Albemarle Corporation Announces New U.S. Lithium Mega-Flex Processing Facility in South Carolina

Planned investment of at least $1.3 billion to help meet surging demand for electric vehicles and lithium-ion batteries

Albemarle Corporation (NYSE: ALB), a global leader in providing essential elements for mobility, energy, connectivity and health, today announced plans to locate its previously announced lithium hydroxide Mega-Flex facility in Chester County, South Carolina . Plans for the facility include an initial investment of at least $1.3 billion to help meet the surging demand for domestic and international electric vehicles and lithium-ion batteries.


The term Mega-Flex refers to the facility's ability to process diverse lithium feedstock, including lithium from recycled batteries. Albemarle expects the facility to annually produce approximately 50,000 metric tons of battery-grade lithium hydroxide from multiple sources, with the potential to expand up to 100,000 metric tons. Production at the facility would support the manufacturing of an estimated 2.4 million electric vehicles annually. The site also supports the Inflation Reduction Act, a federal law enacted in 2022 to incentivize the localization of critical minerals in North America.

"This facility will help increase the production of U.S.-based lithium resources to fuel the clean energy revolution while bringing us closer to our customers as the supply chain is built out in North America ," said Albemarle CEO Kent Masters . "This investment supports our long-term commitment to providing innovative products and solutions that enable a more resilient world. We look forward to partnering with the state of South Carolina on this important project."

Pending permitting approvals, the facility will be located within a nearly 800-acre parcel. Albemarle estimates the facility will create more than 300 new jobs with an average annual wage of approximately $93,000 . In addition, the project would create more than 1,500 construction jobs.

To support the development of the new site, Albemarle is committed to advancing partnerships with the state, local communities, and educational institutions to build a talent pipeline and create advanced technology jobs to support the facility and the community. Additionally, the site will likely create new opportunities for suppliers and other businesses to locate nearby.

"Today's announcement is positively electric news for the Palmetto State," said South Carolina Governor Henry McMaster . " Albemarle's new facility will be transformative for our state, creating thousands of good-paying jobs in South Carolina , and help us further our goals of becoming an electric vehicle hub in the United States by being home to companies like Albemarle who are producing strategically critical material vital to the lithium-ion batteries that power everything from electric vehicles to medical devices. Advanced manufacturing has long been a part of our economic DNA in South Carolina , and we are proud of the progress we have made over the past three years in attracting businesses across the electric vehicle supply chain that represent the future of the United States economy and the environmental sustainability of the world."

Construction is expected to begin late in 2024.

About Albemarle

Albemarle Corporation (NYSE: ALB) is a global leader in transforming essential resources such as lithium and bromine into critical ingredients for mobility, energy, connectivity, and health. Together with our world-class resources, technical and process knowledge, and safety and sustainability performance, we partner with our customers to pioneer new ways to move, power, connect, and protect. We are committed to building a more resilient world where people and planet thrive. Learn more about Albemarle at www.albemarle.com and at @albemarlecorp on LinkedIn, Twitter, and Facebook.

Albemarle regularly posts information to its website, including notification of events, news, financial performance, investor presentations and webcasts, non-GAAP reconciliations, SEC filings and other information regarding the company, its businesses and the markets it serves.

Forward Looking Statements

This press release contains statements concerning our expectations, anticipations, intentions, beliefs, or strategies regarding the future, which constitute "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. These forward-looking statements, which are based on assumptions that we have made as of the date hereof and are subject to known and unknown risks and uncertainties that could cause actual results, conditions and events to differ materially from those anticipated, often contain words such as "anticipate," "believe," "could," "estimate," "expect," "intend," "may," "should," "would," "will" and variations of such words and similar expressions. Forward-looking statements may include, without limitation, statements regarding expected production capacity of the Mega-Flex plant, the number of jobs and economic opportunities it may create, the timing of its construction and becoming operational, and all other information relating to matters that are not historical facts. Factors that could cause actual results to differ materially from the outlook expressed or implied in any forward-looking statement include, without limitation: changes in economic and business conditions; adverse changes in liquidity or financial or operating performance; changes in the demand for our products or the end-user markets in which our products are sold; fluctuations in lithium market pricing; changes in laws and government regulation; and the other factors detailed in the reports we file with the SEC, including those described under "Risk Factors" in our Annual Report on Form 10-K and subsequent Quarterly Reports on Form 10-Q, which are available on the investor section of our website ( investors.albemarle.com ). These forward-looking statements speak only as of the date of this press release. We assume no obligation to provide any revisions to any forward-looking statements should circumstances change, except as otherwise required by securities and other applicable laws.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/albemarle-corporation-announces-new-us-lithium-mega-flex-processing-facility-in-south-carolina-301778807.html

