eldona

Magna Mining Announces Winter Exploration Program at the Shakespeare Project and Results of Recent Borehole Electromagnetic Survey

Program to Focus on Follow-Up Drilling at the P-4 Discovery and Near Surface Copper Mineralization at the Past Producing Spanish River Copper Mine

Magna Mining Inc. (TSXV: NICU) ("Magna" or the "Company") is pleased to announce that following the completion of a $3.14 million flow through financing on Nov 3rd, the next phase of exploration at the Shakespeare Ni-Cu-PGM Project will commence in early January. The initial winter exploration program will consist of 4,500m of drilling, which will target the new P-4 nickel discovery and the past producing Spanish River Copper Mine. The P-4 Discovery and Spanish River Copper Mine are both located approximately 5 km from the Shakespeare Mine and could potentially represent satellite deposits to feed a future mill at Shakespeare. Magna has secured a diamond drilling contractor to commence drilling in early January 2022.

A borehole electromagnetic (EM) survey was recently completed which extends the electromagnetic anomaly 230 m below the deepest mineralized intersection. The interpreted EM plate is electromagnetically open at depth and the data indicates that conductivity is increasing at depth. The higher conductivity could be attributed to higher concentration of sulphides, thicker width or both. The surveys were completed on holes MP4-21-01 and MP4-21-02, which were the P-4 nickel discovery holes as reported on September 14, 2021 (see News Release). The drill program in January will prioritize the testing of the depth extent of this EM plate, and also test the eastern EM plate (see Figures 1 and 2).

Jason Jessup, Chief Executive Officer of Magna, stated, "The results of these new downhole electromagnetic surveys at our P-4 discovery indicate that there is a conductive zone extending to depth, well below the mineralized intersections in the first discovery holes that we reported in September of this year. It is particularly encouraging to have the conductivity increasing at depth. We are prioritizing our drilling in January to test some significant step-outs from the previous drilling and see how big this system gets at depth and along strike. The EM survey results are exactly the sort of indications you would expect to see in semi-massive or massive sulphide nickel and copper discoveries in the Sudbury region."

The winter diamond drilling program will also aim to test new targets at the Spanish River Copper Mine, located approximately 1 km south of the P-4 Discovery (see Figure 3). Magna has the option to earn-in to 100% ownership on the 7 claims comprising the historic Spanish River Copper Mine. The proposed diamond drill program at Spanish River Copper is designed to test high conductance EM plates that have been modelled from surface EM surveys that were completed earlier this year. Zones of chalcopyrite dominated mineralization associated with a deformation corridor have been mapped on surface along a 300 m strike length (see Figure 3). The drilling that is now scheduled is believed to be the first diamond drilling program at this particular location in over 50 years.

Jason Jessup added: "Our drilling at the P-4 target and early exploration work at the Spanish River Copper Mine comprise the first significant regional exploration program outside the Shakespeare mine site in over 15 years. Our early exploration successes support our thesis that our 180km2 exploration land package surrounding the Shakespeare Mine is high prospective for nickel and copper discoveries. Ultimately, we believe that new regional discoveries such as P-4 point to the potential for Magna to build a hub and spoke production model with our already permitted Shakespeare Mine as the core to the operation."

2021 Shakespeare Project Drilling Results Update

Magna is awaiting approximately 550 assay results from 11 drill holes from our 2021 program, including 3 holes from the Gap Zone area. It is anticipated that all assays will be received by mid-January.



Figure 1: Simplified longitudinal section looking NW showing high conductance EM plates and exploration potential along the strike (for location see Figure 3)

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/8002/105968_a2a19f18b459aa1b_002full.jpg



Figure 2: Simplified interpreted cross section showing lithologies and BHEM plate (for location see Fig. 1 & 3)

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/8002/105968_a2a19f18b459aa1b_007full.jpg



Figure 3: Map of Spanish River Copper Mine exploration target showing lithologies, deformation corridor and relationship to P-4 Discovery

To view an enhanced version of Figure 3, please visit:
https://orders.newsfilecorp.com/files/8002/105968_a2a19f18b459aa1b_008full.jpg

Qualified Person

The technical information in this press release has been reviewed and approved by Mynyr Hoxha, Ph.D., P.Geo., the Company's Vice President of Exploration. Dr. Hoxha is a qualified person under Canadian National Instrument 43-101.

About Magna Mining Inc.

Magna Mining is an exploration and development company focused on nickel, copper and PGM projects in the Sudbury Region of Ontario, Canada. The Company's flagship asset is the past producing Shakespeare Mine which has major permits for the construction of a 4500 tonne per day open pit mine, processing plant and tailings storage facility and is surrounded by a contiguous 180km2 prospective land package. Additional information about the Company is available on SEDAR (www.sedar.com) and on the Company's website (www.magnamining.com).

