ACME Lithium Advances Lithium Discovery With Additional Lab Results From Test Well TW-1 at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Advances Lithium Discovery With Additional Lab Results From Test Well TW-1 at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") announced today results from the recently completed Dissolved Mineral Resource Exploration (DMRE) test well TW-1 as part of the Phase 2 expanded drill program at ACME's Clayton Valley Nevada lithium brine project.

The results indicate a total lithium concentration of 110 mg/L was present in fluids airlifted from approximately 496 feet of perforated casing crossing the Lower Gravel Unit (LGU). The adjacent operator's property, contiguous to ACME's project area, has a reported cut off grade of 50 mg/l.

The LGU extends from approximately 1250 to 1820 feet below ground surface (bgs) at the test well location. The perforated casing of TW-1 captures just under 500 feet of the LGU which is a targeted high concentration lithium brine aquifer. The well was developed using airlifting to remove latent drilling fluids from the wellbore. Water quality parameters including total dissolved solids, electrical conductivity, temperature, and pH values were recorded in the field by direct measurement with a Myron L Company Ultrameter II 6PFC water meter. A water quality sample was collected near the end of the well development activity when field parameters had stabilized in accordance with accepted practices.

As announced in August 2022, the LGU presented some of the highest lithium values, up to 130 mg/L in brine samples collected in ACME's Phase 1 program which was completed in July 2022. The LGU presents a deep, laterally expansive aquifer, which overlies bedrock throughout a significant portion of Clayton Valley.

The sample result provides a preliminary indication of the composite concentration of lithium in the brines across the LGU at the TW-1 location. Brine samples collected from DH-1 and DH-1A show strong potential stratification of waters in multiple aquifers down to the contact with bedrock. The preliminary data provides further evidence that some of the highest concentrations of lithium are contained in the LGU at the TW-1 drill location. The laboratory analysis of the airlift development fluid further validates previous evidence of a lithium brine deposit contained in the LGU and as indicated by other operators to be a potential production aquifer within Clayton Valley. Lithium analysis from the sample collected was completed by Western Environmental Testing Laboratory in Sparks, Nevada using ICPMS-EPA approved methods.

TW-1 will be prepared for an upcoming permitted pumping test from which hydraulic properties and brine chemistry of the LGU will be further assessed. The assessment will examine the potential extractability and average lithium concentration of the brine in the LGU at TW-The results of the TW-1 pumping test and response propagated to the DH-1A-grouted in vibrating wire piezometers, will be used to assess the potential volume of lithium brine in the LGU that could be extracted through pumping. The assessment of extractable brine volume and concentration of lithium in the brine will be used to infer if a lithium resource potentially exists at the ACME project.

William Feyerabend, Certified Professional Geologist and Mathew Banta, Certified Professional Hydrogeologist are qualified persons as defined by NI 43-101 and have supervised the preparation of the scientific and technical information that forms the basis for this news release.

About ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba, and at Bailey Lake in northern Saskatchewan.

On behalf of the Board of Directors

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

For Investor Inquiries
Anthony Simone
Simone Capital
Telephone: (416) 818-5154
asimone@simonecapital.ca

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/171246

News Provided by Newsfile via QuoteMedia

ACME:CC
The Conversation (0)
ACME Lithium Starts Exploration Program at Bailey Lake Pegmatite Discovery Area in Saskatchewan Canada

ACME Lithium Starts Exploration Program at Bailey Lake Pegmatite Discovery Area in Saskatchewan Canada

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to announce that it has commenced a summer exploration program at its Bailey Lake pegmatite discovery area in northeastern Saskatchewan.

Starting August 21st, 2023, ACME will be conducting a 3-in-1 Airborne Geophysical Survey on the Bailey Lake Property which will include Helicopter-borne Tri-axial Gradiometer Magnetics, Radiometrics, and LiDAR (Light Detection and Ranging) to identify regional structural trends and localized controls of pegmatite bodies and other key information to aid in future drill targeting.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Successfully Completes 10-Day Pumping Test at Clayton Valley Lithium Brine Project

ACME Lithium Successfully Completes 10-Day Pumping Test at Clayton Valley Lithium Brine Project

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to report that the Company has successfully completed a 10-day pumping test at test well TW-1 located in Clayton Valley, Nevada. The data generated during the test will be used to estimate the transmissivity and the storativity of the Lower Gravel Unit (LGU) at the TW-1 location. Preliminary Phase 1 and Phase 2 data suggest the perforated casing of TW-1 captures approximately 500 feet of potential lithium brine aquifer hosted in the LGU. The LGU is the basal gravel overlaying bedrock in Clayton Valley.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7776/177491_a3fcc31ed4de6886_002.jpg

Figure 1: Lithium Brine Samples, Clayton Valley Nevada

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Clarifies Technical Report Disclosure

ACME Lithium Clarifies Technical Report Disclosure

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME"). As a result of a review by the British Columbia Securities Commission, the Company is issuing the following news release to clarify its disclosure. By news release dated June 19, 2023, the Company announced it had filed a technical report titled "NI 43-101 Technical Report Update on the Fish Lake Valley Lithium Claystone Property, Esmeralda County, Nevada USA" (the "Technical Report"). Both the news release and the Technical Report stated that the author of the report, William Feyerabend, was an independent consultant.

