Energy

(TheNewswire)

UEX Corporation

Saskatoon, Saskatchewan TheNewswire - October 29, 2021 UEX Corporation (TSX:UEX ) ( OTC:UEXCF) (" UEX " or the " Company ") is pleased to announce that its 50% owned subsidiary, JCU (Canada) Exploration Company, Limited (" JCU ") and Denison Mines Corp. (" Denison ") have completed a successful 2021 In-Situ Recovery ("ISR") Field Test Program.  The program was completed within the commercial-scale ISR test pattern installed in the Phase 1 area of the high-grade Phoenix uranium deposit on the Wheeler River Project.

The Wheeler River Joint Venture is 10% owned by JCU and 90% by Denison, who is the operator of the WRJV.  JCU is 50% owned by UEX and 50% by Denison, and is operated by UEX.

The 2021 ISR test program was able to measure production flow-rates between drill holes, confirm hydraulic control of injected solution during the ion tracer tests, determine breakthrough times between wells, and demonstrate the ability to remediate the test well pattern.   The Test Program was undertaken to increase confidence in the potential application of the ISR mining method at the Phoenix Deposit and to support the recently announced Feasibility Study (see UEX News Release dated September 22, 2021).

Further details and results of the Phoenix ISR field test program can be found in Denison's news release dated October 28, 2021 and filed on Denison's profile on SEDAR.com

Qualified Persons

The technical information in this news release has been reviewed and approved by Roger Lemaitre, P.Eng., P.Geo., UEX's President and CEO, who is considered to be a Qualified Person as defined by National Instrument 43-101.

About UEX

UEX is a Canadian uranium and cobalt exploration and development company involved in an exceptional portfolio of uranium projects.

UEX's directly-owned portfolio of projects is located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt which in 2020 accounted for approximately 8.1% of the global primary uranium production.  In addition to advancing its uranium development projects through its ownership interest in JCU,  UEX is currently advancing several other uranium deposits in the Athabasca Basin which include the Paul Bay, Ken Pen and Ōrora deposits at the Christie Lake Project , the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project, the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Development Project and the West Bear Uranium Deposit located at its 100%-owned West Bear Project.

UEX is also 50:50 co-owner of JCU with Denison.  JCU's portfolio of projects includes interests in some of Canada's key future uranium development projects, notably a 30.099% interest in Cameco's Millennium Uranium Development Project, a 10% interest in Denison Mines Wheeler River Project, and a 33.8123% interest in Orano Canada's Kiggavik Project, located in the Thelon Basin in Nunavut, as well as minority interests in nine other grassroots uranium projects in the Athabasca Basin.

UEX is also leading the discovery of cobalt in Canada, with three cobalt-nickel exploration projects located in the Athabasca Basin of northern Saskatchewan, including the only primary cobalt deposit in Canada.  The 100% owned West Bear Project hosts the West Bear Cobalt-Nickel Deposit, the newly discovered Michael Lake Co-Ni Zone, and the West Bear Uranium Deposit.  UEX also owns 100% of two early-stage cobalt exploration projects, the Axis Lake and Key West Projects.

FOR FURTHER INFORMATION PLEASE CONTACT

Roger Lemaitre

President & CEO

(306) 979-3849

Forward-Looking Information

This news release contains statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such statements are based on UEX's current expectations, estimates, forecasts and projections. Such forward-looking information includes statements regarding the West Bear Co-Ni Property, the Christie Lake Property drill program, the Hidden Bay Property, the Shea Creek Property, UEX's drill hole results, uranium, cobalt and nickel prices, outlook for our future operations, plans and timing for exploration activities, and other expectations, intentions and plans that are not historical fact. Such forward-looking information is based on certain factors and assumptions and is subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking information. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to the, interpretation of drill results and geology, assay confirmation, additional drilling results, continuity and grade of deposits, fluctuations in uranium, cobalt and nickel prices and currency exchange rates, changes in environmental and other laws affecting uranium, cobalt and nickel exploration and mining and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable Canadian securities commissions on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Copyright (c) 2021 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

Transaction Increasing Cameco's Ownership Stake in Cigar Lake Closes

CAMECO (TSX: CCO; NYSE: CCJ) announced that the acquisition of Idemitsu Canada Resources Ltd.'s (Idemitsu) 7.875% participating interest in the Cigar Lake Joint Venture by Cameco and Orano Canada Inc. (Orano) closed today.

