Cygnus Starts Trading on OTCQB Market

Cygnus Starts Trading on OTCQB Market

HIGHLIGHTS:

  • Cygnus' common shares have qualified to trade on the OTCQB ® Venture Market ("OTCQB"), a U.S. marketplace operated by OTC Markets Group Inc. (the "OTC"),
  • Trading commences today under the ticker "CYGGF"

Cygnus Metals Limited (ASX: CY5; TSXV: CYG; OTCQB: CYGGF) ("Cygnus" or the "Company") is pleased to announce that its common shares have qualified to trade on the OTCQB ® Venture Market ("OTCQB"), a U.S. marketplace operated by OTC Markets Group Inc. (the "OTC"), and will commence trading today under the symbol "CYGGF". The common shares of the Company will continue to trade on the ASX and TSX Venture Exchange.

Cygnus Executive Chair David Southam said   : "Given the strong outlook for copper, it is an ideal time to trade on the OTCQB. This will help to make the Company accessible to a growing range of U.S. investors and further increase liquidity and visibility in North America.  We have the potential to unlock substantial value with the high-grade resource already defined and the immense upside at the Chibougamau Copper-Gold Project. We have started an aggressive drilling and geophysics program focussed on achieving strong resource growth and testing new targets at a time when the world desperately wants more copper from tier-one locations".

Trading of Cygnus shares on the OTC imposes no additional compliance or regulatory standards over and above the Company's existing compliance requirements as an Australian incorporated entity listed on the Australian Securities Exchange and TSX Venture Exchange. OTC trading is non-dilutive to existing Cygnus shareholders, as no new shares are being issued to enable trading on the OTC.

About OTC Markets Group Inc.

OTC Markets Group Inc. (OTCQX: OTCM) operates the OTCQX ® Best Market, the OTCQB ® Venture Market and the Pink® Open Market for 11,000 U.S. and global securities. Through its regulated OTC Link ® Alternative Trading Systems, the company connects a diverse network of broker-dealers that provide liquidity and execution services. The OTC enables investors to easily trade through the broker of their choice and empowers companies to improve the quality of information available for their investors.

The OTCQB is recognized as an "established public market" by the U.S. Securities and Exchange Commission and is a leading market for U.S. and international companies in the entrepreneurial and development stage. To be eligible, companies must be current in their financial reporting, pass a minimum bid price test, and undergo an annual company verification and detailed certification process. The OTCQB quality standards are expected to provide increased transparency and more detail on market depth including greater disclosure of market makers as well as improved liquidity.  As a verified market with efficient access to U.S. investors, OTCQB helps companies build shareholder value with the goal of enhancing liquidity and achieving a fair valuation.

This announcement has been authorised for release by the Board of Directors of Cygnus.

David Southam
Executive Chair
T: +61 8 6118 1627
E: info@cygnusmetals.com
Ernest Mast
President & Managing Director
T: +1 647 921 0501
E: info@cygnusmetals.com
Media:
Paul Armstrong
Read Corporate
T: +61 8 9388 1474

About Cygnus Metals

Cygnus Metals Limited (ASX: CY5; TSXV: CYG; OTCQB: CYGGF) is a diversified critical minerals exploration and development company with projects in Quebec, Canada and Western Australia. The Company is dedicated to advancing its Chibougamau Copper-Gold Project in Quebec with an aggressive exploration program to drive resource growth and develop a hub-and-spoke operation model with its centralised processing facility. In addition, Cygnus has quality lithium assets with significant exploration upside in the world-class James Bay district in Quebec, and REE and base metal projects in Western Australia. The Cygnus team has a proven track record of turning exploration success into production enterprises and creating shareholder value.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

CYG:CC
Cygnus Metals

Cygnus Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Cygnus Metals

Cygnus Metals


Keep reading...Show less
Cygnus Metals Limited Clarification Announcement

Cygnus Metals Limited Clarification Announcement

-

Cygnus Metals Limited (ASX: CY5; TSXV: CYG) ("Cygnus" or the "Company") refers to its announcement titled "Cygnus increases highly prospective, under-explored ground position by 50%" released to ASX on 9 January 2025 ("First Announcement") and its announcement titled "Cygnus' first drill hole returns up to 9.1% Cu outside Resource" released to ASX on 23 January 2025 ("Second Announcement").

Clarifications regarding First Announcement

In discussions with the Company subsequent to the release of the First Announcement, the Australian Securities Exchange ("ASX") has requested the below:

  • Clarification regarding the assumptions used in the copper metal equivalents calculations provided by Cygnus on the NI 43-101 compliant Foreign Mineral Resource Estimate for the Chibougamau Project in the First Announcement; and
  • Further information regarding metallurgical test work completed to support the Company's metallurgical recovery assumptions provided in this clarification announcement.

The Company wishes to provide further information on these assumptions and the metallurgical test work previously completed by Doré Copper Mining Corp ("Doré"), but emphasises that the clarification does not affect the Foreign Mineral Resource Estimate or the Copper Equivalent ("CuEq") figures as set out in Appendix A of the First Announcement and as first disclosed by the Company on 15 October 2024.

