its continued commitment to transparency with its stakeholders while providing a comprehensive overview of the Company's environmental, social and governance ("ESG") performance for 2023. A copy of MAG's 2023 sustainability report and 2023 ESG Data Table are available on the Company's website at https://magsilver.com/esg/reports/ 4 .

EXPLORATION

  • Juanicipio:
    • Underground infill drilling at Juanicipio continued in Q2 2024 primarily focussed on upgrading mineralization in areas expected to be mined in the near to mid-term. During Q2 2024, 10,699 metres were drilled from underground.
    • Surface drilling focused on expanding and upgrading the deeper zones and broader regional exploration started in April 2024 and is currently focused on the Cañada-Honda Structure. 4,546 metres have been drilled from surface during Q2 2024.
    • During 2024, Juanicipio plans to drill a total of 50,000 metres, with 33,000 metres from underground and 17,000 metres from surface.
  • Deer Trail Project, Utah:
    • Drilling moved on to Phase 4 in the last quarter of 2023 and continued through Q2 2024, focussed on lower elevations and aimed at offsetting the Carissa discovery and testing other high-potential targets in the Deer Trail mine area. During Q2 2024, 1,610 metres were drilled with results pending.
    • On July 11, 2024, MAG reported that the Deer Trail Project was being affected by the Silver King Fire in Piute County with a temporary pause of exploration operations with all personnel safe and the Deer Trail site and infrastructure secure. As of July 29, 2024, 82% of the fire has been contained and the Company has resumed exploration operations.
  • Larder Project, Ontario:
    • Drilling at Cheminis, Bear and new regional targets, totalled 10,776 metres in Q2 2024. Targets tested include:
      • the down plunge extension of the high-grade "double knuckle" at the Bear East zone;
      • the "Twist" zone in an underexplored area along the Cadillac-Larder Break ("CLB") where the major structure switches from south dipping to north dipping, which is located between Cheminis and Bear;
      • the extension of the Cheminis south mine sequence down plunge to 900 vertical metres; and
      • regional targets along the second order structure and unconformity.
    • Cheminis Update: The final two holes of the current Cheminis drilling program totalled 1,455 metres and were designed to delineate the mine sequence down from the 700 metre level to the 900 metre level. Both holes have extended the ore shoots from surface down to 900 metres below surface doubling the depth extent of known mineralization at the Cheminis mine which remains open at depth.
      Bear Update: Two directional holes totalling 126 metres, extended the Bear East zone down plunge 1,200 metres below surface, intersecting gold mineralization within a mixing zone of strongly altered komatiites-syenites and ultramafics. Bear East remains open in all directions.
      Twist Update: The Twist target was identified in the geololgical review program of 2023, where the CLB main structure switches from south dipping (Cheminis) to north dipping (Bear). It is interpreted to host a potential dilation zone either in the central part of the fold/fault or along the limbs, similar to the historic Kerr Addison mine 5km east of the Larder Project. In Q2 2024 initial drilling started and 4,830 metres have been drilled testing this target. Assays received to date have identified an alteration zone, that is hosted in multiple rock types including volcanics, mafic tuff, sediments and syenites, which is atypical along the CLB. The alteration consists of pervasive silica-carbonate-sericite and the structures associated with the widespread zones are indicative of a series of brittle shears likely sourced from a larger central dilation zone. Approximately 10 holes in total are planned for this target, with 7 remaining.
      Regional Targets: The first set of regional targets lie along a 4km second order structure and unconformity and have been identified through Magnetotellurics-Induced Polarization ("MT-IP") geophysics, surface mapping/sampling and geological importance. Targets include mixed zones of greywackes, trachytes, syenites, conglomerates and volcanics, litho-structural breaks in the MT-IP survey and alteration packages identified on the surface including hydrothermally altered conglomerates and syenites. During Q2 2024, 9 holes were drilled for a total of 4,655 metres with results pending.

