Two of the Widest Silver Intersections to Date at Shallow Depths: 47 Metres at 68.2 g/t Silver  and 37 Metres at 86.3 g/t Silver

Two of the Widest Silver Intersections to Date at Shallow Depths: 47 Metres at 68.2 g/t Silver and 37 Metres at 86.3 g/t Silver

Prince Silver Corp. (CSE: PRNC,OTC:PRNCF) (OTCQX: PRNCF) (FSE: T130) ("Prince Silver" or the "Company") is pleased to report results from nine reverse circulation ("RC") drill holes at its Prince Silver Project in Nevada, highlighted by two near-surface intersections hosting the broadest polymetallic mineralization delivered by the Company's ongoing drill program to date.

Drill holes PRC-59 and PRC-60 intersected 47.24 metres at 68.17 g/t Ag (119.13 g/t AgEq) and 36.58 metres at 86.30 g/t Ag (146.27 g/t AgEq), respectively, within the Lyndon Limestone near historical mine workings. The results underscore the scale and continuity of mineralization at the Prince Silver Project and further demonstrate the potential for significant mineralization beyond the historical workings.

Prince Silver: Two of the Widest Silver Intersections to Date" youtube.com

The latest drilling continues to intersect substantial silver-polymetallic mineralization across multiple prospective horizons, including the Lyndon Limestone, Pioche Shales and Combined Metals Bed. These results add important current drill data to the Company's geological model as Prince Silver advances toward a maiden mineral resource estimate.

New Drilling Highlights

PRC-59:

  • 47.24 metres at 68.17 g/t Ag (119.13 g/t AgEq), 9.57% Mn, 2.40% Zn, 1.95% Pb and 0.26 g/t Au from 62.48 m downhole.
  • 6.10 metres at 142.50 g/t Ag (208.28 g/t AgEq), 10.95% Mn, 4.05% Zn, 3.01% Pb and 0.22 g/t Au in the shallower Chisholm Shale.

PRC-60:

  • 36.58 metres at 86.30 g/t Ag (146.27 g/t AgEq), 9.46% Mn, 3.08% Zn, 2.20% Pb and 0.28 g/t Au from 64.01 m downhole.
  • 16.76 metres at 85.98 g/t Ag (115.69 g/t AgEq), 5.61% Mn, 1.50% Zn, 1.66% Pb and 0.21 g/t Au in the deeper Combined Metals Bed, including 1.52 metres at 347.00 g/t Ag (365.87 g/t AgEq).

PRC-54:

  • 3.05 metres at 619.60 g/t Ag (665.07 g/t AgEq), 2.105 g/t Au, 3.66% Zn and 0.15% Pb in the Pioche "D" Shale, including 1.52 metres at 1,215.00 g/t Ag (1,297.58 g/t AgEq), 4.16 g/t Au, 6.67% Zn and 0.13% Pb.

PRC-55:

  • 4.57 metres at 106.10 g/t Ag (238.77 g/t AgEq), 13.0% Mn, 2.98% Zn, 1.29% Pb and 1.816 g/t Au in the Combined Metals Bed.

PRC-58:

  • 4.57 metres at 55.57 g/t Ag (119.36 g/t AgEq), 8.74% Mn, 3.92% Zn, 2.09% Pb and 0.05 g/t Au in Pioche "B" Shale, plus 3.05 metres at 51.47 g/t Ag (231.48 g/t AgEq), 2.16 g/t Au, 4.48% Zn and 0.90% Pb in Pioche "D" Shale.

Illustrative AgEq basis excluding Mn: AgEq (g/t) = 0.80 × [Ag + 70 × Au + 17.14285 × Zn% + 10.97142 × Pb%]. Prices: US$50/oz Ag, US$3,500/oz Au, US$1.25/lb Zn and US$0.80/lb Pb. The 80% recovery is assumed for each included metal; AgEq is divided by the silver price without a further recovery adjustment. AgEq values are rounded to two decimal places. Mn is excluded. Recoveries have not been established for every interval; payability and costs are excluded.

Element symbols: Ag = silver; Au = gold; Zn = zinc; Pb = lead; Mn = manganese.