Mr. Feyerabend is and was as of the date of the Technical Report, a paid consultant of the Company acting in the role of VP Exploration in the United States. As such, Mr. Feyerabend was not independent of the Company and the report should not have stated as such.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Commences TW-1 Pumping Test at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Commences TW-1 Pumping Test at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to report that the Company has commenced pumping test activities at test well TW-1 at its Clayton Valley Nevada lithium brine project. The well is the only permitted deep well known to currently exist in the northern portion of Clayton Valley.

Data generated from the pumping test will be used to assess hydraulic properties, brine chemistry of the Lower Gravel Unit (LGU) aquifer and to examine the potential concentration and extractability of economic lithium brine in the LGU.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Announces Results from Phase 1 Winter Drilling Program at Shatford Lake Manitoba

ACME Lithium Announces Results from Phase 1 Winter Drilling Program at Shatford Lake Manitoba

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") announced today drill core sample results from its 2023 winter drill program at its 100% owned Shatford Lake and Birse Lake lithium projects in southeastern Manitoba, Canada. ACME's Shatford-Birse claim area are contiguous to the south of Sinomine's world-class Tanco Mine, a Lithium, Cesium and Tantalum producer (LCTs) since 1969.

Core drilling was based on geological prospecting/mapping with lithium determinations by LIBS and geophysical magnetic interpretation. Drilling and magnetic interpretation was successful in defining broad structural belts with multiple unexposed pegmatites and specific cross structural features in these broad belts that control pegmatite injection. Recent results from this maiden drilling program at Shatford Lake will help the Company vector in the fertile pegmatite zones. Twenty-six pegmatites were intersected in 6 of 8 drill holes.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Australian Projects - Warrego East, Manindi, Drill Updates

Australian Projects - Warrego East, Manindi, Drill Updates

Metals Australia (MLS:AU) has announced Australian Projects - Warrego East, Manindi, Drill Updates

Download the PDF here.

SAGA Metals Geophysics Program Advances Drill-Ready Targets at Radar Titanium-Vanadium Project and Engages Market Maker

SAGA Metals Geophysics Program Advances Drill-Ready Targets at Radar Titanium-Vanadium Project and Engages Market Maker

Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H), a North American exploration company focused on critical mineral discovery in North America, is pleased to announce the completion of a targeted geophysics program over the Hawkeye Zone at the Radar Titanium-Vanadium (Ti-V) project.

Key Geophysics Highlights

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Grande Portage Resources (TSXV:GPG;OTCQB:GPTRF)

Grande Portage Completes Non-Brokered Private Placement

Not for distribution to United States newswire services or for dissemination in the United States.

Grande Portage Resources Ltd. (TSXV:GPG)(OTCQB:GPTRF)(FSE:GPB) ("Grande Portage" or the "Company") announces that after consultation with its registered finders, the Company has now concluded its non-brokered private placement under Part 5A of National Instrument 45-106 - Prospectus Exemptions - Listed Issuer Financing Exemption. As previously announced on November 13, 2024, the Company sold 3,470,000 units (each, a "Unit") at a price of C$0.30 per Unit for aggregate gross proceeds of C$1,041,000 (the "Offering"). The Company had filed an offering document related to the Offering that can be accessed under Grande Portage's profile at www.sedarplus.ca and on the Company's website at https:grandeportage.com

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Significant Milestone Achieved in Development Journey with The Completion of The "first phase" of the Environmental Impact Assessment Procedure for Rajapalot Gold-Cobalt Project

Significant Milestone Achieved in Development Journey with The Completion of The "first phase" of the Environmental Impact Assessment Procedure for Rajapalot Gold-Cobalt Project

Mawson Finland Limited ("Mawson" or the "Company") (TSX-V:MFL) is pleased to announcethe completion of the "first phase" ("EIA Program") of the Environmental Impact Assessment procedure for the Rajapalot Project (the "Project") in northern Finland. The EIA procedure is a requirement for obtaining a mining permit

Highlights:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×