SOURCE Albemarle Corporation

News Provided by PR Newswire via QuoteMedia

ALB
CoTec Holdings

CoTec Holdings Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
CoTec Holdings (TSXV:CTH)

CoTec Holdings

Investor Insight

CoTec Holdings combines proprietary processing technologies with undervalued and legacy resource assets to create high-margin opportunities across rare earths, iron and copper sectors. With three execution-stage projects and a significant discount to attributable NAV, CoTec provides differentiated exposure to strategic minerals tied to electrification, AI infrastructure and supply-chain security.

Overview

CoTec Holdings (TSXV:CTH, OTCQX:CTHCF) is redefining the future of rare earth magnet recycling and strategic material extraction. Its portfolio spans rare earth magnet recycling, iron tailings reprocessing and emerging copper extraction technologies, all directed at fast-tracking revenue generation and reducing energy and capital intensity compared to conventional mining.CoTec Holdings mining model

Key Technologies

The company’s modular, capital-efficient model — including joint ventures and strategic subsidiaries — positions it for scalable growth and streamlined execution. With significant advancement in project execution, two completed feasibility studies, a third underway and an independent pre-feasibility study for HyProMag USA’s U.S. expansion completed in October 2026, CoTec is moving toward transforming its technology suite into commercial operations.

Why Invest in CoTec?

Why invest in CoTec Holdings

  • Differentiated Growth Model: Capital-light strategy deploying modular technologies at brownfield assets to accelerate timelines and reduce capital intensity.
  • Strategic Commodity Exposure: Exposure to rare earths, iron and copper — key materials for electrification, AI infrastructure, robotics and other critical supply chains.
  • Execution-Stage Portfolio: Three projects advancing through feasibility, engineering and financing stages.
  • Aligned Leadership: Strong insider ownership and experienced management with deep mining and capital markets expertise.
  • Lower-Carbon Production: Technologies designed to reduce energy use, water consumption and emissions relative to conventional mining.

Company Highlights

  • Technology-Driven Value Creation: Deploys proprietary, low-carbon processing technologies to extract value from waste, tailings and marginal deposits that traditional mining overlooks.
  • Execution-Stage Projects: Advancing three core assets — HyProMag USA magnet recycling, the Lac Jeannine iron tailings project, and MagIron iron ore feedstock, concentrator and pelletizer — with clear development pathways.
  • Expanding Rare Earth Footprint: HyProMag USA advances its scalable US hub-and-spoke rare earth magnet recycling roll-out using the Hydrogen Processing of Magnetic Scrap (“HPMS”) technology, with Inserma HDD pre-processing machines installed in South Carolina and Nevada and power secured for the Texas Hub. An independent Pre-Feasibility Study (October 2026) outlines a four-plant U.S. platform that would roughly quadruple planned magnet capacity to approximately 4,192 metric tons per year by 2034.
  • Strategic Copper Focus: Established a new subsidiary, CoTec Copper, to accelerate targeted investment in copper tailings and copper sulfide deposits globally, leveraging CoTec’s core technologies to unlock value.
  • Iron Ore & Green Steel: Advancing iron tailings reprocessing at Lac Jeannine and supporting the restart of MagIron in Minnesota and Indiana, which is now advancing merchant pig iron as its primary development strategy while retaining DR-grade pellet optionality, to supply high-grade feedstock for low-carbon steel production.
  • Strong Insider Support: Insiders own approximately 58 percent of shares, reinforcing alignment with long-term value creation.
  • Experienced Leadership: Board and executives bring deep mining, technology and capital markets experience from leading global organizations.

Key Technologies and Assets

HyProMag USA Projec

HyProMag USA project

HyProMag USA is CoTec’s flagship rare earth recycling platform and a cornerstone of its strategy to localize critical mineral supply chains. The project deploys Hydrogen Processing of Magnetic Scrap technology to recover neodymium iron boron magnets from end-of-life electronics and industrial equipment through a simplified hydrogen-based process that bypasses traditional chemical separation and smelting. This short-loop approach dramatically reduces energy use, water consumption and emissions while lowering operating complexity and cost.