Derek Iwanaka, Chief Executive Officer, commented: "PRC-59 and PRC-60 have delivered two of our most substantial broad polymetallic intersections to date. It is especially exciting to find shallow intervals of this scale near historical workings: they show that meaningful mineralization remains around the old mine. We are also repeatedly encountering mineralization in the Lyndon Limestone, Pioche Shale and Combined Metals Bed. PRC-60 offers a close comparison with historical underground drilling, while the pending twin-hole assays will help test the historical database. Together, these modern results are sharpening our geological model and building confidence in the technical foundation for a maiden mineral resource estimate."

As of September 27, 2026, the Company has completed 41 holes totaling 11,251 metres of drilling in its ongoing RC program at Prince.

Drilling Interpretation

The Lyndon Limestone intervals in PRC-59 and PRC-60 are wider than the Company's previously reported 27.43 metres grading 93.7 g/t Ag in PRC-45. These broad intersections show meaningful mineralization remains in the tested ground near historical workings. Their assays and geological observations add control to the interpretation of this horizon and allow comparison with historical mine plans.

PRC-60 also intersected the Combined Metals Bed near two Prince 835-level historical underground holes, estimated to be within 26 and 38 metres from the PRC-60 intersection. This intersection allows the Company to compare zone continuity and assays with the underground records and assess the historical holes for possible use in the maiden resource estimate.

PRC-51 through PRC-55, PRC-57 and PRC-58 add data from the Combined Metals Bed and Pioche Shale units. The repeated zone picks align with the historical interpretation of stacked replacement horizons in a faulted corridor. The new assays and geological observations help correlate those horizons with historical drill hole logs and mine plans and confirm how local faulting affects their relative positions.

The Company and its independent resource consultants are incorporating these observations and data into the geological model as historical information is validated. These correlations will help confirm mineralized domains for a maiden NI 43-101 mineral resource estimate targeted for early 2027. No mineral resource has yet been established for Prince.

Significant New Drill Intervals

Table 1 presents the significant intervals from PRC-51 through PRC-60, including shorter intervals within broader intersections and outcome of PRC-56. Depths and lengths are downhole measurements.