________________________
1
Adjusted EBITDA, cash cost per ounce, all-in sustaining cost per ounce and free cash flow are non-IFRS measures, please see below " Non-IFRS Measures " section and section 12 of the Q2 2024 MD&A for a detailed reconciliation of these measures to the Q2 2024 Financial Statements.
2 Equivalent silver head grade and equivalent silver production have been calculated using the following price assumptions to translate gold, lead and zinc to "equivalent" silver head grade and "equivalent" silver production: $23/oz silver, $1,950/oz gold, $0.95/lb lead and $1.15/lb zinc.
3 Equivalent silver ounces sold have been calculated using realized prices to translate gold, lead and zinc to "equivalent" silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Three months ended June 30, 2024 realized prices: $30.17/oz silver, $2,379.85/oz gold, $0.99/lb lead and $1.33/lb zinc.
4 Information contained in or otherwise accessible through the Company's website, including the 2023 sustainability report and 2023 ESG Data Table, do not form part of this MD&A and are not incorporated into this MD&A by reference.

JUANICIPIO RESULTS

All results of Juanicipio in this section are on a 100% basis, unless otherwise noted.

Operating Performance

The following table and subsequent discussion provide a summary of the operating performance of Juanicipio for the three months ended June 30, 2024 and 2023, unless otherwise noted.

Key mine performance data of Juanicipio (100% basis) Three months ended
June 30, June 30,
2024 2023
Metres developed (m) 3,520 3,434
Material mined (t) 349,460 259,438
Material processed (t) 336,592 377,718
Silver head grade (g/t) 498 498
Gold head grade (g/t) 1.20 1.25
Lead head grade (%) 1.56 % 1.05 %
Zinc head grade (%) 2.99 % 1.92 %
Equivalent silver head grade (g/t) (1) 746 708
Silver ounces sold (koz) 4,272 4,877
Gold ounces sold (koz) 7.20 9.54
Lead pounds sold (klb) 9,224 6,760
Zinc pounds sold (klb) 15,237 10,103
Equivalent silver ounces sold (koz) (2) 5,817 6,390

(1) Equivalent silver head grades have been calculated using the following price assumptions to translate gold, lead and zinc to "equivalent" silver head grade in 2024: $23/oz silver, $1,950/oz gold, $0.95/lb lead and $1.15/lb zinc (2023: $21.85/oz silver, $1,775/oz gold, $0.915/lb lead and $1.30/lb zinc).
(2) Equivalent silver ounces sold have been calculated using realized prices to translate gold, lead and zinc to "equivalent" silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Three months ended June 30, 2024 realized prices: $30.17/oz silver, $2,379.85/oz gold, $0.99/lb lead and $1.33/lb zinc (three months ended June 30, 2023 realized prices: $23.69/oz silver, $1,957.47/oz gold, $0.94/lb lead and $1.07/lb zinc).

During the three months ended June 30, 2024, a total of 349,460 tonnes of ore were mined. This represents an increase of 35% over Q2 2023. Increases in mined tonnages at Juanicipio have been driven by the operational ramp-up of the mine towards steady mining and milling targets.

During the three months ended June 30, 2024, a total of 336,592 tonnes of ore were processed through the Juanicipio plant; no ore was processed at the nearby Fresnillo and Saucito processing plants (100% owned by Fresnillo). The 11% decrease over Q2 2023 was mainly attributable to Juanicipio capitalizing on available milling capacity at the nearby Fresnillo and Saucito plants (100% owned by Fresnillo) while undergoing operational ramp-up and processing facility commissioning in the first half of 2023.

The silver head grade and equivalent silver head grade for the ore processed in the three months ended June 30, 2024 was 498 g/t and 746 g/t, respectively (three months ended June 30, 2023: 498 g/t and 708 g/t, respectively). Head grades in Q2 2024 were slightly higher than Q2 2023 (5% on a silver equivalent basis, with silver head grade being consistent), due to low-grade commissioning stockpiles being processed through the Juanicipio plant in the first half of 2023. Silver metallurgical recovery during the three months ending June 30, 2024 was 92% (three months ending June 30, 2023: 87%) reflecting the commencement of commercial pyrite production during Q2 2024 delivering incremental silver and gold recovery as well as ongoing optimizations in the processing plant.

