Balkan Mining and Minerals

Exceptional Rock Samples Up To 6.8% Li2o Identified At The Gorge Lithium Project

Balkan Mining and Minerals Ltd (BMM or the Company) (ASX: BMM) is pleased to provide an update on its recent Due Diligence program, conducted by CSA Global, at the Gorge Lithium exploration project located in the Georgia Lake Area, Thunder Bay North Mining District of Ontario, Canada (the Gorge Lithium Project or Project).

HIGHLIGHTS

  • During the Due Diligence (“DD”), conducted by CSA Global, five rock samples were collected and sent to ActLabs in Toronto for analysis.
  • From these five samples, four samples included Li2O values above 3.78%, with the 2 highest results returned at 5.75% and 6.80%.
  • The tenements comprising the Project are part of the larger Georgia Lake pegmatite district which is known to host late-stage pegmatite mineralised deposit types that contain rare elements including lithium, beryllium, tantalum, niobium and tin, including Rock Tech Lithium Inc’s (TSX-V: RCK) Georgia Lake project.
  • The transaction was approved by shareholders at the Company’s GM on 23 September 2022, including the capital raising of $1.5 million.
During the Company’s due diligence, five grab samples were collected and sent to ActLabs in Toronto for analysis. BMM is pleased to update shareholders, that from these five samples, four samples included Li2O values above 3.78%, with the 2 highest results being returned at 5.75% and 6.80%. Full results are summarised in table 1.

The Thunder Bay region of Ontario has been the focus of lithium pegmatite exploration works with the delineation of hard rock lithium deposits including Rock Tech Lithium Inc’s Georgia Lake project in 2021, and Imagine Lithium Inc’s (TSX.V ILI) Jackpot Lithium project and works carried out by Ultra Lithium Inc (TSX.V-ULT) Georgia Lake and Forgan Lake Projects, to name a few.

Key Updates on the Due Diligence

CSA Global was engaged by BMM to execute a Due Diligence assignment of the Gorge Lithium Project located approximately 215 km northeast of Thunder Bay, Ontario, and approximately 60 km southwest of Geraldton, Ontario. The Project site is accessed via Trans Canada Hwy 11 with entry points along well-graded gravel logging roads starting 40 km north of Nipigon/Trans Canada Hwy 14/11 intersection (Gorge Creek Road) and Camp 51 Rd, approximately 33 km west of Geraldton.

Historical Data Review

The historical data review for the Project indicates that there is adequate historical information available to incorporate into a digital and georeferenced database for the purposes of planning initial exploration programs such as additional field mapping and prospecting, rock and chip sampling, and trenching and channel sampling of spodumene-bearing pegmatites in the project area.


Click here for the full ASX Release

This article includes content from Balkan Mining, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

BMM:AU
The Conversation (0)
  Loyal Lithium Limited

Strategic Consolidation of Hidden Lake and Board Changes

Loyal Lithium Limited (ASX:LLI) (Loyal Lithium, LLI, or the Company) is pleased to announce the execution of a definitive agreement for the consolidation of the Hidden Lake Lithium Project, with Patriot Battery Metals (ASX:PMT) becoming a substantial LLI shareholder. Mr. Blair Way, Non- Executive Director and former President & CEO of Patriot Battery Metals, will join the Loyal Lithium Board of Directors, bringing valuable regional and industry expertise to guide the company's growth initiatives. The consolidation of the Hidden Lake Lithium Project provides Loyal Lithium with greater flexibility and optionality to deploy innovative exploration and development solutions.

Keep reading...Show less
Drilling Commences at the Barra Lithium Project in Brazil

Drilling Commences at the Barra Lithium Project in Brazil

Summit Minerals Limited (ASX:SUM) (“Summit” or the “Company”) is pleased to announce that Summit’s maiden drilling program has commenced at the recently acquired 100% owned Barra Lithium Project (“Barra”).

The Barra Lithium Project consists of four recently acquired tenements that are located within close proximity to the existing operating Miranda Lithium mine that is within the Borborema Pegmatitic Province (“BPP”) in northeast Brazil.

Keep reading...Show less
Lithium Universe

Lithium Universe


Keep reading...Show less
CleanTech Lithium (AIM:CTL)

Issue of Equity and TVR


Keep reading...Show less

Latest Press Releases

Related News

×