DDH No. From
(ft)
To
(ft)
Length
(ft)
Apparent
Width (m)*
Au
(g/t)
Ag
(g/t)
Mn
(%)
Zn
(%)
Pb
(%)
Zone of
Mineralization
PRC-51 690 735 45 13.72 0.18 77.60 5.29 2.16 0.71 Combined Metals Bed
including 690 695 5 1.52 0.10 265.00 5.36 1.24 0.68
including 695 705 10 3.05 0.07 98.90 4.92 2.44 0.60
including 705 715 10 3.05 0.06 30.40 3.80 2.62 0.54
including 715 720 5 1.52 0.53 69.00 7.81 2.77 1.11
including 720 735 15 4.57 0.24 35.20 5.67 1.78 0.78
and 970 985 15 4.57 3.04 83.30 0.26 2.32 0.30 Pioche "D" Shale
including 970 975 5 1.52 0.39 3.60 0.52 0.39 0.09
including 975 980 5 1.52 7.97 240.00 0.09 5.77 0.68
including 980 985 5 1.52 0.76 6.40 0.18 0.79 0.12
PRC-52 650 655 5 1.52 0.02 58.50 5.72 1.12 0.51 Combined Metals Bed
and 840 845 5 1.52 3.24 29.20 0.05 3.04 0.06 Pioche "D" Shale
PRC-53 710 720 10 3.05 0.08 75.20 18.13 6.97 1.69 Pioche "A" Shale
and 995 1005 10 3.05 0.02 41.10 5.09 1.58 0.56 Pioche Shale (Susan Duster)
PRC-54 595 605 10 3.05 0.07 77.10 9.89 1.82 0.63 Combined Metals Bed
including 595 600 5 1.52 0.12 133.00 18.70 3.28 1.18
including 600 605 5 1.52 0.01 21.20 1.07 0.35 0.08
and 865 875 10 3.05 2.11 619.60 0.10 3.66 0.15 Pioche "D" Shale
including 865 870 5 1.52 4.16 1,215.00 0.08 6.67 0.13
including 870 875 5 1.52 0.05 24.10 0.11 0.64 0.16
PRC-55 660 675 15 4.57 1.82 106.10 13.00 2.98 1.29 Combined Metals Bed
including 660 665 5 1.52 0.45 35.30 10.70 2.23 0.85
including 665 675 10 3.05 2.50 141.50 14.15 3.36 1.51
and 795 800 5 1.52 0.84 24.20 0.22 0.50 0.08 Pioche "D" Shale
PRC-56 Hole lost and abandoned at 137.2 metres.
PRC-57 600 610 10 3.05 0.05 42.00 9.26 1.45 0.81 Combined Metals Bed
and 675 680 5 1.52 2.13 43.40 7.97 2.76 1.21 Pioche "D" Shale
PRC-58 555 570 15 4.57 0.05 55.57 8.74 3.92 2.09 Pioche "B" Shale
including 555 560 5 1.52 0.09 109.00 12.25 4.68 2.40
including 560 570 10 3.05 0.04 28.85 6.99 3.54 1.94
and 740 760 20 6.10 0.05 40.13 4.24 0.77 0.47 Pioche Shale (Susan Duster)
and 765 780 15 4.57 0.10 58.07 10.16 2.41 1.28 Pioche "C" Shale
including 765 770 5 1.52 0.03 32.90 14.25 2.50 0.29
including 770 775 5 1.52 0.15 111.00 14.80 3.79 2.28
including 775 780 5 1.52 0.11 30.30 1.42 0.94 1.26
and 1050 1060 10 3.05 2.16 51.47 0.07 4.48 0.90 Pioche "D" Shale
including 1050 1055 5 1.52 3.59 95.70 0.05 8.38 1.57
including 1055 1060 5 1.52 0.72 7.23 0.08 0.58 0.23
PRC-59 145 155 10 3.05 0.11 84.35 5.46 2.08 2.79 Highland Peak Limestone
including 145 150 5 1.52 0.09 69.70 7.61 3.84 2.55
including 150 155 5 1.52 0.14 99.00 3.31 0.31 3.03
and 185 205 20 6.10 0.22 142.50 10.95 4.05 3.01 Chisholm Shale
including 185 195 10 3.05 0.17 120.00 9.35 1.24 3.17
including 195 200 5 1.52 0.39 220.00 14.50 8.46 3.91
including 200 205 5 1.52 0.16 110.00 10.60 5.24 1.77
and 205 360 155 47.24 0.26 68.17 9.57 2.40 1.95 Lyndon Limestone
including 205 225 20 6.10 0.30 136.25 9.37 3.48 2.49
including 225 235 10 3.05 0.75 38.60 1.72 0.66 0.85
including 235 250 15 4.57 0.64 72.67 7.10 1.25 2.59
including 250 255 5 1.52 0.57 44.70 3.95 0.93 1.62
including 255 270 15 4.57 0.20 86.07 10.38 2.63 1.66
including 270 280 10 3.05 0.13 58.70 9.47 1.89 1.19
including 280 290 10 3.05 0.30 84.50 10.71 1.48 2.43
including 290 300 10 3.05 0.20 60.75 12.60 2.09 1.89
including 300 315 15 4.57 0.10 45.47 11.00 2.03 2.17
including 315 330 15 4.57 0.09 38.33 8.64 2.15 1.88 Lyndon Limestone
including 330 335 5 1.52 0.04 61.40 8.58 2.63 2.37
including 335 350 15 4.57 0.05 36.70 14.07 4.84 1.41
including 350 360 10 3.05 0.13 69.75 12.10 3.03 2.33
and 400 405 5 1.52 0.02 64.70 6.35 0.82 0.33 Pioche "A" Shale
PRC-60 145 155 10 3.05 0.16 75.20 5.53 2.30 4.00 Highland Peak Limestone
including 145 150 5 1.52 0.21 48.40 1.95 1.50 4.94
including 150 155 5 1.52 0.10 102.00 9.11 3.10 3.06
and 210 330 120 36.58 0.28 86.30 9.46 3.08 2.20 Lyndon Limestone
including 210 220 10 3.05 0.35 74.40 6.03 7.13 2.30
including 220 235 15 4.57 0.29 190.33 15.25 3.31 3.01
including 235 250 15 4.57 0.83 62.70 6.30 1.58 2.04
including 250 280 30 9.14 0.23 94.27 9.97 3.44 2.35
including 280 295 15 4.57 0.17 69.23 12.93 3.49 2.18
including 295 300 5 1.52 0.15 99.90 10.95 2.70 1.97
including 300 310 10 3.05 0.16 57.95 6.67 1.40 1.86
including 310 315 5 1.52 0.15 29.40 3.98 1.83 1.18
including 315 330 15 4.57 0.09 48.30 7.86 2.18 1.83
and 345 350 5 1.52 0.09 58.70 11.75 3.24 3.11 Lyndon Limestone
and 355 370 15 4.57 0.08 41.97 5.38 3.34 1.49 Lyndon Limestone
including 355 360 5 1.52 0.12 52.20 8.85 3.81 2.45
including 360 370 10 3.05 0.06 36.85 3.65 3.11 1.01
and 540 550 10 3.05 0.18 40.35 15.93 8.14 1.84 Pioche "A" Shale
and 760 770 10 3.05 0.03 49.70 9.87 2.29 2.21 Pioche Shale
(Susan Duster)
and 850 905 55 16.76 0.21 85.98 5.61 1.50 1.66 Combined Metals Bed
including 850 855 5 1.52 0.03 90.40 10.00 2.48 2.48
including 855 865 10 3.05 0.05 47.45 5.65 1.98 1.89
including 865 885 20 6.10 0.16 32.35 2.64 0.88 1.36
including 885 890 5 1.52 0.38 146.00 7.36 1.45 1.49
including 890 895 5 1.52 0.88 347.00 4.96 1.48 2.13
including 895 905 10 3.05 0.14 69.05 8.78 1.84 1.46

