davidson and company vancouver

Standard Uranium Begins Phase II Winter Drill Program at its Flagship Davidson River Project

Standard Uranium Ltd. ("Standard Uranium" or the "Company") (TSX-V:STND) (OTCQB:STTDF) (Frankfurt:FWB:9SU) is pleased to announce the Phase II winter drill program at its flagship 25,886-hectare Davidson River Uranium Project (the "Project") has begun. The winter program will consist of approximately 4,500 m of diamond drilling in 9 holes. The Project is located in the Southwest Athabasca Uranium District of Saskatchewan 25 km to 30 km to the west of Fission Uranium's Triple R and NexGen's Arrow deposits and encapsulates the Warrior corridor which is inferred to be the continuation of the Patterson Lake corridor. Full details of the Phase II drill program are available in the previously announced news release on December 29, 2020 .

Jon Bey, President, CEO and Chairman, commented: "It is great to see the drills turning again on our Davidson River Project and to have the Aggressive Drilling team working with us once again. Their experience with our Phase I drilling program, and in this region, will go a long way to help us in making a high-grade uranium discovery. Our technical team have prepared an exciting drill program and I look forward to getting to the project site to view core with them."

Phase II Drilling Program Summary and Update :

  • Objective is to make a basement hosted high-grade uranium discovery,
  • 4,500m in nine holes planned for winter, and 1,350m in four holes planned for summer,
  • Road construction completed on February 5 th , 2021,
  • Drilling commenced on February 8 th , 2021,
  • Follow-up drilling on the Warrior corridor with vectoring information gained during the Phase I program (See Figure 1),
  • Exploring two new corridors, Bronco and Saint (See Figure 1), through drill testing offsets and flexures in wide conductive corridors searching for: radioactivity, alteration, structure, and graphite-rich and sulphide-rich shear zones,
  • Increasing the geological knowledge and discovery potential of the Davidson River Property through collection and interpretation of technical information from strategically planned drill holes.

Figure 1 accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/98cf708c-655d-489d-8001-bb639b61176c

Sean Hillacre, Project Geologist and Exploration Program Manager, states, "I am very happy to be back up here drilling our refined Warrior targets and breaking ground on the Saint trend. The Phase II targets we have developed for this winter season are very encouraging and we have assembled an outstanding exploration team, with experience at making discoveries in this region. I am excited to see what we can accomplish with the technical information gained from our Phase I drilling."

The Company is using the Big Bear Lodge located on Grygar Lake as its base camp for the duration of this exploration program. "It is extremely important for us to partner with the local communities and safety is our number one priority. We will follow best practices for working safely and will continue to monitor the COVID-19 situation," stated Neil McCallum, VP Exploration.

The scientific and technical information contained in this news release has been reviewed and approved by Neil McCallum, VP Exploration and is a "Qualified Person" as defined in NI 43-101. For additional information with respect to the Davidson River Project, please reference the NI 43-101 technical report titled: "Updated Technical Report on the Davidson River Property Northwest Saskatchewan, Canada" with an effective date March 16, 2020 available under the Company's SEDAR profile at www.sedar.com.

About Standard Uranium (TSX-V: STND)

We find the fuel to power a clean energy future

Standard Uranium is a mineral resource exploration company based in Vancouver, British Columbia. Since its establishment, Standard Uranium has focused on the identification and development of prospective exploration stage uranium projects in the Athabasca Basin in Saskatchewan, Canada. Standard Uranium's Davidson River Project, in the southwest part of the Athabasca Basin, Saskatchewan, is comprised of 21 mineral claims over 25,886 hectares. The Davidson River Project is highly prospective for basement hosted uranium deposits. A copy of the NI 43-101 Technical Report that summarizes the exploration on the Project is available for review under Standard Uranium's SEDAR issuer profile ( www.sedar.com ).

