Critical Resources

Exceptional Intercept with 18.45m @ 2.06% Li2O at the Mavis Lake Lithium Project

Critical Resources Limited (ASX:CRR) (“Critical Resources” or “the Company”) is pleased to announce assay results from the current diamond core drilling campaign at the Company’s 100% owned Mavis Lake Lithium Project. The assay results illustrate the continuity of high-grade lithium mineralisation within the Main Zone of Mavis Lake.

Highlights

  • Results confirm high-grade lithium mineralisation, near surface, with sections of exceptionally high-grade lithium mineralisation
  • Assays of Drill Hole MF22-121 confirms 20.8m @ 1.92% Li2O, from 45.25m including:
    • 18.45m @ 2.06% Li2O from 46.0m, including
      • 1.5m @ 3.49% Li2O from 53.6m, and
    • 5.3m @ 2.06% Li2O from 98m
  • Assays of Drill Hole MF22-123 confirms 6.2m @ 2.15% Li2O from 50.9m, including:
    • 0.55m @ 4.0% Li2O from 52.3m, and
    • 3.0m @ 2.92% Li2O from 52.85m
  • All results to be incorporated into the maiden Mineral Resource Estimate due Q1 2023
  • Following the outstanding results, a further 2,500m drilling extension has been approved, taking the planned program to 17,500m
A drillhole summary is presented in Table 1, with key assay data in Table 2. Pegmatite cross section can be seen in Figure 1. Full details can be seen in Appendix 1.

Critical Resources’ Managing Director Alex Cheeseman said:

Discovering further high-grade intercepts with sections of extremely high-grade lithium mineralisation is very pleasing. In addition, these intercepts are relatively close to surface, with the main zone remaining open at depth, which we are yet to test.

With the excellent results of the last few months, Mineral Resource Estimate works underway, and drilling continuing at Mavis Lake, we are extremely pleased with how the project is progressing as we move from exploration into development.


Click here for the full ASX Release

This article includes content from Critical Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

CRR:AU
The Conversation (0)
Drilling Commences at the Barra Lithium Project in Brazil

Drilling Commences at the Barra Lithium Project in Brazil

Summit Minerals Limited (ASX:SUM) (“Summit” or the “Company”) is pleased to announce that Summit’s maiden drilling program has commenced at the recently acquired 100% owned Barra Lithium Project (“Barra”).

The Barra Lithium Project consists of four recently acquired tenements that are located within close proximity to the existing operating Miranda Lithium mine that is within the Borborema Pegmatitic Province (“BPP”) in northeast Brazil.

Keep reading...Show less
Lithium Universe

Lithium Universe


Keep reading...Show less
CleanTech Lithium (AIM:CTL)

Issue of Equity and TVR


Keep reading...Show less
Lithium-ion batteries.

Rio Tinto Shares Initial Resources and Ore Reserves for Rincon Lithium Project

Rio Tinto ( ASX:RIO,NYSE:RIO,LSE:RIO) released an initial mineral resources and ore reserves report for its 100 percent owned Argentina-based Rincon project on Wednesday (December 4).

Mineral resources inclusive of ore reserves comprise 1.54 million tonnes of lithium carbonate equivalent in the measured category, with 7.75 million tonnes in the indicated category and 2.29 million tonnes in the inferred category.

Probable ore reserves are made up of 2.07 million tonnes of lithium carbonate equivalent.

Keep reading...Show less

Latest Press Releases

Related News

×