Drilling and Resource Work

PRC-56 did not reach its target depth; however, PRC-65 was drilled as a replacement hole and was recently completed. Assays for holes PRC-61 through PRC-65 are currently pending.

PRC-59 was terminated at 158.5 metres after technical difficulties, before reaching the deeper Combined Metals Bed target. It nonetheless intersected 47.24 metres grading 68.2 g/t Ag, 9.57% Mn, 2.40% Zn, 1.95% Pb and 0.26 g/t Au in the Lyndon Limestone, one of the broadest mineralized intervals in the current program. These results provide assay and geological data near historical mine workings.

PRC-61 and PRC-62 were drilled as twins of 2012 historical holes PRC-10 and PRC-17, respectively. Once assays are reviewed, comparisons of geology, mineralized interval positions and grades will help assess the historical drilling database for possible use in the maiden resource estimate.

Drill Hole Collar Information

Table 2 summarizes the collar coordinates and orientations of the nine assayed holes and abandoned PRC-56. Coordinates are NAD83 UTM Zone 11N. Final collar information is subject to qualified person verification.

UTM Coordinates (NAD83Z11N)
Hole No. Easting Northing Elev. (m) Azi. Incl. Length (m)
PRC-51 722038 4197988 1784.96 0 -90 310.90
PRC-52 721913 4197989 1788.21 0 -90 274.32
PRC-53 722305 4197638 1763.90 250 -75 394.72
PRC-54 721861 4198199 1799.10 0 -90 292.61
PRC-55 721927 4198455 1809.50 0 -90 252.98
PRC-56 722290 4197716 1766.90 0 -90 137.20
PRC-57 721845 4198554 1810.30 0 -90 268.20
PRC-58 722106 4197726 1778.76 0 -90 334.37
PRC-59 722215 4197741 1774.80 0 -90 158.50
PRC-60 722211 4197739 1774.80 0 -90 312.42

Figure 1 Drill Hole Location Map

The map shows drill hole locations and distinguishes the current assay release from holes with assays pending.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/11448/317507_prnc-figure1_550.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/11448/317507_prnc-figure1.jpg

Quality Assurance and Quality Control

The RC assays in this release are supported by finalized ALS Geochemistry certificates. The Company inserts two certified reference standards, one blank, one pulp duplicate and one reject duplicate into a typical batch of 45 rock samples. Control-sample results are plotted and monitored, and returned pulps are selected for check assaying at a second independent laboratory.