Note 6 of Appendix A on page 6 of the First Announcement is replaced with the following ("First Clarification"):

"Metal equivalents for the foreign estimate have been calculated at a copper price of US$8,750/t, gold price of US$2,350/oz. Copper equivalent was calculated based on the formula CuEq(%) = Cu(%) + (Au(g/t) x 0.77258). Metallurgical recovery factors have been applied to the copper equivalents calculation, with copper metallurgical recovery assumed at 95% and gold metallurgical recovery assumed at 85% based upon historical production at the Chibougamau Processing Facility and more recent metallurgical test work. It is the Company's view that all elements in the copper equivalent calculations have a reasonable potential to be recovered and sold."

The Company confirms that the Foreign Mineral Resource Estimate and metal equivalents calculation do not contain any other metals, including silver. In fact, the inclusion of silver represents a further opportunity for the Company and will be reviewed in future work.

Other than the First Clarification above, there are no changes to the First Announcement.

In support of the First Clarification, attached to this announcement are the results of metallurgical test work previously completed by Doré.

Clarifications regarding Second Announcement

In discussions with the Company subsequent to the release of the Second Announcement, the ASX has requested that the Company provide further information regarding two of the three electromagnetic ("EM") plates referred to in Figures 1 and 2 of the Second Announcement in accordance with ASX Listing Rules 5.6 and 5.7.

The Company wishes to note that the two additional untested EM plates to the south of the new EM plate referred to in the Second Announcement were identified from geophysics programs conducted by previous owners of the Chibougamau Project and provides the additional information set out in the Appendix to this clarification announcement ("Second Clarification").

A fixed loop EM ("FLEM") survey was conducted in 2007 by Crone Geophysics for Novawest Resources. Results from this survey, which Southern Geoscience Consultants ("SGC") has reprocessed for Cygnus, highlighted a conductor to the south of the Corner Bay deposit. A downhole EM ("DHEM") survey was conducted by Doré in 2021 on drillhole CB-21-93. The survey, which SGC has reprocessed for Cygnus, highlighted a further conductor to the south of the Corner Bay deposit.

Other than the Second Clarification, there are no changes to the Second Announcement.

This announcement has been authorised for release by the Board of Directors of Cygnus.

David Southam
Managing Director
T: +61 8 6118 1627
E: info@cygnusmetals.com
Ernest Mast
President & Managing Director
T: +1 647 921 0501
E: info@cygnusmetals.com
Media:
Paul Armstrong
Read Corporate
+61 8 9388 1474


About Cygnus Metals

Cygnus Metals Limited (ASX: CY5, TSXV: CYG) is a diversified critical minerals exploration and development company with projects in Quebec, Canada and Western Australia. The Company is dedicated to advancing its Chibougamau Copper-Gold Project in Quebec with an aggressive exploration program to drive resource growth and develop a hub-and-spoke operation model with its centralised processing facility. In addition, Cygnus has quality lithium assets with significant exploration upside in the world-class James Bay district in Quebec, and REE and base metal projects in Western Australia. The Cygnus team has a proven track record of turning exploration success into production enterprises and creating shareholder value.

Qualified Persons and Compliance Statements

The scientific and technical information relating to metal equivalents in this news release has been reviewed and approved by Ms Laurence Huss, the Quebec In-Country Manager of Cygnus, a "qualified person" as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The Company first announced the foreign estimate of mineralisation for the Chibougamau Project on 15 October 2024. The Company confirms that the supporting information included in the announcement of 15 October 2024 continues to apply other than in respect of the Clarification, and (notwithstanding the Clarification) has not materially changed.

Cygnus confirms that (notwithstanding the Clarification) it is not aware of any new information or data that materially affects the information included in the original announcement and that all material assumptions and technical parameters underpinning the estimates in the original announcement continue to apply and have not materially changed. Cygnus confirms that it is not in possession of any new information or data that materially impacts on the reliability of the estimates or Cygnus' ability to verify the foreign estimates as mineral resources in accordance with the JORC Code. The Company confirms that the form and context in which the Competent Persons' findings are presented have not been materially modified from the original market announcement.

The scientific and technical information relating to exploration results in this news release has been reviewed and approved by Mr Louis Beaupre, the Quebec Exploration Manager of Cygnus, a "qualified person" as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The Exploration Results disclosed in this announcement are based on and fairly represent information and supporting documentation compiled by Mr Beaupre. Mr Beaupre holds options in Cygnus. Mr Beaupre is a member of the Ordre des ingenieurs du Quebec (P Eng), a Registered Overseas Professional Organisation as defined in the ASX Listing Rules, and has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration and to the activity which has been undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Beaupre consents to the inclusion in this release of the matters based on the information in the form and context in which they appear.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Appendix – Second Clarification

Section 1 (Sampling Techniques and Data) and Section 2 (Reporting of Exploration Results) of Appendix C (2012 JORC Table 1) of the Second Announcement are deleted and replaced as follows:

