• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • WORLD EDITION
      Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • WORLD EDITION
      North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Minerals
    Tech
    Life Science
    Base Metals Market
    Base Metals News
    Base Metals Stocks
    • Base Metals Market
    • Base Metals News
    • Base Metals Stocks

    Pilot Gold Reports Preliminary Economic Assessment Results from Copper-Gold Porphyry Project

    Vivien Diniz
    Oct. 10, 2012 01:38PM PST
    Base Metals Investing

    Pilot Gold (TSX:PLG) reported the results from its Preliminary Economic Assessment for the Halilaga copper-gold porphyry project in northwestern Turkey. The PEA is based on a mineral resource estimate first presented on March 23, 2012.

    Pilot Gold (TSX:PLG) reported the  results from its Preliminary Economic Assessment for the Halilaga copper-gold porphyry project in northwestern Turkey. The PEA is based on a mineral resource estimate first presented on March 23, 2012.

    PEA highlights include:

    • Pre-tax NPV7% of $675 million, 26% IRR and 2.1 year payback ($1,200/oz gold, $2.90/lb copper);
    • After-tax NPV7% of $474 million, 20% IRR and 2.7 year payback ($1,200/oz gold, $2.90/lb copper);
    • Average life of mine (“LOM”) strip ratio of 1:1;
    • LOM payable production of 1.290 million ounces gold and 1.247 billion pounds copper;
    • Total project capital costs of $1.17 billion (including contingency of $200 million), with potential to reduce initial capital costs through contract mining or equipment leasing and project optimization through more advanced studies.
     Pilot Gold President and CEO Matt Lennox-King stated:

    The combination of higher grades that are mineable in the first three years, combined with Halilaga’s favourable infrastructure and location in a jurisdiction that is open to mine development, makes this a compelling development project. The PEA confirms our view that Halilaga has the potential to be a straightforward open pit mine, utilizing conventional milling and flotation concentration with robust economics.  While TV Tower and Kinsley continue to be our focus projects, the robust economics of Halilaga will provide Pilot Gold and our partner with a number of strategic options in the future.

    Click here to view the full press release.  

    strip-ratiotsx-plgpilot-gold
    The Conversation (0)

    Go Deeper

    AI Powered
    Puma Samples High Grade Outcrop at Its Flagship Triple Fault Gold Project, New Brunswick

    Puma Samples High Grade Outcrop at Its Flagship Triple Fault Gold Project, New Brunswick

    Nexus Gold Contracts Driller for McKenzie Gold Project, Red Lake, Ontario

    Latest News

    Outlook Reports

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
      • Electric Vehicles
    • Agriculture
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Energy
      • Uranium
      • Oil and Gas
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Robotics
      • Crypto
      • Cleantech
    Life Science
      • Biotech
      • Cannabis
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES