Balkan Mining and Minerals

Work Program Commences At Gorge Lithium Project

Balkan Mining and Minerals Ltd (BMM or the Company) (ASX: BMM) is pleased to announce that its work program at the Gorge Lithium exploration project located in the Georgia Lake Area, Thunder Bay North Mining District of Ontario, Canada (the “Gorge Lithium Project” or “Project”) has commenced.

HIGHLIGHTS

  • Phase 1 of the field program has begun, to include sampling and surface trenching along with geological mapping.
  • Dialogue and consultation has begun with local First Nation communities.
  • The program is designed to identify the extent of spodumene mineralisation and generate short term drill targets.
  • The previously announced $1.5 million capital raise has been closed.
As previously announced, during the Company’s due diligence period five samples were collected and sent to ActLabs in Toronto for analysis. BMM announced that that from these five samples, four samples included Li2O values above 3.78%, with the 2 highest results being returned at 5.75% and 6.80%. Full results are summarised in the Company’s announcement dated 28 September 2022.

Work Program

BMM has engaged a highly capable team to conduct the first phase of its exploration program at the Gorge Project, who has a demonstrable record in the district, as well as strong relations with the First Nations communities in the area.

The Company has commenced mapping and sampling of the entire project area. This is planned to be followed by trenching and soil analysis. Subject to favourable results, BMM intends on drilling throughout the fall and winter as the appropriate drilling targets are identified.

Managing Director Ross Cotton commented:

“I would like to thank our dedicated team on the ground who have not wasted a moment to get our work project underway. I also again thank our team in both Australia and Serbia who have worked tirelessly to move BMM forward. We are extremely excited about our strategic move into a Tier 1 mining Jurisdiction in Ontario, Canada. The initial results were a great start for the Company, we look to build on these results as we embark on our planned mapping, sampling and trenching programs.”


Click here for the full ASX Release

This article includes content from Balkan Mining, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

BMM:AU
The Conversation (0)
Drilling Commences at the Barra Lithium Project in Brazil

Drilling Commences at the Barra Lithium Project in Brazil

Summit Minerals Limited (ASX:SUM) (“Summit” or the “Company”) is pleased to announce that Summit’s maiden drilling program has commenced at the recently acquired 100% owned Barra Lithium Project (“Barra”).

The Barra Lithium Project consists of four recently acquired tenements that are located within close proximity to the existing operating Miranda Lithium mine that is within the Borborema Pegmatitic Province (“BPP”) in northeast Brazil.

Keep reading...Show less
Lithium Universe

Lithium Universe


Keep reading...Show less
CleanTech Lithium (AIM:CTL)

Issue of Equity and TVR


Keep reading...Show less
Lithium-ion batteries.

Rio Tinto Shares Initial Resources and Ore Reserves for Rincon Lithium Project

Rio Tinto ( ASX:RIO,NYSE:RIO,LSE:RIO) released an initial mineral resources and ore reserves report for its 100 percent owned Argentina-based Rincon project on Wednesday (December 4).

Mineral resources inclusive of ore reserves comprise 1.54 million tonnes of lithium carbonate equivalent in the measured category, with 7.75 million tonnes in the indicated category and 2.29 million tonnes in the inferred category.

Probable ore reserves are made up of 2.07 million tonnes of lithium carbonate equivalent.

Keep reading...Show less

Latest Press Releases

Related News

×