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling techniques



Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.
  • All current drilling conducted at the Chibougamau Project was completed under the supervision of a registered professional geologist as a Qualified Person (QP) who is responsible and accountable for the planning, execution, and supervision of all exploration activity as well as the implementation of quality assurance programs and reporting.
  • All drilling reported is NQ2 (47.8 mm diameter)
  • DHEM surveys have been completed on surface drillholes
  • Historic FLEM surveys were acquired from surface
  • Historic FLEM stations were planned along survey lines perpendicular to geological strike
Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.
  • All sample collection, core logging, and specific gravity determinations were completed by Cygnus Metals under the supervision of a professionally qualified registered geologist.
  • NQ core was marked for splitting during logging and is sawn using a diamond core saw with a mounted jig to assure the core is cut lengthwise into equal halves.
  • Half of the cut core is placed in clean individual plastic bags with the appropriate sample tag.
  • QA/QC is done in house by Cygnus Metals geologists with oversight from the Senior Geologist. The check samples (blanks and standards – 4% of total samples with another 2% of core duplicates taken on half split core) that were inserted into the sample batches are verified against their certified values and are deemed a pass if they are within 3 standard deviations of the certified value. The duplicates are evaluated against each other to determine mineralization distribution (nugget). If there are large discrepancies in the check samples, then the entire batch is requested to be re-assayed. The samples are then placed in bags for shipment to the offsite laboratory's facility.
  • The remaining half of the core is retained and incorporated into Cygnus's secure, core library located on the property
  • No samples were taken for the electromagnetic survey work.
Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard' work has been done this would be relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

  • Industry standard sampling practices were used with sample lengths ranging from 0.3 m to 1.0 m and respected geological contacts. Sample tags were placed at the beginning of each sample interval and the tag numbers were recorded in an MS Excel database.
  • Sampling practice is considered to be appropriate to the geology and style of mineralisation
Drilling techniques Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).
  • Diamond core was drilled using surface diamond rigs with industry recognised contractors Miikan Drilling. Miikan is a joint venture between Chibougamau Diamond Drilling Ltd., the First Nations community of Ouje-Bougoumou and the First Nations community of Mistissini both located in the Eeyou Istchee territory.
  • Drilling was conducted using NQ core size
  • Directional surveys have been taken at 50m intervals
Drill sample recovery Method of recording and assessing core and chip sample recoveries and results assessed.

Measures taken to maximise sample recovery and ensure representative nature of the samples.

Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

  • Diamond core recovery was measured for each run and calculated as a percentage of the drilled interval.
  • Overall, the core recoveries are excellent in the Chibougamau area
  • No drilling was undertaken for the electromagnetic survey work.
Logging



Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.
  • All core was geologically and geotechnically logged. Lithology, veining, alteration and mineralisation are recorded in multiple tables of the drillhole database
  • No logging was undertaken for the electromagnetic survey work.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.
  • Geological logging of core is qualitative and descriptive in nature.
The total length and percentage of the relevant intersections logged.
  • 100% of the core has been logged
Sub-sampling techniques and sample preparation If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

For all sample types, the nature, quality and appropriateness of the sample preparation technique.

Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

Measures taken to ensure that the sampling is representative of the in-situ material collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

  • The NQ2 diameter the core was sawn in half following a sample cutting line determined by geologists during logging and submitted for analysis on nominal 1m intervals or defined by geological boundaries determined by the logging geologist
  • Each core sample is assigned a tag with a unique identifying number. Sample lengths are typically one metre but can be depending on zone mineralogy and boundaries.
  • This sampling technique is industry standard and deemed appropriate.
  • No subsampling was undertaken for the electromagnetic survey work.
Quality of assay data and laboratory tests



The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.
  • Sample (NQ size half core) preparation and fire assay analysis were done at Bureau Veritas Commodities Canada Ltd ("BV") in Timmins, Ontario, and ICP-ES multi-elements analysis was done at BV in Vancouver, B.C.
  • Samples were weighed, dried, crushed to 70% passing 2 mm, split to 250 g, and pulverized to 85% passing 75 µm.
  • Samples are fire assayed for gold (Au) (30 g) and multi-acid digestion ICP-ES finish, for 23 elements (including key elements Ag, Cu, Mo).
  • Samples assaying >10.0 g/t Au are re-analysed with a gravimetric finish using a 30 g charge. Samples assaying >10% Cu are re-analysed with a sodium peroxide fusion with ICP-ES analysis using a 0.25 g charge.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.
  • CY5 commissioned Southern Geoscience Consultants (SGC) of Perth to supervise and plan the recent DHEM surveys that were acquired by Géophysique TMC
  • SGC were also commissioned to reinterpret some DHEM collected by Géophysique TMC from 2021
  • Survey Details for DHEM
    • Survey Configuration: Downhole TEM (DHTEM)
    • TX Loop Size: 620 x 450m
    • Transmitter: Crone Geophysics Pulse Transmitter
    • Receiver: Crone Geophysics Pulse Receiver
    • Sensor: Crone Geophysics 3 component dB/dt induction coil
    • Component Directions: Axial (A), and cross-hole (U and V)
    • Station Spacing: 10m with 5m infill
    • TX Frequency: 5 Hz
    • Duty cycle: 50%
    • Current: 20 Amps
    • Powerline Frequency: 60 Hz
    • Base frequency: 50 msec
    • Stacks: 256 stacks per reading
  • CY5 also commissioned SGC to reprocess the historic FLEM that was conducted in 2007 under the supervision of Crone Geophysics and Exploration Ltd
    • The equipment used on this project was a Crone Pulse EM Surface system. This includes a 4.8kW transmitter with a 240V voltage regulator powered by an 11 hp motor generator. The Crone Digital Receiver was used to collect the field data. The synchronization between the Transmitter and the Receiver was maintained by crystal clock synchronization for surface work
      • TX Loop Size: 900 x 800m
      • Ramp Time: 1.5ms
      • Current: 15 amps
      • Time Base: 16.66 msec
Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.
  • Laboratory QC procedures involve the use of internal certified reference material as assay standards, along with blanks, duplicates and replicates
  • Geophysical data was recorded on a Crone Geophysics Pulse Receiver then emailed to SGC for analysis and verification
Verification of sampling and assaying