The following table provides a summary of the total cash costs and all-in sustaining costs ("AISC") of Juanicipio for the three months ended June 30, 2024, and 2023.

Key mine performance data of Juanicipio (100% basis) Three months ended
June 30, June 30,
2024 2023
Total cash costs (1) 4,911 35,584
Cash cost per silver ounce sold ($/oz) (1) 1.15 7.30
Cash cost per equivalent silver ounce sold ($/oz) (1) 8.86 11.18
All-in sustaining costs (1) 19,161 48,456
All-in sustaining cost per silver ounce sold ($/oz) (1) 4.49 9.93
All-in sustaining cost per equivalent silver ounce sold ($/oz) (1) 11.31 13.19

(1) Total cash costs, cash cost per ounce, cash cost per equivalent ounce, all-in sustaining costs, all-in sustaining cost per ounce, and all-in sustaining cost per equivalent ounce are non-IFRS measures, please see below "Non-IFRS Measures" section and section 12 of the Q2 2024 MD&A for a detailed reconciliation of these measures to the Q2 2024 Financial Statements. Equivalent silver ounces sold have been calculated using realized prices to translate gold, lead and zinc to "equivalent" silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Three months ended June 30, 2024 realized prices: $30.17/oz silver, $2,379.85/oz gold, $0.99/lb lead and $1.33/lb zinc (three months ended June 30, 2023 realized prices: $23.69/oz silver, $1,957.47/oz gold, $0.94/lb lead and $1.07/lb zinc).

Financial Results

The following table presents excerpts of the financial results of Juanicipio for the three months ended June 30, 2024 and 2023.

Three months ended
June 30, June 30,
2024 2023
$ $
Sales 167,079 134,775
Cost of sales:
Production cost (39,866 ) (54,571 )
Depreciation and amortization (22,455 ) (17,400 )
Gross profit 104,757 62,804
Consulting and administrative expenses (4,283 ) (4,159 )
Extraordinary mining and other duties (2,773 ) (1,377 )
Interest expense (3,241 ) (4,886 )
Exchange gains (losses) and other 696 31
Net income before tax 95,156 52,413
Income tax (expense) recovery (41,299 ) (6,349 )
Net income (100% basis) 53,857 46,065
MAG's 44% portion of net income 23,697 20,268
Interest on Juanicipio loans - MAG's 44% 1,426 2,150
MAG's 44% equity income 25,123 22,418


Sales increased by $32,304 during the three months ended June 30, 2024, mainly due to 25% higher realized metal prices and $8,217 lower treatment, refining and toll milling costs driven mainly by no toll milling at the Saucito and Fresnillo processing facilities during Q2 2024 vs toll milling in Q2 2023 – as explained in ‘ Juanicipio Results – Operating Performance ' section above, offset by 5% lower metal volumes.

Production costs decreased by $14,705 to Juanicipio depleting higher-cost, lower-grade commissioning stockpiles during operational ramp-up and processing facility commissioning in the first half of 2023.

Depreciation increased by $5,056 as the Juanicipio mill achieved commercial production and commenced depreciating the processing facility and associated equipment in June 2023.

Cash operating margin increased from 60% to 76%, mainly due to reduced operating costs as well as positive commodity prices augmented by operational leverage and no processing at the nearby Fresnillo and Saucito processing facilities.

Other expenses decreased by $790 mainly as a result of higher exchange gains ($664) and lower interest expense ($1,645) as Juanicipio reduced its outstanding shareholder loans balance by $173,339 ($156,859 loan repayments and $16,480 converted to equity) over the course of September 2023 to June 2024, offset by higher extraordinary mining and other duties ($1,396) which were impacted by the commencement of pyrite production during Q2 2024.

Taxes increased by $34,951 mainly due to non-cash deferred tax charges on fixed assets driven by a weakening in the Mexican peso versus the US dollar, as well as higher taxable profits generated during Q2 2024.

