Critical Resources

Oman Block 4 and Block 5 Exploration Licenses Update

Critical Resources Limited (ASX:CRR) (“Critical Resources” or the “Company”), advises that further to the announcements dated 9 April 2021, 2 August 2021, 10 August 2021 and 26 August 2021 the Company has reached a mutually agreeable outcome with the Ministry of Energy and Minerals, Sultanate of Oman (Minerals Department) regarding license fees for the ongoing exploration of Block 4 and Block 5, Sohar Copper Project in Oman.


The Block 5 resource, for which Critical Resources holds a 65% interest is a high grade, near surface, copper plus silver and gold resource.

About Sohar Copper Project

The Company’s assets are located near Sohar in the Sultanate of Oman.

  • The Project covers 1,006 km² of the copper-rich Ophiolite belt, proven to host clusters of relatively high grade VHMS copper deposits. Ores within these deposits are metallurgically simple and contain gold and silver credits.
  • The Company holds a 51% interest in Block 4 (granted Exploration Licence), a 65% interest in Block 5 (granted Exploration Licence and 2 Mining Lease applications) and a 70% interest in two Exploration Licence applications near Block 10 to the West of Blocks 4 and 5.
  • Measured, Indicated and Inferred Mineral Resources (2012 JORC) of 0.82Mt at 3.4% Cu (including a high-grade zone of approximately 0.5Mt at 4.5% Cu)(gross deposit) is contained in two deposits within Block 5. Contained metal is reported at 28,000 tonnes of Copper, 5,900 ounces of Gold and 220,000 ounces of Silver. Further details can be seen in the Company’s announcement of 1 September 2020.

Mahab and Magal South deposits


Click here for the full ASX Release

This article includes content from Critical Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

CRR:AU
The Conversation (0)
Drilling Commences at the Barra Lithium Project in Brazil

Drilling Commences at the Barra Lithium Project in Brazil

Summit Minerals Limited (ASX:SUM) (“Summit” or the “Company”) is pleased to announce that Summit’s maiden drilling program has commenced at the recently acquired 100% owned Barra Lithium Project (“Barra”).

The Barra Lithium Project consists of four recently acquired tenements that are located within close proximity to the existing operating Miranda Lithium mine that is within the Borborema Pegmatitic Province (“BPP”) in northeast Brazil.

Keep reading...Show less
Lithium Universe

Lithium Universe


Keep reading...Show less
CleanTech Lithium (AIM:CTL)

Issue of Equity and TVR


Keep reading...Show less
Lithium-ion batteries.

Rio Tinto Shares Initial Resources and Ore Reserves for Rincon Lithium Project

Rio Tinto ( ASX:RIO,NYSE:RIO,LSE:RIO) released an initial mineral resources and ore reserves report for its 100 percent owned Argentina-based Rincon project on Wednesday (December 4).

Mineral resources inclusive of ore reserves comprise 1.54 million tonnes of lithium carbonate equivalent in the measured category, with 7.75 million tonnes in the indicated category and 2.29 million tonnes in the inferred category.

Probable ore reserves are made up of 2.07 million tonnes of lithium carbonate equivalent.

Keep reading...Show less

Latest Press Releases

Related News

×