
August 18, 2021
Galan Lithium Limited (ASX:GLN) (Galan or the Company) is pleased to announce that, following the recent receipt of the next round of drilling permits from the Secretaria de Estado de Minería - Gobierno de Catamarca (the authority that approves drilling permits in Catamarca, Argentina), Galan will commence its next drilling programme over the Hombre Muerto West (HMW) project located on the Hombre Muerto salar in Argentina.
Highlights
- Galan has received the next round of drilling permits for Hombre Muerto West
- Drilling campaign to assess new resources and maiden reserves at Hombre Muerto West
- Drilling will also test production well flow rates and lithium grade
- Earthworks has commenced and drilling equipment on site
Preparatory works to access sites for drilling have now commenced within the Pata Pila and Rana de Sal concessions. Drilling equipment has already mobilised to site. This next round of drilling aims to confirm and expand current resources and to test the dynamics of brine flow rates, and lithium grade necessary to estimate a maiden Reserves Estimate to be used as part of HMW's Definitive Feasibility Study (DFS).
Galan's Managing Director, Juan Pablo ("JP") Vargas de la Vega, said:
"We are pleased to be able to return to HMW, this time to drill for Reserves. With our new funding, Galan will also test new undrilled areas aiming to firm-up and increase resources. We want to prove that HMW could have a productive well field to support potential production as part of the DFS."
The HMW project currently houses a high-grade, low impurity lithium brine resource of ~2.3Mt LCE @ 946mg/l Li.
The Galan Board has authorised this release. For further information contact:
Juan Pablo ("JP") Vargas de la Vega Terry Gardiner
Managing Director Non-Executive Director
Email: jp@galanlithium.com.auEmail: TGardiner@galanlithium.com.au
Tel: +61 8 9322 6283 Tel: + 61 400900377
GLN:AU
Alert Options
No alert set
INN Article Notification
Alert Option
You will be notified when this event occurs. No additional settings needed.
The Conversation (0)
20 April 2025
Galan Lithium
Developing high-grade lithium brine projects in Argentina
Developing high-grade lithium brine projects in Argentina Keep Reading...
24 August 2025
Successful Due Diligence Ends - $20M Placement To Proceed
Galan Lithium (GLN:AU) has announced Successful Due Diligence Ends - $20m Placement To ProceedDownload the PDF here. Keep Reading...
01 August 2025
Final At-The-Market Raise for 2025
Galan Lithium (GLN:AU) has announced Final At-The-Market Raise for 2025Download the PDF here. Keep Reading...
30 July 2025
Quarterly Activities and Cash Flow Report
Galan Lithium (GLN:AU) has announced Quarterly Activities and Cash Flow ReportDownload the PDF here. Keep Reading...
25 July 2025
Incentive Regime for HMW Project in Argentina
Galan Lithium (GLN:AU) has announced Incentive Regime for HMW Project in ArgentinaDownload the PDF here. Keep Reading...
24 July 2025
Trading Halt
Galan Lithium (GLN:AU) has announced Trading HaltDownload the PDF here. Keep Reading...
19 November
POSCO Signs Lithium Supply Deal With CATL Through 2028
South Korea’s POSCO Group, trading under POSCO Holdings (NYSE:PKX,KRX:005490), has signed a long-term agreement to supply lithium to Contemporary Amperex Technology (SZSE:300750,HKEX:3750) (CATL), the world’s largest electric vehicle battery maker, covering 2026 to 2028 with deliveries already... Keep Reading...
09 November
Argentina Lithium and Energy: PFS at Rincon West Targeted in 2027
Argentina Lithium and Energy (TSXV:LIT,OTCQB:LILIF,FWB:OAY3) IR Manager Shawn Perger spoke to the Investing News Network at the New Orleans Investment Conference, highlighting the expected completion of a prefeasibility study (PFS) for Rincon West in Q2 2027 and a production pathway to follow.... Keep Reading...
29 October
Rio Tinto Opens Two Argentine Lithium Projects Worth US$1.4 Billion
Rio Tinto (ASX:RIO,NYSE:RIO,LSE:RIO) opened two lithium operations in Argentina's Catamarca province on Thursday (October 29), which is touted to add 25,000 metric tons of annual lithium carbonate equivalent (LCE) capacity once fully ramped up.To date, Rio Tinto has invested roughly US$1.4... Keep Reading...
22 October
Benchmark: New Lithium Mine Needed Every Two Months to Meet 2050 Demand
The lithium industry will need to bring the equivalent of a new mine into production roughly every two months for the next 24 years to keep up with demand, according to new data from Benchmark Mineral Intelligence.Benchmark forecasts global lithium demand will reach about 7 million metric tons... Keep Reading...
19 October
5 Best-performing ASX Lithium Stocks in 2026
After a sharp rally in the first half of the year, lithium prices retreated during the third quarter, surrendering a significant portion of the gains generated in May when carbonate values reached a multi-year high. Data from Benchmark Mineral Intelligence shows FOB Australia spodumene... Keep Reading...
14 October
Lithium Market Trends: Q3 2026 Review and Forecast
Lithium prices lost ground in Q3, giving back much of the momentum built during a sharp first-half rally.The decline came despite demand indicators that market watchers continue to describe as strong, with electric vehicles (EVs) and grid-scale energy storage both pulling on supply. Price action... Keep Reading...
Latest News
Interactive Chart
Latest Press Releases
Related News
TOP STOCKS
American Battery4.030.24
Aion Therapeutic0.10-0.01
Cybin Corp2.140.00






