Ivanhoe Mines: United States Announces Support for Development of Lobito Atlantic Railway Corridor at the 2023 G7 Summit

United States announces support for development of Lobito Atlantic Railway Corridor at the 2023 G7 Summit

U.S. International Development Finance Corporation evaluating $250 million in financing for 'key economic' rail corridor connecting the Angolan port of Lobito to the DRC Copperbelt

Rail corridor passes through Western Foreland licences and within five kilometres of Kamoa-Kakula Copper Complex

Distance from Kamoa-Kakula to Angolan Lobito Ocean Port is approximately halved compared with Durban, South Africa, providing for significant potential logistics cost improvement

Lobito Corridor and other initiatives, such as Ivanhoe's work on the Kipushi border, set to transform regional logistics in the DRC and neighbouring countries

Kolwezi, Democratic Republic of Congo--(Newsfile Corp. - May 24, 2023) - Ivanhoe Mines (TSX: IVN) (OTCQX: IVPAF) Executive Co-Chair Robert Friedland and President Marna Cloete announce that the U.S. Government made a press statement during the 2023 G7 Summit in Hiroshima, Japan, stating that the United States International Development Finance Corporation (DFC) is currently performing due diligence for a potential $250 million investment to finance the open-access Lobito Atlantic Railway Corridor (Lobito Corridor) from the port of Lobito in Angola to the Angolan-DRC border.

The "transformative economic corridor" connects the Angolan port of Lobito to the Democratic Republic of Congo (DRC) Copperbelt. Once fully operational, the Lobito Corridor could significantly improve the logistics costs and carbon footprint of exporting metals from the Kamoa-Kakula Copper Complex, the Kipushi zinc-copper-germanium-silver mine, as well as the future development of any copper discoveries within the Western Foreland Exploration Project.

The announcement follows the recent award of a 30-year concession on the Angolan side of the Lobito Corridor, with the potential of a 20-year extension, to a consortium including Trafigura Pte Ltd., of Geneva, Switzerland, and Mota-Engil of Porto, Portugal. The consortium will be responsible for the operation, management and maintenance of the rail infrastructure and rolling stock from the Lobito port to the Angolan-DRC border. The agreement announced in the fourth quarter of 2022 involves a total investment of $450 million, including $166 million in infrastructure upgrades and $70 million in rolling stock. Further, on January 27, 2023, the governments of Angola, DRC, and Zambia signed the Lobito Corridor Transit Transport Facilitation Agency Agreement (LCTTFA). The tri-partite LCTTFA aims to coordinate the joint development activities of the Lobito Corridor. The Lobito Corridor provides an alternative, strategic route to export markets for both Zambia and the DRC, which today both rely heavily on road transportation for the export of metals.

Link to the full U.S. Government press statement: https://www.whitehouse.gov/briefing-room/statements-releases/2023/05/20/fact-sheet-partnership-for-global-infrastructure-and-investment-at-the-g7-summit/

Ivanhoe Mines' Executive Co-Chairman, Robert Friedland, commented:

"The Lobito Corridor will soon be one of the most important trade routes for vital copper metal and other critical minerals required for our planet's energy transition. The proposed investment by the U.S. Government emphasizes that a coordinated global effort is required to upgrade critical infrastructure across sub-Saharan Africa to unlock the tremendous potential of this region, and in the process generate unprecedented economic benefits for the Democratic Republic of Congo and its neighbours, Angola and Zambia.

"The open access to the deep-water port in Lobito by rail would not be possible without the vision and investment made by our shareholders CITIC and Zijin. CITIC was instrumental in upgrading the Lobito port and the rail line in 2014, while our joint venture partner Zijin is currently active in upgrading road and border infrastructure in the Democratic Republic of Congo to enable access to the Lobito Corridor from the Copperbelt, as well as improve existing export corridors.

"If we are to address the daunting challenges of global climate change, it is imperative that we have international cooperation to develop responsible mineral supply chains, in partnership with the local people and communities where these mineral deposits are located."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3396/167266_992c224af4a4796e_002.jpg

Freight train on the Lobito Corridor, near the port of Lobito in Angola. The rail corridor, originally called the Benguela Railway, was first built at the turn of the 20th Century and in 2014 a $1.8 billion refurbishment was completed. Source: Ministry of Transport for Angola.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3396/167266_992c224af4a4796e_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3396/167266_992c224af4a4796e_003.jpg

The freight terminal at the Lobito port, Angola. Refurbished in 2014, the container and general cargo terminal has a total area of ​​241,540 square metres, a berth of 1,199 metres and the capacity to handle more than 600,000 tons of non-containerized freight and 250,000 TEU (twenty-foot equivalent units) of containerized freight per year.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3396/167266_992c224af4a4796e_003full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3396/167266_992c224af4a4796e_004.jpg