The verification of significant intersections by either independent or alternative company personnel.
  • Verification of sampling was made by Cygnus Metals and other professional consultant geologists
  • No sampling was undertaken for the electromagnetic survey work.
The use of twinned holes.
  • No hole is twinned
Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.
  • All logging data was completed, core marked up, logging and sampling data was entered directly into the database.
  • The logged data is stored on the site server directly.
Discuss any adjustment to assay data.
  • There was no adjustment to the assay data
Location of data points



Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.
  • The location of the drillholes and the aiming points for the orientation of the drillholes were indicated on the ground using identified stakes. The stakes marking the location of the drillholes were set up and located with a Garmin GPS model "GPSmap 62s" (4m accuracy)
  • Surveys are collected using a Reflex EZ-Shot® single-shot electronic instrument with readings collected at intervals of approximately every 30 m downhole plus a reading at the bottom of the hole
  • Surface geophysical measurement locations were determined using a hand-held GPS. The accuracy of this unit at most sample sites was +/- 3m to 5m
  • The DHEM station positions are estimated using a winch counter that measures to the nearest cm accuracy with gyro survey files to accurately locate the survey stations in space.
  • FLEM stations were planned perpendicular to geological strike, and all were surveyed with hand-held GPS
Specification of the grid system used.
  • The grid system used is UTM NAD83 (Zone 18)
Quality and adequacy of topographic control.
  • A Digital Terrane Model (DTM) has been used to accurately plot the vertical position of the holes
Data spacing and distribution



Data spacing for reporting of Exploration Results.
  • The drill spacing is considered appropriate for this type of exploration
  • DHEM is 10m stations with 5m and 1m infill and FLEM data is 100m station spacing
  • The station spacings are considered to be sufficient for sampling the anomalous response for detailed quantitative modelling
Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

  • No resource estimation is made
Whether sample compositing has been applied.
  • No sample compositing has been applied
Orientation of data in relation to geological structure

Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.
  • Drilling is orientated approximately at right angles to the currently interpreted strike of the known interpreted mineralisation. Reported intersections appear close to true width
  • FLEM stations were planned perpendicular to geological strike
  • DHEM surveys records 3D data and target orientation relative to the survey orientation is not deemed to be important in the modelling
If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

  • No bias is considered to have been introduced by the existing sampling orientation
Sample security The measures taken to ensure sample security.
  • Core was placed in wooden core boxes close to the drill rig by the drilling contractor. The core was collected daily by the drilling contractor and delivered to the secure core logging facility. Access to the core logging facility is limited to Cygnus employees or designates
Audits or reviews The results of any audits or reviews of sampling techniques and data.
  • No audits have been undertaken, therefore information on audits or reviews is not yet available


Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code Explanation Commentary
Mineral tenement and land tenure status

Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.
  • The data reported within this announcement is from the Chibougamau Project. The Chibougamau project consists of 3 properties which includes:
    • Copper Rand (1 mining license, 19 mining concession and 147 exploration claims)
    • Corner Bay – Devlin (1 mining license, 111 exploration claims)
    • Joe Mann (2 mining concessions, 74 exploration claims)
  • Copper Rand and Corner Bay – Devlin are held 100% by CBAY minerals Inc, a wholly owned subsidiary of Dore Copper.
  • 767ha of the Joe Mann property is held by CBAY with the remaining 1965ha held under option agreement with Resources Jessie.
  • The properties collectively making up the Project are in good standing based on the Ministry of Energy and Natural Resources (Ministère de l'Énergie et des Ressources Naturelles) GESTIM claim management system of the Government of Québec.
The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.
  • All tenure is in good standing
Exploration done by other parties Acknowledgment and appraisal of exploration by other parties.
  • The Chibougamau Copper and Gold project comprising Corner Bay, Devlin, Cedar Bay and Joe Mann have seen an extensive exploration history dating back to the early 1900s. The PEA (as referred to in the Company's announcement of 15 October 2024) provides a detailed history of the exploration activities undertaken by previous explorers.
  • Corner Bay was first identified as a prospect in 1956
    • 1956 – 1972 eight drilling programs totalling 1,463 m and various geophysical and electromagnetic (EM) surveys
    • 1973 – 1981 Riocanex and Flanagan McAdam: ground geophysical surveys and 43 diamond drill holes
    • 1982 – 1984 Riocanex and Corner Bay Exploration: 38 drill holes and metallurgical test work
    • 1988 – 1991 Corner Bay Exploration: diamond drilling, geophysical surveys and geological characterisation with initial MRE
    • 1992 – 1994 SOQUEM optioned and acquired a 30% interest, and completed diamond drilling
    • 1994 Explorations Cache Inc and Ressources MSV Inc: diamond drilling
    • 2004 – 2006 GéoNova and MSV: 98 diamond drill holes and first Technical Report on the Corner Bay project reporting a MRE
    • 2007 – 2009 Campbell: diamond drilling and bulk sample
    • 2012 - 2019 CBAY / AmAuCu: diamond drilling and MRE
  • Devlin identified in 1972 by airborne survey flown by the MERN
    • 1979 – 1981 diamond drilling, geophysical surveys
    • 1981 development commenced
  • Joe Mann identified in 1950 with the commencement of mining activities occurring in 1956
    • The Joe Mann mine operated underground during three different periods from 1956 to 2007
    • In July 2012, Ressources Jessie acquired the Joe Mann mine property, but conducted only surface exploration work
  • Cedar Bay was discovered prior to 1927 by Chibougamau McKenzie Mines Ltd
    • From initial discovery to 2013 various surface and underground drilling campaigns and geophysical surveys undertaken by various companies
Geology Deposit type, geological setting and style of mineralisation.
  • Corner Bay and Devlin are located at the northeastern extremity of the Abitibi subprovince in the Superior province of the Canadian Shield and are examples of Chibougamau-type copper-gold deposits. The Abitibi subprovince is considered as one of the largest and best-preserved greenstone belts in the world and hosts numerous gold and base metal deposits.
  • The Corner Bay deposit is located on the southern flank of the Doré Lake Complex (DLC). It is hosted by a N 15° trending shear zone more or less continuous with a strong 75° to 85° dip towards the west. The host anorthosite rock is sheared and sericitized over widths of 2 m to 25 m. The deposit is cut by a diabase dyke and is limited to the north by a fault structure and to the south by the LaChib deformation zone.
  • The Corner Bay deposit consists of three main mineralized lodes (subparallel Main Lode 1 and Main Lode 2 above the dyke, and Main Lode below the dyke that make up the bulk of the deposit. The Corner Bay deposit has been traced over a strike length to over 1,100 m to a depth of 1,350 m and remains open at depth.
  • The mineralization is characterized by veins and/or lenses of massive to semi-massive sulphides associated with a brecciated to locally massive quartz-calcite material. The sulphide assemblage is composed of chalcopyrite, pyrite, and pyrrhotite with lesser amounts of molybdenite and sphalerite. Late remobilized quartz-chalcopyrite-pyrite veins occur in a wide halo around the main mineralization zones.
  • Devlin is a flat-lying, copper-rich lodes-hosted deposit in a polygenic igneous breccia that is less than 100 m from the surface. The tabular bodies have been modelled as four nearly horizontal lodes: a more continuous lower zone and three smaller lodes comprising the upper zone. Mineralization is reflected as a fracture zone often composed of two or more sulphide-quartz lodes and stringers. Thickness of the mineralized zones range from 0.5 m to 4.4 m. It has been diluted during modelling to reflect a minimum mining height of 1.8 m.
  • The Joe Mann deposit is characterized by east-west striking shear hosted lodes that extend beyond 1,000 m vertically with mineralization identified over a 3 km strike length. These shear zones form part of the Opawica-Guercheville deformation zone, a major deformation corridor cutting the mafic volcanic rocks of the Obatogamau Formation in the north part of the Caopatina Segment. The gabbro sill hosts the Main Zone and the West Zone at the mine, while the South Zone is found in the rhyolite. These three subvertical E-W (N275°/85°) ductile-brittle shear zones are sub-parallel to stratigraphy and to one another, with up to 140 m to 170 m of separation between them. These shear zones are hosted within a stratigraphic package composed of iron-magnesium (Fe-Mg) carbonate and sericite altered gabbro sills, sheared basalts, and intermediate to felsic tuffs intruded by various felsic intrusions. The Joe Mann gold mineralization is hosted by decimetre scale quartz-carbonate lodes (Dion and Guha 1988). The lodes are mineralized with pyrite, pyrrhotite, and chalcopyrite disposed in lens and lodelets parallel to schistosity, and occasionally visible gold. There are some other minor, mineralized structures, e.g., North and South-South Zones, with limited vertical and horizontal extensions.
Drill hole Information A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

  • easting and northing of the drill hole collar
  • elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar
  • dip and azimuth of the hole
  • down hole length and interception depth
  • hole length.
If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.
  • All requisite drillhole information is tabulated elsewhere in this release. Refer Appendix A of the body text.
  • The location of the DHEM and FLEM is set out in "Diagram" below.
Data aggregation methods