Ore Processed at Juanicipio Plant (100% basis)

Three Months Ended June 30, 2024 (336,592 tonnes processed) Three Months Ended
June 30, 2023
Amount

$
Metals Sold Quantity Average Price
$
Amount
$
Silver 4,271,991 ounces 30.17 per oz 128,876 115,555
Gold 7,195 ounces 2,380 per oz 17,124 18,668
Lead 4,184 tonnes 0.99 per lb. 9,151 6,367
Zinc 6,911 tonnes 1.33 per lb. 20,333 10,807
Treatment, refining, and other processing costs ( 2 ) (8,405 ) (16,622 )
Sales 167,079 134,775
Production cost (39,866 ) (54,571 )
Depreciation and amortization ( 1 ) (22,455 ) (17,400 )
Gross Profit 104,757 62,804

(1) The underground mine was considered readied for its intended use on January 1, 2022, whereas the Juanicipio processing facility started commissioning and ramp-up activities in January 2023, achieving commercial production status on June 1, 2023.
(2) Includes toll milling costs from processing mineralized material at the Saucito and Fresnillo plants for Q2 2023.

Sales and treatment charges are recorded on a provisional basis and are adjusted based on final assay and pricing adjustments in accordance with the offtake contracts.

MAG FINANCIAL RESULTS – THREE MONTHS ENDED JUNE 30, 2024

As at June 30, 2024, MAG had working capital of $96,460 (December 31, 2023: $67,262) including cash of $97,337 (December 31, 2023: $68,707) and no long-term debt. As well, as at June 30, 2024, Juanicipio had working capital of $129,111 including cash of $51,422 (MAG's attributable share is 44%).

The Company's net income for the three months ended June 30, 2024 amounted to $21,614 (June 30, 2023: $19,390) or $0.21/share (June 30, 2023: $0.19/share). MAG recorded its 44% income from equity accounted investment in Juanicipio of $25,123 (March 31, 2023: $22,419) which included MAG's 44% share of net income from operations as well as loan interest earned on loans advanced to Juanicipio (see above for a discussion of MAG's share of income from its equity accounted investment in Juanicipio).

For the three months ended
June 30, June 30,
2024 2023
$ $
Income from equity accounted investment in Juanicipio 25,123 22,419
General and administrative expenses (3,622 ) (3,233 )
General exploration and business development (95 ) (40 )
Operating income 21,406 19,146
Interest income 928 641
Other income 650 233
Financing costs (134 ) -
Foreign exchange gain (loss) 60 168
Income before income tax 22,910 20,188
Deferred income tax expense (1,296 ) (798 )
Net income 21,614 19,390


NON-IFRS MEASURES

The following table provides a reconciliation of cash cost per silver ounce of Juanicipio to production cost of Juanicipio on a 100% basis (the nearest IFRS measure) as presented in the notes to the Q2 2024 Financial Statements.

Three months ended June 30,
(in thousands of US$, except per ounce amounts) 2024 2023
Production cost as reported 39,866 54,571
Depreciation on inventory movements 474 (1,145 )
Adjusted production cost 40,340 53,426
Treatment, refining, and other processing costs 8,405 16,622
By-product revenues (2) (46,608 ) (35,842 )
Extraordinary mining and other duties 2,773 1,377
Total cash costs (1) 4,911 35,584
Add back by-product revenues (2) 46,608 35,842
Total cash costs for equivalent silver (1) 51,519 71,426
Silver ounces sold 4,271,991 4,877,460
Equivalent silver ounces sold (3) 5,816,940 6,390,310
Cash cost per silver ounce sold ($/ounce) 1.15 7.30
Cash cost per equivalent silver ounce sold ($/ounce) 8.86 11.18

(1) As Q3 2023 represented the first full quarter of commercial production, information presented for total cash costs and total cash costs for equivalent silver together with their associated per unit values are not directly comparable.
(2) By-product revenues relate to the sale of other metals namely gold, lead, and zinc.
(3) Equivalent silver ounces sold have been calculated using realized prices to translate gold, lead and zinc to "equivalent" silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Three months ended June 30, 2024 realized prices: $30.17/oz silver, $2,379.85/oz gold, $0.99/lb lead and $1.33/lb zinc (three months ended June 30, 2023 realized prices: $23.69/oz silver, $1,957.47/oz gold, $0.94/lb lead and $1.07/lb zinc).

