Titan Minerals

Copper-Molybdenum-Gold Porphyry Mineralisation Discovered At Copper Ridge

Titan Minerals Limited (Titan or the Company) (ASX:TTM) is pleased to provide results from the first two diamond drill holes from the Company’s maiden drilling campaign at the Copper Ridge Porphyry prospect at the Linderos Project in southern Ecuador.


Key Highlights include:

  • Wide intervals of mineralised porphyry intersected from shallow depths in diamond drilling at Copper Ridge, with significant results including:
    • 308m grading 0.4% Copper Eq1 from 54m downhole in CRDD22-003,
      • including a higher-grade intercept of 76m grading 0.5% Copper Eq from 132m downhole; and
    • 91m grading 0.4% Copper Eq from 484m downhole in CRDD22-003- mineralised to end of hole, and remains open
    • 52m grading 0.3% Copper Eq from 82m downhole in CRDD22-001
  • Key geological and geochemical datasets are being assembled to facilitate Phase 2 drill planning at Copper Ridge
Titan’s Executive Director and CEO Matthew Carr commented:

Weareverypleasedtohavemetwithsuch success on our maiden drilling campaign at Copper Ridge, with results now confirming the presence of wide intervals of mineralised porphyry, with significant copper, molybdenum, gold and silver returned from shallow depths and extending to the end of hole in CRDD22-003.”

Onceallassayresultshavebeenreceived,wewillbewellpositionedtotargetadditionalporphyry mineralisation,withfoundationgeochemicalandgeologicaldatasetsbeingestablishedtosupportfuture explorationprogramsatCopperRidge.Webelievethatthisisthebeginningofwhatcouldbeasignificant discovery.

2022wasamonumentalyearforourCompanyinEcuador.Wevehaddedicatedteamsworkingoneach project collecting important geological layers and building our understanding, which has resulted in the identification of key targets that will drive size, scale, and potential new discoveries at Linderos, Dynasty and Copper Duke in 2023.”

“The level of interest we’ve had from large corporates and strategic investors in our projects this year is somethingwehaventexperiencedtodate,withmultiplesitevisitshostedinrecentmonthsandadvanced discussionsheld.

Afterundertakingsitevisits,walkingthegroundandvisualisingoutcroppingporphyrymineralisationfor themselves,strategicinvestorsareclearly excitedaboutthepotentialopportunityofallthreeprojects, which puts Titan in an enviable position.”

“As a board we will review our position and make strategic decisions in the best interest of our shareholders in what we expect to be a very busy and exciting 2023.”

Linderos Project– Copper Ridge Porphyry Prospect Initial Drilling Results

The Company has completed a maiden campaign comprising eight diamond drill holes for a total of 3,700 metres at the Copper Ridge Porphyry prospect (Copper Ridge) on its Linderos Project in Southern Ecuador. Drilling was designed to target porphyry mineralisation highlighted by surface mapping and geochemistry, and limited historical drilling undertaken at the prospect.

Pleasingly, diamond drilling has been successful in intersecting wide intervals of disseminated and vein hosted porphyry style chalcopyrite-molybdenite-pyrite±pyrrhotite mineralisation from shallow depths.


Click here for the full ASX Release

This article includes content from Titan Minerals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

TTM:AU
The Conversation (0)
Heliostar Files Technical Reports on Mines and Development Project Recently Acquired in Mexico

Heliostar Files Technical Reports on Mines and Development Project Recently Acquired in Mexico

Company Overview on La Colorada:

  • La Colorada Operations show US$25.9M NPV5, 11.9% IRR, US$53.9M CAPEX and 287k total ounces produced at a US$2,000/oz gold price
  • New mineral reserve at Junkyard Stockpile supports restart of mining at La Colorada that has commenced this month
  • El Crestón expansion at La Colorada is expected to produce over 50,000 ounces of gold per year
  • Current drill program (five drill rigs) is targeting lower CAPEX and increased production for updated technical report planned for mid-2025
Au Price
(US$/oz Au)
Net Cash Flow
(US$M)
After-Tax NPV
@ 5.0% Discount Rate
(US$M)
IRR
(%)
Payback Period
(years)
Payback Multiple
2,000 154.9225.9311.92.21.4
2,600 2158.32110.0334.71.42.3

 

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

B2Gold Announces Amended Shareholder Return Strategy, including New Dividend Framework and Intention to Implement a Normal Course Issuer Bid

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) ("B2Gold" or the "Company") announces amendments to its shareholder returns strategy to increase financial flexibility as it completes its current phase of organic growth, including the anticipated commencement of initial production from Fekola Regional in Mali, the completion of construction of the Goose Mine in Nunavut, Canada, the development of the Antelope deposit at the Otjikoto Mine in Namibia, and de-risking activities at the Gramalote Project in Colombia. All dollar figures are in United States dollars unless otherwise indicated.

New Dividend Framework

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

B2Gold Announces Amended Shareholder Return Strategy, including New Dividend Framework and Intention to Implement a Normal Course Issuer Bid

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) ("B2Gold" or the "Company") announces amendments to its shareholder returns strategy to increase financial flexibility as it completes its current phase of organic growth, including the anticipated commencement of initial production from Fekola Regional in Mali, the completion of construction of the Goose Mine in Nunavut, Canada, the development of the Antelope deposit at the Otjikoto Mine in Namibia, and de-risking activities at the Gramalote Project in Colombia. All dollar figures are in United States dollars unless otherwise indicated.

New Dividend Framework

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

B2Gold Announces Total Consolidated Gold Production for 2024 of 804,778 oz, Within the Revised 2024 Guidance Range; Total Gold Production for 2025 Anticipated to be Between 970,000 and 1,075,000 oz; Goose Project Remains On Track for First Gold in Q2 2025 and Total Capital Estimate Remains at C$1,540 Million

B2Gold Corp. (TSX: BTO, NYSE AMERICAN: BTG, NSX: B2G) ("B2Gold" or the "Company") is pleased to announce its gold production and revenue results for the fourth quarter and full year 2024, as well as its 2025 total gold production guidance and 2025 cost guidance for its current operating mines. All dollar figures are in United States dollars unless otherwise indicated.

Q4 and Full Year 2024 Highlights

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Kinross to announce 2024 Q4/full-year results and 2025 guidance on February 12, 2025

Kinross Gold Corporation (TSX: K; NYSE: KGC) (the "Company") will release its 2024 fourth-quarter and full-year financial statements and operating results on Wednesday, February 12, 2025, after market close. The Company will also provide its full-year 2025 guidance, mineral reserve, and mineral resource statement as of December 31, 2024, and an exploration and project update. Kinross will hold a conference call and audio webcast on Thursday, February 13, 2025, at 8 a.m. ET to present the results, followed by a question-and-answer session.

The call-in numbers for the conference call on Thursday, February 13, 2025, at 8 a.m. ET are as follows:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Kinross to announce 2024 Q4/full-year results and 2025 guidance on February 12, 2025

Kinross Gold Corporation (TSX: K; NYSE: KGC) (the "Company") will release its 2024 fourth-quarter and full-year financial statements and operating results on Wednesday, February 12, 2025, after market close. The Company will also provide its full-year 2025 guidance, mineral reserve, and mineral resource statement as of December 31, 2024, and an exploration and project update. Kinross will hold a conference call and audio webcast on Thursday, February 13, 2025, at 8 a.m. ET to present the results, followed by a question-and-answer session.

The call-in numbers for the conference call on Thursday, February 13, 2025, at 8 a.m. ET are as follows:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×