In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.
  • All drill hole intersections are reported above a lower cut-off grade of 0.5% copper.
Where aggregate intercepts incorporate short lengths of high-grade results and longer lengths of low-grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.
  • A maximum of 1m internal waste was allowed
The assumptions used for any reporting of metal equivalent values should be clearly stated.
  • No metal equivalents reported
Relationship between mineralisation widths and intercept lengths These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg ‘down hole length, true width not known').
  • All intersections reported in the body of this release are down hole.
  • The majority of the drill holes in the database are drilled as close to orthogonal to the plane of the mineralized lodes as possible.
  • Only down hole lengths are reported.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.
  • For Drill Results included elsewhere in this release refer figures in the body text
  • Image 1 below shows DHEM loop on CB-24-100
  • Image 2 below shows DHEM loop on CB-21-93 (red outline illustrates the EM loop and white line the location of drillhole CB-21-93)
  • Image 3 below illustrating loop and planned survey lines from 2007 FLEM (blues lines illustrate the planned survey lines for the anomaly outlined in the announcement)
Balanced reporting Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.
  • All results greater than 0.5% Cu and 0.5g/t Au have been reported at greater than 1m width
Other substantive exploration data Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.
  • Appropriate plans are included in the body of this release.
Further work The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.
  • The Company will be conducting drill testing of additional mineralisation as well as step out drilling of existing lodes to further enhance the resources quoted in this release. More information is presented in the body of this report.
  • Diagrams in the main body of this release show areas of possible resource extension on existing lodes. The company continues to identify and assess multiple other target areas within the property boundary for additional resources.


Image 1 below shows DHEM loop on CB-24-100

DHEM Loop CB-24-100

Image 2 below shows DHEM loop on CB-21-93 (red outline illustrates the EM loop and white line the location of drillhole CB-21-93)

DHEM loop on CB-21-93

Image 3 below illustrating loop and planned survey lines from 2007 FLEM (blues lines illustrate the planned survey lines for the anomaly outlined in the announcement)

Planned survey lines


Chibougamau Copper-Gold Project, Canada

Flotation copper recoveries of
up to 98.2% at Corner Bay

Metallurgical test work conducted at the Chibougamau Project indicates a high-quality clean concentrate with low impurities from the Corner Bay flagship asset

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Cygnus' first drill hole returns up to 9.1% Cu outside Resource

Cygnus' first drill hole returns up to 9.1% Cu outside Resource

The outstanding intersection of   7.3m at 4.2%   Cu reveals a potential new lode ~250m from the main deposit; Follow-up downhole EM identifies a large off-hole conductor; Two diamond drill rigs currently on site

HIGHLIGHTS:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Cygnus Metals Ltd.  Opens the Market

Cygnus Metals Ltd. Opens the Market

Ernest Mast, President and Managing Director, Cygnus Metals Ltd. (TSXV: CYG) ("Cygnus Metals" or the "Company"), and his team, joined Robert Peterman, Chief Commercial Officer, Toronto Stock Exchange (TSX), to open the market to celebrate the Company's new listing on TSX Venture Exchange.

Cygnus Metals Limited (TSXV: CYG) (ASX: CY5) is a diversified critical minerals exploration and development company with projects in Quebec, Canada and Western Australia. The Company is dedicated to advancing its Chibougamau Copper-Gold Project in Quebec with an aggressive exploration program to drive resource growth and develop a hub-and-spoke operation model with its centralised processing facility. In addition, Cygnus has quality lithium assets with significant exploration upside in the world-class James Bay district in Quebec, and REE and base metal projects in Western Australia. The Cygnus team has a proven track record of turning exploration success into production enterprises and creating shareholder value.

MEDIA CONTACT:
Laurie Gaborit
Advisor, Investor Relations
lgaborit@cygnusmetals.com
416.219.2049

Paul Armstrong
Read Corporate
+61 8 9388 1474

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/236970

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
WESTERN COPPER AND GOLD PROVIDES POSITIVE METALLURGICAL UPDATE

WESTERN COPPER AND GOLD PROVIDES POSITIVE METALLURGICAL UPDATE

western copper and gold corporation ("Western" or the "Company") (TSX: WRN) (NYSE American: WRN) is pleased to announce results from a supplemental metallurgical program (the "Metallurgical Program") for its wholly owned Casino Copper-Gold Project (" Casino ").

Western Copper and Gold Corporation Logo (CNW Group/Western Copper and Gold Corporation)

The Metallurgical Program used drill core composites of material representing potential mill feed taken from the 2023 diamond drilling program with more variable copper, gold, and molybdenum levels than had been tested in previous drill campaigns and from a broader period of planned mining.

Attractive Recoveries – Standard processing methods continue to produce good recoveries for copper and gold, consistent with previous metallurgical work. The program achieved significantly higher recoveries for molybdenum (approximately 90% in hypogene material versus overall 71% in the Feasibility Study).

High Grade Concentrates with Low Impurities Casino would produce a high gold grade copper concentrate and a separate molybdenum concentrate. Both are expected to be highly marketable given the very low levels of impurities.

Further Potential Upside – Primary grind size for Casino is expected to be 210μm which compares quite favorably versus other similar projects.  Initial coarse particle separation tests, conducted during this program, suggest an opportunity to further increase primary grind size without sacrificing recoveries.

"The latest metallurgical testing complements the work released in 2023 and now creates a fairly comprehensive picture of the attractive recoveries and metallurgical characteristics of the Casino Project. The project has the ability to produce highly sought after, high-grade concentrates into a market experiencing significant tightness, especially for cleaner concentrates such as those from Casino ." said Sandeep Singh , President and CEO.

Metallurgical Program

The outline of the Metallurgical Program and the review of the results were developed by Western's Technical and Sustainability Committee, which is comprised of members from Western, Rio Tinto and Mitsubishi Materials.

The fifteen composites of approximately 200 kg were subjected to detailed mineralogy, comminution testing, flotation testing and detailed analysis of copper concentrates. Composite preparation and all metallurgical test work was completed at ALS Metallurgy in Kamloops, B.C.