For further information contact:

Jon Bey, President, Chief Executive Officer, and Chairman
550 Denman Street, Suite 200
Vancouver, BC V6G 3H1
Tel: 1 (306) 850-6699
E-mail: info@standarduranium.ca

Cautionary Statement Regarding Forward-Looking Statements

This news release contains "forward-looking statements" or "forward-looking information" (collectively, "forward-looking statements") within the meaning of applicable securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on the assumptions, expectations, estimates and projections as of the date of this news release. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by forward-looking statements contained herein. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Standard Uranium disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or otherwise, except as may be required by applicable securities laws. Readers should not place undue reliance on forward-looking statements.

Neither TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

The Conversation (0)
Snow Lake Completes Due Diligence and Confirms Placement

Snow Lake Completes Due Diligence and Confirms Placement

GTI Energy (GTR:AU) has announced Snow Lake Completes Due Diligence and Confirms Placement

Download the PDF here.

North Shore Uranium (TSXV:NSU)

North Shore Announces Non-Brokered Private Placement

North Shore Uranium Ltd. (TSXV:NSU) ("North Shore" or the "Company") is pleased to announce a non-brokered private placement offering for aggregate gross proceeds of up to $1,400,000, through the issuance of a combination of non-flow-through units (the "NFT Units") at a price of $0.05 per NFT Unit and flow-through units (the "FT Units") at a price of $0.065 per FT Unit (the "Offering"). Each NFT Unit consists of one non-flow-through common share and one-half of one share purchase warrant (each whole share purchase warrant, a "Warrant"). Each FT Unit consists of one flow-through common share and one-half of one Warrant. Each Warrant entitles the holder to purchase one non-flow through common share (each a "Warrant Share") at a price of $0.10 per Warrant Share for a period of two years from closing of the Offering.

Keep reading...Show less
U.S. flag waving in front of a neoclassical building facade.

Uranium Energy’s Sweetwater Project Fast-Tracked Under Trump Initiative

In the latest show of federal support for domestic uranium production, Uranium Energy (NYSEAMERICAN:UEC) Sweetwater uranium complex in Wyoming has been designated for expedited permitting under the Trump administration’s FAST-41 initiative.

The designation, announced August 5, places Sweetwater on the Federal Permitting Improvement Steering Council’s FAST-41 dashboard, a move that aims to accelerate environmental reviews and interagency approvals under a framework established by the 2015 Fixing America’s Surface Transportation (FAST) Act.

Keep reading...Show less
Canadian flag next to uranium ore.

5 Best-performing Canadian Uranium Stocks of 2025

The uranium market stumbled into Q2 after the spot price dipped to an 18 month low of US$63.50 per pound in March amid abundant secondary supply and cautious utility contracting.

By June, however, prices had rebounded into the US$70 range on renewed US policy support and heightened geopolitical tensions. While the spot market remains volatile, long-term prices have held steady at US$80 level.

Yet utility demand still lags. Just 25 million pounds had been contracted as of mid-year, putting 2025 on track to fall well short of the 160 million pounds booked in 2023.

Keep reading...Show less
Phone displaying Cameco logo beside glasses and keyboard.

Cameco Lifts Outlook on Nuclear Momentum, Westinghouse Boost After Strong Q2 Performance

Cameco (TSX:CCO,NYSE:CCJ) is riding a wave of renewed nuclear optimism and long-term contracting after posting robust second quarter earnings, raising its expectations for the rest of 2025.

In results released on Wednesday (July 30), the firm reported net earnings of US$234 million for the second quarter and US$285 million for the first half of 2025, both significantly above 2024 levels. Adjusted EBITDA for the quarter came in at US$491 million, with strong contributions across its uranium, fuel services and Westinghouse segments.

“Our integrated strategy that aligns our marketing, operational, and financial decisions continues to serve us well in a market that is shifting its focus toward security of supply,” said Cameco CEO Tim Gitzel.

Keep reading...Show less

Latest Press Releases

Related News

×