The following table provides a reconciliation of AISC of Juanicipio to production cost and various operating expenses of Juanicipio on a 100% basis (the nearest IFRS measure), as presented in the notes to the Q2 2024 Financial Statements.

Three months ended June 30,
(in thousands of US$, except per ounce amounts) 2024 2023
Total cash costs 4,911 35,584
General and administrative expenses 4,283 4,159
Exploration 2,235 1,928
Sustaining capital expenditures 7,329 6,535
Sustaining lease payments 349 199
Interest on lease liabilities (17 ) (11 )
Accretion on closure and reclamation costs 72 62
All-in sustaining costs (1) 19,161 48,456
Add back by-product revenues (2) 46,608 35,842
All-in sustaining costs for equivalent silver (1) 65,768 84,298
Silver ounces sold 4,271,991 4,877,460
Equivalent silver ounces sold (3) 5,816,940 6,390,310
All-in sustaining cost per silver ounce sold ($/ounce) 4.49 9.93
All-in sustaining cost per equivalent silver ounce sold ($/ounce) 11.31 13.19
Average realized price per silver ounce sold ($/ounce) 30.17 23.69
All-in sustaining margin ($/ounce) 25.68 13.76
All-in sustaining margin ($/equivalent ounce) 18.86 10.50
All-in sustaining margin 109,715 67,099

(1) As Q3 2023 represented the first full quarter of commercial production, information presented for all-in sustaining costs, all-in sustaining costs for equivalent silver, and all-in sustaining margin together with their associated per unit values are not directly comparable.
(2) By-product revenues relate to the sale of other metals namely gold, lead, and zinc.
(3) Equivalent silver ounces sold have been calculated using realized prices to translate gold, lead and zinc to "equivalent" silver ounces sold (metal quantity, multiplied by metal price, divided by silver price). Three months ended June 30, 2024 realized prices: $30.17/oz silver, $2,379.85/oz gold, $0.99/lb lead and $1.33/lb zinc (three months ended June 30, 2023 realized prices: $23.69/oz silver, $1,957.47/oz gold, $0.94/lb lead and $1.07/lb).

For the three months ended June 30, 2024 the Company incurred corporate G&A expenses of $3,473 (three months ended June 30, 2023: $3,175), which exclude depreciation expense.

The Company's attributable silver ounces sold and equivalent silver ounces sold for the three months ended June 30, 2024 were 1,879,676 and 2,559,454 respectively (three months ended June 30, 2023: 2,146,082 and 2,811,736 respectively), resulting in additional all‐in sustaining cost for the Company of $1.85/oz and $1.36/oz respectively (three months ended June 30, 2023: $1.48/oz and $1.13/oz respectively), in addition to Juanicipio's all-in-sustaining costs presented in the above table.

The following table provides a reconciliation of EBITDA and Adjusted EBITDA attributable to the Company based on its economic interest in Juanicipio to net income (the nearest IFRS measure) of the Company per the Q2 2024 Financial Statements. All adjustments are shown net of estimated income tax.

Three months ended June 30,
(in thousands of US$) 2024 2023
Net income after tax 21,614 19,390
Add back (deduct):
Taxes 1,296 798
Depreciation and depletion 149 58
Finance costs (income and expenses) (1,504 ) (1,042 )
EBITDA (1) 21,555 19,204
Add back (deduct):
Adjustment for non-cash share-based compensation 1,053 1,012
Share of net earnings related to Juanicipio (25,123 ) (22,419 )
MAG attributable interest in Junicipio Adjusted EBITDA 52,868 32,859
Adjusted EBITDA (1) 50,353 30,656

(1) As Q3 2023 represents the first full quarter of commercial production, information presented for EBITDA and Adjusted EBITDA is not directly comparable.

The following table provides a reconciliation of free cash flow of Juanicipio to its cash flow from operating activities on a 100% basis (the nearest IFRS measure), as presented in the notes to the Q2 2024 Financial Statements.