The company’s phased development plan is targeting commissioning of its initial neodymium-iron-boron magnet cutting and finishing operations in Texas in H1 2027, with Phase 1 of the integrated Northlake, Texas recycling and magnet manufacturing facility targeted for completion in mid-2028. Up to 20 tonnes of magnet blocks supplied by HyProMag Group in the United Kingdom and Germany will be shaped and finished at HyProMag USA's operations for U.S. customers. Power capacity for the Texas Hub has been secured with Oncor, expected to be supplied predominantly from renewable energy, and contractor selection and permitting are underway. In October 2026, an independent Pre-Feasibility Study by PegasusTSI and BBA USA outlined an expansion to three additional plants and a Central Texas Hub, taking the platform to approximately 6,000 metric tons per year of salable material by 2034.

Watch an overview of HyProMag USA here: https://www.youtube.com/watch?v=v0d7rKdwu_s

Highlights

  • CoTec holds a 60.3 percent economic interest.
  • Northlake, Texas facility post-tax NPV of approximately US$723 million at forecast prices (October 2026 update to the 2024 Feasibility Study, reflecting detailed engineering and finalized equipment orders).
  • Northlake capital cost estimated at approximately US$167 million (AACE Class 2), with Phase 1 targeting about 1,034 metric tons per year of payable production and Phase 2 about 1,526 metric tons per year.
  • Initial magnet cutting and finishing operations, and first U.S. magnet sales, targeted for H1 2027.
  • Independent Pre-Feasibility Study (October 2026) indicates an incremental post-tax NPV of US$1.85 billion to US$2.06 billion and post-tax IRR of 31 to 36 percent for three additional plants and a Central Texas Hub, at a capital cost of approximately US$623 million to US$656 million; combined with Northlake, platform post-tax NPV of US$2.6 billion to US$2.8 billion and NdFeB magnet capacity of approximately 4,192 metric tons per year by 2034.
  • Inserma pre-processing machines have been installed at South Carolina and Nevada facilities to support feedstock preparation and scale-up of the hub-and-spoke rollout.
  • Integrated Texas Hub’s Hydrogen Processing of Magnet Scrap section targeted for mid-2028.
  • HyProMag GmbH, the HyProMag Group’s German operation in Pforzheim, was designated a Strategic Project under the EU Critical Raw Materials Act in October 2026, underscoring the strategic relevance of the HPMS technology.

Lac Jeannine Iron Project

CoTec Holdings Lac Jeannine Iron project

The Lac Jeannine project is an advanced tailings reprocessing initiative designed to transform legacy mining waste into high-purity iron concentrate for steelmaking. By leveraging existing infrastructure and modern processing technologies, the project aims to unlock value from previously discarded material while simultaneously advancing environmental reclamation. This approach aligns economic return with environmental remediation and supports domestic iron supply.

Metallurgical test work has demonstrated the project's ability to produce a high-purity iron concentrate grading in excess of 67 percent FeT, the threshold for high-purity iron under the Québec and Canadian critical and strategic minerals frameworks. CEO Julian Treger said that this validates the resource’s quality and the effectiveness of the company’s processing strategy. “(It also supports) our vision of transforming a historic environmental liability into a strategic asset capable of supporting the global transition to lower-carbon steel production."

Highlights

  • Indicated resource of about 31 Mt at 6.8 percent iron and inferred resource of about 71 Mt at 6.8 percent iron (2026 MRE).
  • After-tax NPV7 of US$91.9 million and IRR of 29.6 percent (2026 PEA).
  • Initial capex estimated at US$69.4 million.
  • 15-year mine life
  • A 41 percent increase in the resource according to the 2026 PEA, with a global increase in total iron grade from 6.7 to 6.8 percent.
  • Feasibility Study underway with BBA Consulting, with permitting and offtake discussions in progress.

MagIron represents a restart-ready brownfield iron ore deposit, concentrator and pelletizer project in Minnesota and Indiana, that benefits from an estimated $660m in historical capital investment, targeting the production of direct-reduction grade pellets for low-carbon steelmaking. The project benefits from extensive existing infrastructure and prior capital investment, allowing rapid recommissioning compared with greenfield developments. Its strategic positioning targets rising demand for domestically sourced feedstock for electric arc furnaces and decarbonized steel production.