Samples are shipped under chain-of-custody procedures to ALS in Reno, Nevada, for preparation and then to ALS in Vancouver, British Columbia, for analysis. Au is determined by Au-ICP22 fire assay, with additional follow-up assays where required; Ag and other elements are analyzed using the AuME-TL44 aqua regia method. Overlimit Ag, Mn, Zn and Pb results are determined using follow-up methods identified in the ALS certificates. Selected samples from different lithologies are also submitted for specific gravity measurements.

Qualified Person

The scientific and technical information in this news release has been reviewed and approved by Patrick Toth, P.Geo., the Company's Exploration Manager and a non-independent Qualified Person as defined under NI 43-101.

About Prince Silver Corp.

Prince Silver Corp. is a mineral exploration company advancing its flagship Prince Silver Project in Nevada, USA. The Company is undertaking drilling, metallurgical studies and geological modelling toward a maiden NI 43-101 mineral resource estimate. Prince Silver also holds an interest in the Stampede Gap project in Nevada.

On Behalf of the Board of Directors

Derek Iwanaka, CEO & Director
Tel: 236 335-9383
Email: info@princesilvercorp.com
Website: www.princesilvercorp.com

Forward-Looking Information

This news release contains forward-looking statements and forward-looking information within the meaning of applicable securities laws (collectively, "forward-looking statements"). Such statements are often identified by words including "expects," "plans," "estimates," "potential," "may," "will," "could" and "should," and similar expressions.

Forward-looking statements in this news release include interpretations of current and historical drilling, including the continuity and extent of stacked mineralized horizons and their relationship to historical workings; pending assays for PRC-61 through PRC-65 and the significance of twin-hole comparisons; validation and possible use of historical data in resource modelling; further drilling, metallurgical studies and geological modelling; and the timing, completion and outcome of a maiden NI 43-101 mineral resource estimate targeted for early 2027.

These statements assume, among other things, that current assays and geological data are reliable; relevant historical drilling and mine plans can be validated; geological correlations and mineralization between intercepts can be interpreted accurately; laboratory services, consultants, personnel, equipment, drill rigs and financing remain available on reasonable terms; and required permits and approvals are obtained.

Actual results could differ materially because pending assays or twin-hole comparisons may not support current interpretations; historical data may not be validated or used in a mineral resource estimate; mineralization between holes may differ in continuity, geometry, width or grade; assays, drilling, technical work or modelling may be delayed; metallurgy or resource-estimation work may not support a mineral resource; financing, personnel, contractors or permits may be unavailable; and market conditions or commodity prices may change. Other risks are described in the Company's continuous disclosure filings.

Readers are cautioned not to place undue reliance on forward-looking statements. These statements are made as of the date of this news release. The Company undertakes no obligation to update or revise them, except as required by applicable law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/317507

News Provided by TMX Newsfile via QuoteMedia

PRNC:CC
Prince Silver

Prince Silver Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Prince Silver (CSE:PRNC)

Prince Silver

Advancing a large-scale, past-producing polymetallic silver-manganese project in Nevada.

Advancing a large-scale, past-producing polymetallic silver-manganese project in Nevada. Keep Reading...

Investor Insight

With a strong asset foundation, C$8 million in cash, and an experienced technical team, Prince Silver is well-positioned to capitalize on the current macro tailwinds in the silver and manganese markets. The project has a US Critical Minerals advantage, hosting silver, zinc, lead, and manganese, in addition to gold.

Overview

Prince Silver (CSE:PRNC,OTCQB:PRNCF) is a Vancouver-based exploration company focused on unlocking value at the Prince silver project in southeastern Nevada.

In July 2025, the company completed a transformational acquisition of Stampede Metals Corporation and subsequently rebranded from Hawthorn Resources to Prince Silver Corp.

Map of Prince Silver and Stampede Gap Projects in Nevada, showing mines and highways.

The flagship asset is a district-scale, past-producing silver-gold-zinc-manganese carbonate replacement system, historically mined through the early to mid-1900s. The immediate objective is to validate and expand upon the 129 historic drill holes (over 16,600 meters) to convert the exploration target into a maiden NI 43-101 mineral resource, targeted for the fourth quarter of 2026.