Three months ended June 30,
(in thousands of US$) 2024 2023
Cash flow from operating activities 92,766 33,557
Less:
Cash flow used in investing activities (3,780 ) (26,125 )
Sustaining lease payments (349 ) (199 )
Juanicipio free cash flow (1) 88,637 7,233

(1) As Q3 2023 represents the first full quarter of commercial production, comparative information presented for free cash flow of Juanicipio is not directly comparable.

Qualified Persons: All scientific or technical information in this press release including assay results referred to, mineral resource estimates and mineralization, if applicable, is based upon information prepared by or under the supervision of, or has been approved by Gary Methven, P.Eng., Vice President, Technical Services and Lyle Hansen, P.Geo, Geotechnical Director; both are "Qualified Persons" for purposes of National Instrument 43-101, Standards of Disclosure for Mineral Projects .

About MAG Silver Corp.

MAG Silver Corp. is a growth-oriented Canadian mining and exploration company focused on advancing high-grade, district scale precious metals projects in the Americas. MAG is emerging as a top-tier primary silver mining company through its (44%) joint venture interest in the 4,000 tonnes per day Juanicipio Mine, operated by Fresnillo plc (56%). The mine is located in the Fresnillo Silver Trend in Mexico, the world's premier silver mining camp, where in addition to underground mine production and processing of high-grade mineralised material, an expanded exploration program is in place targeting multiple highly prospective targets. MAG is also executing multi-phase exploration programs at the 100% earn-in Deer Trail Project in Utah and the 100% owned Larder Project, located in the historically prolific Abitibi region of Canada.

Neither the Toronto Stock Exchange nor the NYSE American has reviewed or accepted responsibility for the accuracy or adequacy of this press release, which has been prepared by management.

Certain information contained in this release, including any information relating to MAG's future oriented financial information, are "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian and United States securities legislation (collectively herein referred as "forward-looking statements"), including the "safe harbour" provisions of provincial securities legislation, the U.S. Private Securities Litigation Reform Act of 1995, Section 21E of the U.S. Securities Exchange Act of 1934, as amended and Section 27A of the U.S. Securities Act. Such forward-looking statements include, but are not limited to:

  • statements that address maintaining the nameplate 4,000 tpd milling rate at Juanicipio;
  • statements that address our expectations regarding exploration and drilling;
  • statements regarding production expectations and nameplate;
  • statements regarding the expected use of the Credit Facility;
  • statements regarding the NCIB and any future purchases to be made thereunder;
  • statements regarding the Final Shelf Prospectus;
  • statements regarding the additional information from future drill programs;
  • estimated future exploration and development operations and corresponding expenditures and other expenses for specific operations;
  • the expected capital, sustaining capital and working capital requirements at Juanicipio, including the potential for additional cash calls;
  • expected upside from additional exploration;
  • expected results from Deer Trail Project drilling;
  • expected results from Larder Project at the Fernland, Cheminis, Bear, and Twist zones and other regional targets;
  • expected capital requirements and sources of funding; and
  • other future events or developments.

When used in this release, any statements that express or involve discussions with respect to predictions, beliefs, plans, projections, objectives, assumptions or future events of performance (often but not always using words or phrases such as "anticipate", "believe", "estimate", "expect", "intend", "plan", "strategy", "goals", "objectives", "project", "potential" or variations thereof or stating that certain actions, events, or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions), as they relate to the Company or management, are intended to identify forward-looking statements. Such statements reflect the Company's current views with respect to future events and are subject to certain known and unknown risks, uncertainties and assumptions.

Forward-looking statements are necessarily based upon estimates and assumptions, which are inherently subject to significant business, economic and competitive uncertainties and contingencies, many of which are beyond the Company's control and many of which, regarding future business decisions, are subject to change. Assumptions underlying the Company's expectations regarding forward-looking statements contained in this release include, among others: MAG's ability to carry on its various exploration and development activities including project development timelines, the timely receipt of required approvals and permits, the price of the minerals produced, the costs of operating, exploration and development expenditures, the impact on operations of the Mexican tax and legal regimes, MAG's ability to obtain adequate financing, outbreaks or threat of an outbreak of a virus or other contagions or epidemic disease will be adequately responded to locally, nationally, regionally and internationally.