Senior leadership changes have been made to support the ongoing development of MagIron, especially regarding restarting its iron ore concentrator in Minnesota and pellet plant in Indiana. In August 2026, a concept study by Primetals Technologies confirmed three technically credible pathways to produce approximately 2 million tonnes per year of granulated pig iron at MagIron’s facilities. MagIron is now advancing pig iron as its primary development strategy while retaining DR-grade pellet optionality, and independent test work at the Natural Resources Research Institute confirmed that MagIron concentrate can produce DR-grade pellets.

Highlights

  • CoTec owns approximately 17 percent.
  • Definitive Feasibility Study shows after-tax NPV of about US$1.60 billion and IRR about 27.6 percent.
  • Average annual production is about 2.6 Mt DR-grade pellets.
  • Life of mine is about 32 years.
  • Payback period is about 3 years and 7 months.
  • Mine and concentrator permits in place; pellet plant permitting in progress
  • Raised additional capital at a pre-money valuation of US$550 million from existing shareholders

CoTec Copper

CoTec Copper is a dedicated subsidiary created to accelerate the company’s exposure to copper, one of the most strategically important electrification metals. The unit focuses on acquiring and advancing copper tailings projects and sulphide deposits, particularly in historically productive mining jurisdictions where modern processing technologies can unlock additional value from previously uneconomic material. It leverages CoTec’s existing technology portfolio to enhance recoveries and lower operating costs.

Highlights

  • Targets assets in Tier 1 mining regions across the United States, Australia, Latin America and Africa.
  • Focuses on both tailings reprocessing and sulphide copper deposits.
  • Designed as a scalable growth platform to expand CoTec’s copper exposure.
  • Definitive joint venture shareholder agreement with Copper Intelligence (September 2026) to pursue historical copper tailings opportunities in the Democratic Republic of Congo, with funding to be sought from the U.S. International Development Finance Corporation and other sources once sufficient scale is achieved.
  • Non-binding framework agreement with Battery Mineral Resources (October 2026) toward a Strategic Economic Joint Venture at the Punitaqui copper mining district in Chile.

Binding Solutions

Binding Solutions provides a cold agglomeration technology that converts ultrafine mineral waste into ISO-compliant pellets or briquettes suitable for industrial use, particularly in green steel production. Unlike traditional pelletizing processes that rely on high-temperature furnaces, this approach operates at low temperatures, drastically reducing energy consumption and emissions while enabling monetization of low-grade or waste materials.

Highlights

  • Uses about 95 percent less energy than conventional pelletizing.
  • Generates about 98 percent fewer emissions.
  • Applicable to iron and other mineral fines.

Ceibo

Ceibo’s oxidative heap-leaching technology is designed to improve copper recovery from sulphide ores such as chalcopyrite, which account for the majority of global copper reserves but are traditionally difficult and costly to process. The process enhances recovery rates while lowering environmental impact and capital intensity, potentially transforming the economics of many existing copper assets.

Highlights

  • Potential recovery improvement from about 30 percent to approximately 75 percent.
  • Targets refractory sulphide deposits often considered uneconomic.
  • CoTec holds a minority equity interest and a seat on the technical advisory board.
  • Completed Series B financing of over US$30 million led by Energy Impact Partners to fund the scaling of the technology.
  • Investor syndicate includes BHP Ventures. Ceibo has partnered with Glencore’s Lomas Bayas operation in Chile (2024) and produced first copper cathodes at a demonstration plant with Compañía Minera San Gerónimo (2025).

WaveCracker

WaveCracker is a microwave-assisted mineral processing technology being advanced in collaboration with McGill University. The system uses targeted microwave energy to weaken mineral structures before conventional processing, improving metal liberation, reducing reagent consumption and lowering overall processing costs.

Highlights

  • Focused initially on copper sulphide applications.
  • Designed to accelerate leaching and recovery kinetics.
  • Builds on more than 30 years of microwave mineral processing research.

Salter Cyclones

Salter Cyclones technology uses multi-gravity separators to recover ultra-fine minerals from tailings streams that traditional processing methods cannot efficiently capture. By enabling recovery of metals from waste material, the system creates new revenue streams while reducing environmental liabilities associated with tailings storage.

Highlights

  • Applicable to iron, manganese and other fine mineral commodities.
  • Exclusive global rights for iron applications and regional exclusivity for manganese during the initial agreement period.
  • Converts waste into high-grade concentrates suitable for market.
  • CoTec-owned commercial-scale SCMG2 unit under assembly in the UK, with factory acceptance testing from Q3 2026, for deployment at Corem in Québec as a commercial testing and demonstration platform supporting Lac Jeannine and third-party iron ore opportunities.