For further information, please contact:
Jason Jessup
Chief Executive Officer
or
Paul Fowler, CFA
Senior Vice President
Email: info@magnamining.com

Cautionary Statement

This press release contains certain forward-looking information or forward-looking statements as defined in applicable securities laws. Forward-looking statements are not historical facts and are subject to several risks and uncertainties beyond the Company's control, including statements regarding plans to complete exploration programs, potential mineralization, exploration results and statements regarding beliefs, plans, expectations or intentions of the Company. Resource exploration and development is highly speculative, characterized by several significant risks, which even a combination of careful evaluation, experience and knowledge may not eliminate. All forward-looking statements herein are qualified by this cautionary statement. Accordingly, readers should not place undue reliance on forward-looking statements. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking statements whether as a result of new information or future events or otherwise, except as may be required by law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this press release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/105968

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Forum Energy: Ambient Noise Tomography Survey Establishes New Drill Targets over 1+ km Extension Along the Tatiggaq Fault Zone, Aberdeen Uranium Project, Nunavut

Forum Energy: Ambient Noise Tomography Survey Establishes New Drill Targets over 1+ km Extension Along the Tatiggaq Fault Zone, Aberdeen Uranium Project, Nunavut

Forum Energy Metals Corp. (TSXV: FMC) (OTCQB: FDCFF) ("Forum" or the "Company") has reviewed initial data processed from its Ambient Noise Tomography (ANT) survey conducted over the Tatiggaq anomaly during the summer of 2023, The survey successfully established new drill targets over a one plus kilometer east-northeast extension along the Tatiggaq fault zone, which hosts the high-grade Tatiggaq uranium discovery at Forum's 100% owned Aberdeen Project in the Thelon Basin, Nunavut. The Aberdeen project comprises 95,500 hectares and is located adjacent to Orano's 133 million pound Kiggavik uranium project* (Figure 1).

Dr. Rebecca Hunter, Forum's VP, Exploration commented, "The ANT survey may be a game-changing geophysical method for targeting unconformity systems in the northeast Thelon Basin. By measuring the velocity change interfaces throughout our anomalies, we can potentially image the faults that host the mineralization and the location of the mineralized bodies themselves. The survey results obtained suggest we will be able to target our drilling with a much higher degree of precision than what could be done in the past. I am very excited to resume on our Aberdeen Project in 2024."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Ero Copper to Release First Quarter 2024 Operating and Financial Results on May 7, 2024

Ero Copper Corp. (TSX: ERO, NYSE: ERO) (the "Company") will publish its first quarter 2024 operating and financial results on Tuesday, May 7, 2024 after market close. The Company will host a conference call to discuss the results on Wednesday, May 8, 2024 at 11:30am Eastern time (8:30am Pacific time).

CONFERENCE CALL DETAILS

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Copper bars in a row with arrow above ascending.

Copper Prices Hit 22 Month High as Supply Concerns Mount

Copper prices hit a nearly two year high this week, and according to analystsat investment bank Citigroup (NYSE:C) that's a sign the red metal has entered its second secular bull market of the century.

Over the past two months, copper has surged by more than 15.75 percent, fueled by disruptions at mining operations that have threatened refined copper production in China, a major global supplier.

“The recent disruptions to major mines are starting to ripple through the industry,” said strategist Daniel Hynes of Melbourne's ANZ Bank. “A group of 13 major copper smelters in China is preparing for a possible 10 percent production cut due to a collapse in treatment and refining charges.”

Keep reading...Show less
A closeup of the end of many copper cylinders of varying sizes.

Top 5 ASX Copper Stocks of 2024

Copper has hit record highs in recent years, and after setbacks at the start of 2024 its fortune has begun to turn.

Prices rebounded to 14 month highs at the beginning of Q2 on improved global manufacturing data, encouraging economic indicators in China and supply disruptions at key mines. In the longer term, many market watchers see tight supply and higher consumption from sectors like the electric vehicle industry creating a robust outlook for copper.

Against that backdrop, the top ASX copper stocks have put on impressive year-to-date share price performances. The list below outlines the top gainers, and was generated on April 9, 2024, using TradingView’s stock screener; all copper stocks listed had market caps above AU$50 million at that time. Read on to learn more about them.

Keep reading...Show less
  Far Northern Resources

Far Northern Resources Limited (ASX: FNR) – Admission and Quotation

Description

Far Northern Resources Limited (‘FNR’) was admitted to the Official List of ASX on Wednesday, 10 April 2024. The securities of FNR will commence quotation at 11:00 AEST on Friday, 12 April 2024.

Keep reading...Show less

Latest Press Releases

Related News

×