Although MAG believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. These forward-looking statements involve known and unknown risks, uncertainties and many factors could cause actual results, performance or achievements to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements including amongst others: commodities prices; changes in expected mineral production performance; unexpected increases in capital costs or cost overruns; exploitation and exploration results; continued availability of capital and financing; general economic, market or business conditions; risks relating to the Company's business operations; risks relating to the financing of the Company's business operations; risks related to the Company's ability to comply with restrictive covenants and maintain financial covenants pursuant to the terms of the Credit Facility; the expected use of the Credit Facility; risks relating to the development of Juanicipio and the minority interest investment in the same; risks relating to the Company's property titles; risks related to receipt of required regulatory approvals; pandemic risks; supply chain constraints and general costs escalation in the current inflationary environment heightened by the invasion of Ukraine by Russia and the events relating to the Israel-Hamas war; risks relating to the Company's financial and other instruments; operational risk; environmental risk; political risk; currency risk; market risk; capital cost inflation risk; risk relating to construction delays; the risk that data is incomplete or inaccurate; the risks relating to the limitations and assumptions within drilling, engineering and socio-economic studies relied upon in preparing economic assessments and estimates, including the updated Technical Report filed on March 27, 2024; as well as those risks more particularly described under the heading "Risk Factors" in the Company's Annual Information Form dated March 27, 2024 available under the Company's profile on SEDAR+ at www.sedarplus.ca .

Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described herein. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. The Company's forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made and, other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations or opinions should change. For the reasons set forth above, investors should not attribute undue certainty to or place undue reliance on forward-looking statements.

Please Note: Investors are urged to consider closely the disclosures in MAG's annual and quarterly reports and other public filings, accessible through the Internet at www.sedarplus.ca and www.sec.gov .

LEI: 254900LGL904N7F3EL14


For further information on behalf of MAG Silver Corp., please contact Fausto Di Trapani, Chief Financial Officer. Phone: (604) 630-1399                         Toll Free: (866) 630-1399 Email: info@magsilver.com

Primary Logo

News Provided by GlobeNewswire via QuoteMedia

MAG:CA,MAG
The Conversation (0)

MAG Silver Announces Filing of Final Base Shelf Prospectus

MAG Silver Corp. (TSX NYSE American: MAG) ("MAG", or the " Company ") today announced that it has obtained a receipt for the final short form base shelf prospectus (the " Final Shelf Prospectus ") filed with the securities commissions in all of the provinces and territories of Canada. A corresponding registration statement on Form F-10 has been filed with the United States Securities and Exchange Commission (the " SEC ") under the United States Securities Act of 1933, as amended and the U.S.Canada Multijurisdictional Disclosure System (the " Registration Statement "), and has become effective under the U.S.Canada Multijurisdictional Disclosure System.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

MAG Silver Announces Planned Retirement of CXO

MAG Silver Corp. (TSX NYSE American: MAG) ("MAG", or the " Company ") announces the planned retirement of Co-Founder and Chief Exploration Officer (" CXO "), Dr. Peter Megaw, effective May 21, 2024. Peter has been an integral part of MAG Silver's success, applying over 45 years of relevant experience to our silver and gold exploration efforts, with the past ten years dedicated to serving as MAG's CXO.

Peter's retirement marks the culmination of over 20 years of dedicated service to MAG. Under his leadership, Juanicipio, one of the world's leading silver deposits, was discovered, financed, developed and is now in operation. Beyond the discovery of Juanicipio, as Co-Founder, Peter played an integral role in the development of the Company including its IPO, seven years of service on the Board, its acquisition of strategic exploration properties in prolific jurisdictions and its growth into the substantial silver producer it is today. Peter will continue as a consultant to the Company following his retirement from executive duties at MAG.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

MAG Silver Announces Intention to Make Normal Course Issuer Bid for Common Shares

MAG Silver Corp. (TSX NYSE American: MAG) ("MAG", or the " Company ") today announced that the Toronto Stock Exchange (the " TSX ") has accepted the Company's Notice of Intention to Make a Normal Course Issuer Bid (" NCIB ").

