GTI Resources

Acquisition of Significant New Wyoming ISR Uranium Project & $5m Placement

GTI Resources Ltd(Gil or Company) is pleased to advise that it has entered into a binding term sheet agreement (Term Sheet) to acquire 100% of Logray Minerals Pty Ltd (Logray) (Acquisition), holder of -13,800 acres (-5,600 hectares) of underexplored mineral lode claims (Claims), abutting Rio Tinto's properties & adjacent to GTI's existing Great Divide Basin (GDB) projects, at Green Mountain in Wyoming, USA (the Properties).


Highlights:

  • Strategic acquisition of -13,800 acres of contiguous ISR uranium exploration claims abutting Rio Tinto's claims at Green Mountain WY, increases GTI land to -35,000 acres
  • Properties lie close to existing GTI claims, & adjacent to Energy Fuel's 30M1b1 Sheep
  • Mountain, Rio Tinto's Jackpot 2, Ur-Energy's Lost Soldier & UEC's Antelope deposits
  • GTI has material holdings in the district with plans to explore multiple roll fronts
  • $5m Placement to fund acquisition & accelerate Wyoming ISR strategy
  • New funds enable increased drilling on roll fronts in proximity to major U308 deposits
  • Recent drill program success & understanding of the conditions for successful ISR recovery in the GDB positions GTI to capitalise on the burgeoning uranium market

Historical Kerr McGee drill data and oil-well exploration drill logs confirm the presence of roll fronts & the Battle Springs formation which hosts neighbouring major uranium deposits. The Properties are located in close proximity to Energy Fuel's (EFR) 30M1b4 Sheep Mountain deposit (Indicated), Ur-Energy's (URE) Lost Soldier ISR deposit, UEC's (UEC) Antelope deposit and they abut Rio Tinto's (RIO) which hold the Big Eagle (past producing), Jackpot3, Desert View, Phase II, & Willow Creek deposits (Figure 1). The Claims lie south of Green Mountain, "5kms from GTI's existing Odin claim group & within 15km of GTI's Thor project where a successful maiden drill program was completed during May 2022.


Click here for the full ASX Release

This article includes content from GTI Resources Ltd, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

GTR:AU
GTI Energy

GTI Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
GTI Energy

GTI Energy


Keep reading...Show less
uranium news

Rigs Secured For Wyoming Uranium Drilling & Utah Fieldwork Completed

GTI Resources Ltd (GTI or Company) is pleased to advise that 2 mud rotary drill rigs have been secured for its planned drilling campaign at the Thor ISR uranium project in Wyoming’s Great Divide basin (Figure 1). As previously advised, GTI is on track to commence drilling during December. This maiden drill program is designed to confirm the grade and tenor of uranium mineralisation that was previously identified by Kerr McGee in the 1970’s & 80’s and to ultimately support definition of an economic uranium resource.

Figure 1. Thor Project Uranium Drilling Location Map, Great Divide Basin, Wyoming USA

Keep reading...Show less
C29 Metals

New Tenements Approved to Commence Geological Works

C29 Metals receives Category 4 exploration works approval for the new southern & northern tenements, strong local support, and a Social Support Agreement signed. Drilling Permit received for Ulytau Uranium project area.

C29 Metals Limited (“C29” or the “Company”) is pleased to announce that it has received Category four (4) exploration approval enabling the immediate commencement of tenement wide, geophysical, field mapping and soil sampling programs at its newly granted southern and northern tenements.

Keep reading...Show less
GTI Energy

Activity Update

GTI Energy Ltd (GTI or Company) is pleased to provide the following activity update. The anticipated Mineral Resource Estimate (MRE) and Exploration Target (ET) updates for GTI’s Lo Herma ISR uranium project (Lo Herma) in Wyoming’s Powder River Basin remains on track to be delivered by year end. A decision will then be made on commencing an Interim Scoping Study for the project.

Keep reading...Show less

Cameco Reports Document Filings

All amounts in Canadian dollars unless specified otherwise

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

NexGen Announces Best Hole to Date and High-Grade Expansion at Patterson Corridor East Concluding a Successful 2024 Drilling Program

  • NexGen's 2024 exploration campaign delivered a new discovery on Rook I at Patterson Corridor East ("PCE") 3.5km east of Arrow.
  • Subsequent drilling has materially expanded the mineralized zone to 600 m strike length and 600 m vertical extent with 19 of 30 holes intersecting mineralization including 10 holes with multiple intervals >10,000 cps.
  • Today's announcement highlights the best hole to date at PCE (RK-24-222) returns 17.0 m wide vein with multiple high intensity (>61,000 cps) occurrences.
  • In 2024, PCE is the largest drill program in the Athabasca Basin by any Company at 34,000 meters (m).

NexGen Energy Ltd. ("NexGen" or the "Company") (TSX: NXE) (NYSE: NXE) (ASX: NXG) is proud to announce the completion of its 2024 drilling campaign at Patterson Corridor East (PCE) that included more than 34,000 m across a total of 46 drillholes. Upon initial discovery of intense uranium mineralization at PCE ( see March 11 News Release ), the Company directed all drilling activity to focus exclusively on PCE, whereby 19 of 30 holes intersected mineralization. Bold and systematic spacing of drillhole intercepts have quickly grown the discovery from a single hole to a broad and continuous new uranium discovery. Real-time evaluation of results throughout the duration of the program focused on determining the overall outer extents of the mineralized zone and in parallel, precisely targeting high-grade sub-domains (Figures 1 and 2, Table 1).

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
AuKing Mining (ASX:AKN)

AuKing Mining


Keep reading...Show less
Cameco logo surrounded by US dollars.

Cameco Raises 2024 Uranium Production Guidance, Boosts Dividend in Q3 Results

Major uranium producer Cameco (TSX:CCO,NYSE:CCJ) shared its third quarter results on Thursday (November 7), reporting a strong performance despite production setbacks at its Kazakhstan operations.

The company reported uranium production of 4.3 million pounds, up 43 percent from the year-ago period. Sales volumes came in at 7.3 million pounds, relatively flat from 7 million pounds in Q3 2023.

Revenue stood at $721 million, a 75 percent increase year-on-year. Cameco's net earnings attributable to shareholders were $7 million, a decrease of 95 percent from the $148 million seen 12 months ago.

Keep reading...Show less
GTI Energy

GTI Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×