Figure 1. Map of export routes currently used by Kamoa-Kakula. Logistics costs account for over 30% of Kamoa-Kakula's total cash costs (C1), due to the long in-land distances travelled by road for exports to reach port.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3396/167266_992c224af4a4796e_004full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/3396/167266_992c224af4a4796e_005.jpg

Figure 2. Map of Kamoa-Kakula and Western Foreland licences with local road and rail infrastructure.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/3396/167266_992c224af4a4796e_005full.jpg

All figures are in U.S. dollars unless otherwise stated.

About Ivanhoe Mines

Ivanhoe Mines is a Canadian mining company focused on advancing its three principal projects in Southern Africa; the expansion of the Kamoa-Kakula Copper Complex in the DRC, the construction of the tier-one Platreef palladium-rhodium-platinum-nickel-copper-gold project in South Africa; and the restart of the historic ultra-high-grade Kipushi zinc-copper-germanium-silver mine, also in the DRC.

Ivanhoe Mines also is exploring for new copper discoveries across its circa 2,400km2 of 90-100% owned exploration licences in the Western Foreland, located adjacent to, or in close proximity to, the Kamoa-Kakula Copper Complex in the DRC.

Information contact

Investors
Vancouver: Matthew Keevil +1.604.558.1034
London: Tommy Horton +44 7866 913 207

Media
Tanya Todd +1.604.331.9834

Forward-looking statements

Certain statements in this news release constitute "forward-looking statements" or "forward-looking information" within the meaning of applicable securities laws. Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of the company, its projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such statements can be identified using words such as "may", "would", "could", "will", "intend", "expect", "believe", "plan", "anticipate", "estimate", "scheduled", "forecast", "predict" and other similar terminology, or state that certain actions, events, or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. These statements reflect the company's current expectations regarding future events, performance and results and speak only as of the date of this news release.

Such statements include without limitation, the timing and results of: (i) statements that the Angolan Lobito Ocean Port is approximately halved compared with Durban, South Africa, and provides for significant potential logistics cost improvement; (ii) statements that the Lobito Corridor could significantly improve the carbon footprint of exporting metals from the Kamoa-Kakula Copper Complex, the Kipushi zinc-copper-germanium-silver mine, as well as the future development of any copper discoveries within the Western Foreland Exploration Project; (iii) statements that the Lobito Corridor and other initiatives, such as Ivanhoe's work on the Kipushi border, set to transform regional logistics in the DRC and neighbouring countries, including Angola and Zambia; (iv) statements that the Lobito Corridor will soon be one of the most important trade routes for vital copper metal and other critical minerals; and (v) statements regarding future rail spur from Kamoa.

Furthermore, concerning this specific forward-looking information concerning the operation and development of the Kamoa-Kakula Copper Complex and Kipushi projects and Western Foreland, the company has based its assumptions and analysis on certain factors that are inherently uncertain. Uncertainties include: (i) the adequacy of infrastructure; (ii) geological characteristics; (iii) metallurgical characteristics of the mineralization; (iv) the ability to develop adequate processing capacity; (v) the price of copper, nickel, zinc, platinum, palladium, rhodium and gold; (vi) the availability of equipment and facilities necessary to complete development; (vii) the cost of consumables and mining and processing equipment; (viii) unforeseen technological and engineering problems; (ix) accidents or acts of sabotage or terrorism; (x) currency fluctuations; (xi) changes in regulations; (xii) the compliance by joint venture partners with terms of agreements; (xiii) the availability and productivity of skilled labour; (xiv) the regulation of the mining industry by various governmental agencies; (xv) the ability to raise sufficient capital to develop such projects; (xvi) changes in project scope or design; (xvii) recoveries, mining rates and grade; (xviii) political factors; (xviii) water inflow into the mine and its potential effect on mining operations, and (xix) the consistency and availability of electric power.

Forward-looking statements and information involve significant risks and uncertainties, should not be read as guarantees of future performance or results and will not necessarily be accurate indicators of whether such results will be achieved. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements or information, including, but not limited to, the factors discussed above and under the "Risk Factors" section in the company's MD&A for the three months ended March 31, 2023, and its Annual Information Form, and elsewhere in this news release, as well as unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with the company to perform as agreed; social or labour unrest; changes in commodity prices; and the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations.

Although the forward-looking statements contained in this news release are based upon what management of the company believes are reasonable assumptions, the company cannot assure investors that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release and are expressly qualified in their entirety by this cautionary statement. Subject to applicable securities laws, the company does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this news release.