Management Team

Julian Treger - Chief Executive Officer and Director

Julian Treger previously served as the CEO of Anglo Pacific Group before establishing Audley Capital Partners. At Audley, Treger directed the team through acquisitions totaling $570 million and achieved a realized Internal Rate of Return (IRR) of 38 percent. Treger continues to serve as the chairman of Audley Capital and holds both a BA and an MBA from Harvard.

Abraham Jonker - Chief Financial Officer

Abraham Jonker has 30 years of experience in mining finance. He previously served as the Lead Independent Director at Mandalay Resources and has been instrumental in leading over $750 million in equity and debt raises. Jonker is a Chartered Accountant in the UK, Canada, and South Africa and holds a Master's in Tax from Rand Afrikaans University.

John Singleton - Chief Operating Officer

John Singleton possesses over 25 years of experience in mining. His career began at De Beers, and he has since held senior leadership roles at Centamin and Rio Tinto. Singleton is a Fellow of the Royal Geological Society and holds degrees from Imperial College London and the University of Bristol.

John McGagh - Technology Consultant

John McGagh has more than 35 years of experience in digital transformation across various industries. He served as the head of innovation at Rio Tinto and is currently the chief digital officer at Snowy Hydro. McGagh is an adjunct professor at the University of Queensland and a Fellow of the Australian Academy of Technology Science and Engineering.

Eugene Hercun - VP Finance & Investor Relations

Eugene Hercun is a CPA, CA, with 15 years of varied experience in mining finance. He has led metal sales negotiations for more than $200 million annually and holds Level 1 of the CFA designation.

Hugh Thatcher - VP North America

Hugh Thatcher has 25 years of experience as in-house counsel in the mining and industrial sectors, including as Chief Counsel - US at Rio Tinto from 2020 to 2023. He holds a BA from Whitman College and a JD from Vanderbilt University.

Ian French - VP Projects

Ian French has more than 20 years of experience in project delivery and risk advisory across diamonds, gems and precious metals, including as Global Head of Diamond Risk & Security at Rio Tinto, and has led major infrastructure programs for mining companies and governments.

Board of Directors

Lucio Genovese, Independent Chairman

Lucio Genovese currently serves as the CEO of Nage Capital and as the chairman of Ferrexpo plc. He previously held senior roles at Glencore, including CEO of the CIS region. Genovese is a Chartered Accountant with degrees in Commerce and Accounting from the University of Witwatersrand.

Tom Albanese, Non-executive Director

Tom Albanese is the former CEO of Rio Tinto and Vedanta Resources. He was appointed Chair of Franco-Nevada Corporation in May 2026, having served as a director since 2013, and previously served as lead independent director of Nevada Copper. Albanese holds Master's and Bachelor's degrees from the University of Alaska Fairbanks.

Robert (Bob) Harward - Non-Executive Director

Robert Harward is a retired US Navy Vice Admiral (SEAL) and former deputy commander of US Central Command. He served on the US National Security Council and held senior strategy roles at Lockheed Martin and Shield AI.

Erez Ichilov - Non-executive Director

Erez Ichilov previously served as managing director at Traxys Projects, where he led investments in companies such as Nouveau Monde Graphite, Talon Metals, and Li-Cycle. Ichilov holds LLB and MBA degrees.

Sharon Fay - Non-executive Director

Sharon Fay previously served as head of equities and head of responsibility at AllianceBernstein. She built the firm's Corporate Responsibility and Responsible Investment teams. Fay is a Chartered Financial Analyst with a BA from Brown and an MBA from Harvard.

Mining in the Carolinas - Betting on History for a Second Wave of Discovery

Mining in the Carolinas - Betting on History for a Second Wave of Discovery

Investorideas.com, a leader in mining investing news and home of the Exploring Mining Podcast issues a snapshot of mining stocks betting on the Carolina's new wave of exploration and discovery, featuring Metalsource Mining Inc. (CSE: MSM,OTC:MSMMF) (OTCQB: MSMMF) (FSE: E9Z).Mining in the... Keep Reading...
Quimbaya Gold Announces that Dr. Stewart Redwood Provides Independent Confirmation of Porphyry Copper System at Tahami Center

Quimbaya Gold Announces that Dr. Stewart Redwood Provides Independent Confirmation of Porphyry Copper System at Tahami Center