Table 1 shows the analysis of the composites and their associated lithology, either Supergene Sulphide (SUS) or Hypogene (HYP). The target composition was achieved for all composites except Composite 14, which contained very low grades and was subject to limited testing. Composite 8 was also excluded from the results below, as it was intentionally selected as an outlier to maximize deleterious content.

Casino has two main copper-gold zones, the Supergene Sulphide Zone which represents about 25% of the resource and the Hypogene Zone, which represents about 70% of the resource. The remaining 5% of the resource is represented by oxide materials.

Table 1 – Composites Used in Metallurgical Program

Composite

Zone

Cu

Cu (WAS) 1

Au

Mo

( %)

( %)

(g/t)

( %)

1

SUS

0.26

0.023

0.40

0.015

2

HYP

0.10

0.001

0.12

0.002

3

SUS

0.29

0.016

0.38

0.018

4

HYP

0.26

0.005

0.35

0.021

5

HYP

0.17

0.003

0.20

0.013

6

HYP

0.12

0.002

0.13

0.008

7

SUS

0.25

0.025

0.25

0.005

8

HYP

0.25

0.003

0.31

0.013

9

HYP

0.24

0.003

0.34

0.027

10

HYP

0.16

0.003

0.18

0.015

11

SUS

0.29

0.036

0.17

0.029

12

SUS

0.37

0.046

0.44

0.029

13

SUS

0.31

0.071

0.40

0.011

14

HYP

0.06

0.004

0.08

0.009

15

SUS

0.22

0.025

0.16

0.004


1 Cu (WAS) is the percentage of copper in the composite determined by weak acid soluble copper analysis

Flotation Test Results

Casino proposes using flotation to produce saleable copper-gold and molybdenum concentrates using an industry standard process flowsheet. Gold values are expected to be recovered within a copper concentrate and be payable under typical copper concentrate smelting terms and molybdenum is separated from a bulk copper-molybdenum concentrate to produce separate copper and molybdenum concentrates.

Table 2 depicts metallurgical recoveries obtained for hypogene composites using locked cycle testing. Hypogene samples demonstrate consistently high copper recoveries and very good quality copper concentrates. An average molybdenum recovery to a bulk copper-molybdenum concentrate of 90%, significantly higher than previous testing, was achieved for the hypogene composites without including Composite 2, which had a very low molybdenum head grade.

Table 2 – Summary of Locked-Cycle Flotation Results for Hypogene Composite Samples

Composite

Copper Concentrate Grade

Recoveries to Concentrate

Cu (%)

Au (g/t)

Cu (%)

Mo (%)

Au (%)

2

24.4

16.1

85.5

54.3

53.7

4

27.7

27.3

87.8

90.2

63.2

5

26.2

21.7

86.9

90.9

61.7

6

26.9

20.0

87.5

84.9

60.7

9

28.2

27.2

88.8

94.5

63.0

10

26.5

23.3

82.9

89.9

53.3

Table 3 shows locked cycle test results for supergene sulphide samples. Copper concentrate grade does not appear to be significantly impacted when processing supergene sulphide weathered materials. The reduction in overall copper recovery in flotation is a function of the weak acid soluble copper content (shown in Table 1) and is in line with previous test work. Molybdenum and gold recoveries are similar to previous test work.

Table 3 – Summary of Locked-Cycle Flotation Results for Supergene Sulphide Composite Samples

Composite

Copper Concentrate Grade

Recoveries to Concentrate

Cu (%)

Au (g/t)

Cu (%)

Mo (%)

Au (%)

1

26.7

32.2

76.5

74.2

58.8

3

28.8

32.8

77.0

85.3

59.6

7

19.3

13.5

83.4

74.3

62.5

11

27.6

13.5

79.6

76.4

57.6

12

27.7

26.2

87.0

86.7

62.9

13

18.1

17.8

73.6

86.4

58.6

15

27.4

20.9

71.0

34.4

58.6

Copper Concentrate Quality

The flotation concentrates produced from Casino continue to demonstrate very good grades in terms of copper and gold, as well as low levels of potential penalty elements. Table 4 shows a summary of copper concentrates produced from the recent test work, including key elements relevant to smelter terms. Average values for penalty elements, including As, Sb, Hg and F are shown to be well below typical smelter contract terms.

Table 4 – Casino Concentrate Analysis

Composite

Copper Concentrate Grades

Smelter Sensitive Elements

Cu (%)

Au (g/t)

As (%)

Sb (%)

Hg (g/t)

F (g/t)

1

26.7

32.2

0.01

0.00

0.33

50

2

20.3

13.6

0.17

0.09

0.12

140

3

28.8

32.8

0.02

0.00

0.04

70

4

29.1

26.5

0.01

0.00

0.02

60

5

29.7

22.3

0.01

0.00

0.02

60

6

29.4

18.7

0.03

0.01

0.03

60

7

19.3

13.5

0.20

0.06

0.59

70

9

30.1

28.7

0.34

0.09

0.13

90

10

26.2

22.1

0.07

0.17

0.23

90

11

27.6

13.5

0.01

0.00

0.23

70

12

27.7

26.2

0.18

0.11

0.47

100

13

18.1

17.8

0.03

0.01

0.27

70

15

27.4

20.9

0.18

0.05

0.86

290

Coarse Particle Separation Testing

A hypogene master composite was prepared for coarse particle flotation to test the impact on recoveries while increasing the primary grind size. In a single test, the grind size was increased from the project baseline of 210μm to 292μm with no significant change in overall copper and gold recoveries, and a small reduction in molybdenum recovery. The initial testing was promising and warrants future testing and evaluation.