The company's actual results could differ materially from those anticipated in these forward-looking statements as a result of the factors outlined in the "Risk Factors" section and elsewhere in the company's MD&A for the three months ended March 31, 2023, and its Annual Information Form.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/167266

News Provided by Newsfile via QuoteMedia

IVN:CA,IVPAF
The Conversation (0)
Empire Metals

Empire Metals Limited Announces Drilling Outlines Large, High-Grade Zone

Empire Metals Limited, theAIM-quoted and OTCQB-tradedexploration and development company,is pleased to report outstanding assay results from its latest drilling campaign at the Pitfield Project in Western Australia ('Pitfield' or the 'Project'). This programme, focused on the in-situ weathered cap at the Thomas Prospect, has delivered some of the highest titanium dioxide ('TiO₂') grades recorded to date and will underpin the Company's maiden JORC-compliant Mineral Resource Estimate ('MRE').

Highlights

Keep reading...Show less
 Adam Woolridge, CEO of Cobre.

Cobre Unveils Maiden Resource at Comet, Targets Low-cost In-situ Copper Recovery

Highlighting the first mineral resource estimate (MRE) at Comet within the Ngami copper project in Botswana, Cobre (ASX:CBE) CEO Adam Woolridge outlines a path toward low-cost, scalable in-situ copper recovery, backed by significant exploration upside.

“You're looking at an exploration target of 200 million to 300 million tonnes at around 0.4 percent copper,” Woolridge said.

“When you start looking at this as an in-situ copper recovery process, you have really good grade continuity. And this has been reflected in the MRE. And it's also come out from just looking at this deposit from a geometry point of view — it's got a really simple geometry, a lot of great continuity, and it's been relatively cost effective to move each tonne of contained copper into category.”

Keep reading...Show less
"Welcome to Arizona" sign with sunburst design against a blue sky background.

Hudbay Secures US$600 Million Mitsubishi Partnership for Arizona Copper Project

Hudbay Minerals (TSX:HBM,NYSE:HBM) has struck a US$600 million deal with automobile giant Mitsubishi (TSE:8058) for a 30 percent stake in its Copper World project in Arizona, marking one of the largest foreign investments in the US copper sector in recent years.

Announced Tuesday (August 12), the agreement will see Mitsubishi pay US$420 million on closing and a further US$180 million within 18 months.Mitsubishi will also fund its 30 percent share of future capital contributions as the mine moves toward full construction.

Keep reading...Show less
Copper bars with weight stamps, stock market chart background.

What Was the Highest Price for Copper?

Strong demand in the face of looming supply shortages has pushed copper to new heights in recent years.

With a wide range of applications in nearly every sector, copper is by far the most industrious of the base metals. In fact, for decades, the copper price has been a key indicator of global economic health, earning the red metal the moniker “Dr. Copper.” Rising prices tend to signal a strong global economy, while a significant longer-term drop in the price of copper is often a symptom of economic instability.

After bottoming out at US$2.17 per pound, or US$5,203.58 per metric ton (MT), in mid-March 2020, copper has largely been on an upward trajectory.

Keep reading...Show less
Map of Argentina with the Chilean flag placed in central Argentina.

Codelco Seeks Partial Restart at El Teniente Mine After Fatal Collapse

Chile’s state-owned copper giant Codelco is seeking approval to restart parts of its flagship El Teniente mine less than a week after a deadly collapse killed six workers and forced a full suspension of operations, according to sources familiar with the matter.

The accident, triggered by a 4.2-magnitude seismic event last Thursday (July 31), halted production at the world’s largest underground copper mine.

Keep reading...Show less
Smartphone with Anglo American logo on screen in front of a laptop showing a stock chart.

Anglo American’s Losses Widen with Diamond Slump, Trade Tensions Mounting

Anglo American (LSE:AAL,OTC Pink:AAUKF) reported a sharp US$1.9 billion net loss for the first half of 2025, deepening from US$672 million a year earlier, as the global miner pushed forward with a sweeping corporate overhaul aimed at focusing on copper and iron ore.

The London-based group’s latest results saw revenue dropping by 7 percent year-on-year to US$8.95 billion, falling short of analyst expectations, while underlying EBITDA fell 20 percent to US$3 billion.

“By focusing on our exceptional copper, premium iron ore and crop nutrients resource endowments, each with significant value-accretive growth options, we are unlocking material value for our shareholders,” Chief Executive Duncan Wanblad assured in the company’s recent performance report.

Keep reading...Show less

Latest Press Releases

Related News

×