Cameco's ownership stake in the Cigar Lake uranium mine in northern Saskatchewan now stands at 54.547%, 4.522 percentage points higher than it was prior to the transaction, while Orano's interest is 40.453%, an increase of 3.353 percentage points from its previous share. TEPCO Resources Inc. retains the remaining 5% interest in the property.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

NexGen Files Management Information Circular in Connection with Annual General and Special Meeting of Shareholders

NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE MKT: NXE) (ASX: NXG) is pleased to announce it has mailed the Notice of Meeting and Management Information Circular to shareholders of record as of May 9, 2022 in connection with the Annual General and Special Meeting to be held on Thursday, June 23, 2022 at 2:00 p.m. (Pacific Time) .

Your vote is important - please vote today.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
two chess pieces, both knights, face each other

How Geopolitics are Impacting the Nuclear Fuel Sector

As the war in Ukraine stretches into the third month, it has become evident that the energy sector has been disproportionately affected by embargoes, bans and sanctions against Russia.

With West Texas and Brent Crude oil holding above US$100 a barrel, motorists in North America have seen gas prices rise to record highs. Similarly, natural gas prices have also hit fresh highs this year, as well as coal, which hit an all-time high of US$422 per metric ton (MT) in March.

Uranium, the energy fuel used to power nuclear generators for electricity production, has also experienced a significant price increase since Russia invaded Ukraine.

Keep reading...Show less
Purepoint Uranium Outlines Upcoming Exploration Session

Purepoint Uranium Outlines Upcoming Exploration Session

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") today outlined their remaining 2022 exploration plans for the Hook Lake Joint Venture and eight of their 100% owned projects in the Athabasca Basin, Saskatchewan Canada. These plans include follow-up drilling at the Company's Red Willow project where this winter's program outlined an astounding 1.2 kilometres of continuous elevated radioactivity (see news release April 19, 2022).

"By the end of the year we will have completed updated field work at all of our ten, 100% owned uranium projects. This work has included follow-up drilling at some of our high priority targets, inaugural drilling at our more advanced prospects and initial geophysical work over our earlier stage properties," noted Chris Frostad, President & CEO of Purepoint. "Although we continue to advance our entire portfolio, we are most excited about returning to our newest priority at Red Willow's Osprey Zone. The discovery of a clearly defined continuous zone of radioactivity extending across such a long distance, with peaks exceeding 33,000 counts per second, provides an exciting preview of what our next program may demonstrate."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Baselode Continues to Hit Near-Surface Mineralization and Some of the Strongest Intersections of Elevated Radioactivity

Baselode Continues to Hit Near-Surface Mineralization and Some of the Strongest Intersections of Elevated Radioactivity

Highlights:

  • Three drill holes have now intersected elevated radioactivity within 45 m of vertical depth from surface
  • Two holes returned some the strongest elevated radioactivity intersections on ACKIO
  • AK22-040: 744 cps over 22.75 m at 115.05 m (new 2 nd best radioactivity intersection)
  • AK22-023: 538 cps over 29.25 m at 129.95 m (new 4 th best radioactivity intersection)
  • Change in drill azimuth direction has yielded a 100% intersection success

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) (" Baselode " or the " Company ") is pleased to provide an update on the ongoing 20,000 metre diamond drilling program (the " Program ") on the ACKIO high-grade uranium discovery (" ACKIO "), Hook project (" Hook "), Athabasca Basin area, northern Saskatchewan (see Figure 1 and Table 1 ).

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×