Under the NCIB, the Company may purchase for cancellation up to an aggregate of 8,643,374 common shares in the capital of the Company (" Common Shares "), representing approximately 10% of the public float (as defined in the rules and policies of the TSX) of the Common Shares as of May 8, 2024. The Company's purchases in the United States will be subject to a limit of 5,148,977 Common Shares, being 5% of the public float of the Common Shares as of May 8, 2024.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Boab Metals Limited

Corporate Presentation December 2024

Boab Metals Limited (ASX: BML) (“Boab” or “Company”) is pleased to present its investor presentation.


Keep reading...Show less
Alex Wallis, vice president of exploration at Silver47 Exploration.

Silver47 Beefs Up Drilling Plans to Expand Resource at Red Mountain Polymetallic Project

Following release of the final results from Silver47 Exploration's (TSXV:AGA) 2024 exploration program, the company is beefing up plans for a more expansive and targeted drill campaign in the new year at its flagship Red Mountain project in Alaska. Alex Wallis, vice president of exploration, said the aim is to “increase both the grade and the tonnage."

“With the modern drilling and the recoveries we saw this year, we have a really good chance to increase just from infilling the historic zones to really bulk that resource out as well,” he said.

Approximately 20 percent of future drilling efforts will focus on fresh exploration targets like Galleon and Horseshoe, according to Wallis. The company is eyeing more than 15 exploration targets at Red Mountain that have never been drill tested with geochemical and geophysical targeting.

Keep reading...Show less
  Unico Silver Limited

Cerro Leon drill results

Further high-grade mineralisation identified at the Karina prospect

Unico Silver Limited (“USL” or the “Company”) is pleased to announce first assay results from ongoing drilling at the Cerro Leon project, located in the Santa Cruz province of Argentina.

Keep reading...Show less

First Majestic Announces Mailing of Materials for Special Meeting

First Majestic Silver Corp. (NYSE: AG) (TSX: AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce that it has commenced mailing of its meeting materials for the special meeting of the Company's shareholders (the "Special Meeting") that will be held on Tuesday, January 14, 2025 at 11:00 a.m. (Pacific Time) at the offices of Bennett Jones LLP, located at Suite 2500 - 666 Burrard Street, Vancouver, British Columbia V6C 2X8.

At the Special Meeting, pursuant to the requirements of the rules of the Toronto Stock Exchange and the New York Stock Exchange, First Majestic shareholders will be asked to approve an ordinary resolution (the "Share Issuance Resolution") approving the issuance of up to 190,000,000 common shares of First Majestic ("First Majestic Shares") to stockholders of Gatos Silver, Inc. ("Gatos") in connection with the previously announced acquisition by First Majestic of all of the shares of common stock of Gatos (the "Transaction"). First Majestic's Board of Directors unanimously recommends that the Company's shareholders vote FOR the Share Issuance Resolution.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Pan American Silver Provides Annual Exploration Update

Pan American Silver Corp. (NYSE: PAAS) (TSX: PAAS) ("Pan American" or the "Company") provides an annual exploration update and releases new exploration drill results for its Jacobina, El Peñon, La Colorada, Huaron, Minera Florida and Timmins mines, as well as its La Colorada Skarn project.

"The success of our exploration program highlights the potential for long-term organic growth at many of our assets," said Christopher Emerson, Vice President of Exploration and Geology at Pan American. "Based on the results we were achieving in exploration this year, we increased our drill budget to over 450,000 metres for 2024. This exploration update highlights these results, and showcases the ongoing discovery of new mineralized structures in and around our existing mining operations."

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
Boab Metals

Boab Metals Limited (ASX: BML) – Trading Halt

Boab Metals Limited (ASX:BML) (the “Company”) hereby requests a trading halt of its securities be granted by the ASX effective immediately, pending a release of an announcement regarding an Offtake and Project Finance Agreement. The trading halt will last until the earlier of commencement of trading on Wednesday, 11 December 2024 or the release to the market of an announcement as specified above. The Company is not aware of any reason why the trading halt should not be granted or of any other information necessary to inform the market about the trading halt. This request was authorised for release by the Board of the Company.

Keep reading...Show less

Latest Press Releases

Related News

×