Site visit by 40-year porphyry specialist validates 2.0 x 1.4 km Cu-Au-Mo system with complete alteration zonation and geological setting analogous to Peru's major copper depositsQuimbaya Gold Inc. (CSE: QIM,OTC:QIMGF) (OTCQX: QIMGF) (FSE: K05) ("Quimbaya" or the "Company") announces that Dr.... Keep Reading...
Grid Battery Metals Update - Fall 2024 Drilling Results on its Clayton Valley Lithium Project

Grid Battery Metals Update - Fall 2024 Drilling Results on its Clayton Valley Lithium Project

(TheNewswire) Coquitlam, BC TheNewswire - January 21, 2025 - Grid Battery Metals Inc. (the "Company" or "Grid") ( TSXV: CELL, OTCQB: EVKRF FRA: W47 ) is pleased to announce the results of its fall 2024 reverse circulation drilling program on the Company's claim block at Silver Peak, Clayton... Keep Reading...
Grid Battery Metals Drilling Update on its Clayton Valley Lithium Project

Grid Battery Metals Drilling Update on its Clayton Valley Lithium Project

(TheNewswire) Coquitlam, BC September 26, 2024 TheNewswire Grid Battery Metals Inc. (the "Company" or "Grid") ( TSXV: CELL, OTCQB: EVKRF FRA: W47 ) is pleased to announce that a reverse circulation drilling program is well under way on the Company's claim block at Silver Peak, Clayton Valley,... Keep Reading...
Grid Battery Metals Begins Drilling the Clayton Valley Lithium Project

Grid Battery Metals Begins Drilling the Clayton Valley Lithium Project

(TheNewswire) Coquitlam, BC TheNewswire - September 12, 2024 - Grid Battery Metals Inc. (the "Company" or "Grid") ( TSXV: CELL, OTCQB: EVKRF FRA: NMK2 ) is pleased to announce that a reverse circulation drilling program is commencing on the Company's claim block at Silver Peak, Clayton Valley,... Keep Reading...
Argentina Lithium & Energy IR Manager Shawn Perger.

Argentina Lithium and Energy: PFS at Rincon West Targeted in 2027

Argentina Lithium and Energy (TSXV:LIT,OTCQB:LILIF,FWB:OAY3) IR Manager Shawn Perger spoke to the Investing News Network at the New Orleans Investment Conference, highlighting the expected completion of a prefeasibility study (PFS) for Rincon West in Q2 2027 and a production pathway to follow.... Keep Reading...
Rio Tinto website.

Rio Tinto Opens Two Argentine Lithium Projects Worth US$1.4 Billion

Rio Tinto (ASX:RIO,NYSE:RIO,LSE:RIO) opened two lithium operations in Argentina's Catamarca province on Thursday (October 29), which is touted to add 25,000 metric tons of annual lithium carbonate equivalent (LCE) capacity once fully ramped up.To date, Rio Tinto has invested roughly US$1.4... Keep Reading...
Silver batteries surround a rising green graph on a lithium-themed backdrop with the text: Lithium, Li.

Benchmark: New Lithium Mine Needed Every Two Months to Meet 2050 Demand

The lithium industry will need to bring the equivalent of a new mine into production roughly every two months for the next 24 years to keep up with demand, according to new data from Benchmark Mineral Intelligence.Benchmark forecasts global lithium demand will reach about 7 million metric tons... Keep Reading...
Blue battery with Australian flag design on a wooden surface.

5 Best-performing ASX Lithium Stocks in 2026

After a sharp rally in the first half of the year, lithium prices retreated during the third quarter, surrendering a significant portion of the gains generated in May when carbonate values reached a multi-year high. Data from Benchmark Mineral Intelligence shows FOB Australia spodumene... Keep Reading...
Glowing battery symbol with lightning bolt on purple circuit board.

Lithium Market Trends: Q3 2026 Review and Forecast

Lithium prices lost ground in Q3, giving back much of the momentum built during a sharp first-half rally.The decline came despite demand indicators that market watchers continue to describe as strong, with electric vehicles (EVs) and grid-scale energy storage both pulling on supply. Price action... Keep Reading...
An electric vehicle beside a charging station.

EU Hybrid EV Cap Sinks Chinese Lithium to 10 Month Low

The EU announced it will cap imports of Chinese hybrid electric vehicles at 350,000 units annually starting this December, sending Chinese lithium futures plunging to a 10 month low.European Trade Commissioner Maros Sefcovic brokered the quota system during recent negotiations held in Beijing.... Keep Reading...
CoTec Holdings

CoTec Holdings Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Interactive Chart

Latest Press Releases

Related News