Qualified Persons

The metallurgical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 Standards of Disclosures for Minerals Projects of the Canadian Securities Administrators ("NI 43-101") and supervised, reviewed, and verified by Jeffrey B. Austin , P.Eng., President of International Metallurgical and Environmental Inc., a "Qualified Person" as defined by NI 43-101.

ABOUT western copper and gold corporation

western copper and gold corporation is developing the Casino Project, Canada's premier copper-gold mine in the Yukon Territory and one of the most economic greenfield copper-gold mining projects in the world.  For more information, visit www.westerncopperandgold.com .

The Company is committed to working collaboratively with our First Nations and local communities to progress the Casino project, using internationally recognized responsible mining technologies and practices.

On behalf of the board,

"Sandeep Singh"

Sandeep Singh
President and CEO
western copper and gold corporation

Cautionary Note Regarding Forward-Looking Statements

This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian and United States securities legislation including the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements are made as of the date of this news release. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "plans", "projects", "intends", "estimates", "envisages", "potential", "possible", "strategy", "goals", "opportunities", "objectives", or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions. Such forward-looking statements herein include statements regarding the expected metallurgical performance, the marketability of the concentrates, the potential for further process optimization through grind size adjustments, and the broader market outlook for copper and molybdenum concentrates. These statements are based on current test results and interpretations, which may evolve as further metallurgical work is conducted.

Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual events to be materially different from those expressed or implied by such statements. Such factors include but are not limited to the risk of unforeseen challenges in advancing the Casino project, potential impacts on operational continuity, changes in general market conditions that could affect the Company's performance; and other risks and uncertainties disclosed in the Company's annual information form and Form 40-F for the most recently completed financial year and its other publicly filed disclosure documents.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to current metallurgical test results being representative of future recoveries, the availability of market demand for copper and molybdenum concentrates, and such other assumptions and factors as set out herein, and in the Company's annual information form and Form 40-F for the most recently completed financial year and its other publicly filed disclosure document.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, other factors may cause results to be materially different from those anticipated, described, estimated, assessed or intended. These forward-looking statements represent the Company's views as of the date of this news release. There can be no assurance that any forward-looking statements will be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not intend to and does not assume any obligation to update forward-looking statements other than as required by applicable law.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/western-copper-and-gold-provides-positive-metallurgical-update-302376534.html

SOURCE western copper and gold corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/February2025/13/c4898.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Yalgoo - Remorse Metallurgical Testing Commences

Yalgoo - Remorse Metallurgical Testing Commences

Tempest Minerals (TEM:AU) has announced Yalgoo - Remorse Metallurgical Testing Commences


Keep reading...Show less
Silver47 Identifies Critical Minerals Antimony and Gallium Potential in Addition to the High-Grade Silver-Gold-Zinc at the Red Mountain Project, Alaska

Silver47 Identifies Critical Minerals Antimony and Gallium Potential in Addition to the High-Grade Silver-Gold-Zinc at the Red Mountain Project, Alaska

Silver47 Exploration Corp. (TSXV: AGA) ("Silver47" or the "Company), has identified anomalous concentrations of several elements listed by both the United States and Canada as 'critical metals.' Following the 2024 drill program, a full review of historic and recent drill assays was undertaken with a focus on critical mineral potential. In addition to the high-grade zinc-silver-gold-lead-copper defined in the inferred resource, elevated amounts antimony (Sb), gallium (Ga), niobium (Nb), and vanadium (V) were found to occur within the Dry Creek (DC) and West Tundra Flats (WTF) resource zones.

Highlights

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Anteros Initiates Critical Mineral Deposit Modelling at Their Havens Steady VMS Property in Newfoundland

Anteros Initiates Critical Mineral Deposit Modelling at Their Havens Steady VMS Property in Newfoundland

Anteros Metals Inc. (CSE: ANT) ("Anteros" or the "Company") is pleased to announce commencement of inaugural 3D modeling at its 100%-owned critical-mineral-bearing Havens Steady Property (the "Property"). The Property boasts a road-accessible Volcanogenic Massive Sulphide ("VMS") lead-zinc-silver ±copper-gold deposit, is close to hydroelectric power, and is located in an established mining district in south-central Newfoundland. Modelling of recently-digitized historical data will allow for effective targeting of zone extensions and the identification of wider and higher-grade zones, including areas of copper-gold enrichment. Follow-up exploration is scheduled for late spring and early summer 2025.

PROPERTY HIGHLIGHTS

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Awalé Completes Geophysics and Commences Drilling at the 100%-Owned Fremen Target

Awalé Completes Geophysics and Commences Drilling at the 100%-Owned Fremen Target

HIGHLIGHTS

  • Completed a 50-line-kilometre IP geophysics survey covering over 5km of the 100%-owned Fremen target.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Cygnus Metals

Cygnus Metals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×