Company Highlights

  • Flagship Project: 100 percent ownership of the historic Prince silver mine in Lincoln County, Nevada, an open, near-surface silver-gold-zinc carbonate replacement deposit. It has an exploration target of 23 to 45 million tons, with strong historic grades.
  • Fully Funded Drilling Program Underway: A 9,000-meter reverse-circulation drill program is now underway with a steady stream of assay results expected from January to May 2026. This follows an recent funding raise of approximately C$4.75 million in gross proceeds.
  • Clean Corporate Reset: Hawthorn Resources completed the Stampede Metals acquisition and re-listed as Prince Silver Corp. on July 11, 2025.
  • Tight Share Structure: The company has 58.9 million shares issued and outstanding as of February 23, 2026.
  • US Critical Minerals Leverage: The Prince Project hosts critical and strategic minerals on the 2025 USGS list: silver, zinc, lead, and manganese, in addition to gold.
  • Experienced, Hands-on Leadership: President Ralph Shearing, CEO Derek Iwanaka, and new directors Marco Montecinos, Robert Wrixon and Darrell Rader add mine-building, corporate, and capital-markets depth to the leadership team.
  • Expanded Land Position: The land package at the Prince Silver Project has more than doubled, securing over 7 kilometers of prospective strike length along the mineralized fault system.

Key Projects

Prince Silver Project

Aerial view of Prince Silver historic mine area with sinkholes and headframe in a desert landscape.

The Prince silver project is a large-scale, polymetallic Carbonate Replacement Deposit (CRD) located just west of Pioche, a historic mining district in southeastern Nevada. The project hosts a structurally and stratigraphically controlled system of silver-rich mantos, breccias, and fissure veins. Historic underground production between 1912 and 1949 totaled approximately 1.12 million tons (Mt) at average grades of 100 grams per ton (g/t) silver, 4.5 percent zinc, and 10 percent manganese.

Highlights

  • Geological compilation work has defined an exploration target ranging between 23 and 45 Mt, grading approximately 37 to 40 g/t silver, 1.5 percent zinc, and 0.8 percent lead.
  • The fully-funded 9,000 meter drill program is underway with a steady stream of assay results expected from January to May 2026, targeting a maiden NI 43-101 Mineral Resource Estimate (MRE) in the fourth quarter of 2026.
  • The company recently expanded its land position, securing over 7 kilometers of prospective strike length along the mineralized fault system.

Stampede Gap Copper-Gold-Molybdenum Project

Map showing Prince Silver's Stampede Gap Project's mines near Pioche, Nevada.

The Stampede Gap Copper-Gold-Molybdenum Project is a large, early-stage porphyry target in Nevada featuring over 200 claims. Historical geophysics have identified multiple IP-resistivity anomalies, and a single 700 meter drill hole encountered extensive skarn alteration. Its location is only 150 kilometers south of KGHM's Robinson copper-gold-silver-molybdenum mine. The project presents a deep-seated exploration target that has the hallmarks of a large-scale copper-molybdenum deposit.

Management Team

Derek Iwanaka – Chief Executive Officer and Director

Derek Iwanaka is a mining-sector executive with over 23 years of investor relations, corporate development, and capital markets experience. He has supported more than 20 corporate transactions and helped raise over US$100 million, including one of Canada's first at-the-market financings. Iwanaka previously held senior roles at BeMetals and First Mining Gold Corp., contributing to strategic acquisitions, project advancement, and significant market-cap growth.

Ralph Shearing – President and Director

Ralph Shearing is a professional geologist and mine developer with over 35 years in mineral exploration development and public company management. Since 1987, Shearing has held senior executive positions with public junior mining and exploration companies, notably Luca Mining, a company he founded and guided through exploration, development, construction, and pre-production of the Tahuehueto mine in Mexico. He currently acts as a Qualified Person for Prince Silver’s technical disclosure.

Rob Scott – Chief Financial Officer and Corporate Secretary

Rob Scott’s professional experience has helped raise over $200 million in equity with past and current executive and board positions with TSXV issuers, including Great Bear Resources, Valore Metals, Riverside Resources, Capitan Silver, and First Helium.

Dr. Robert Wrixon – Independent Director

Robert Wrixon is the managing director of Starboard Global, a Hong Kong-based project incubator and VC firm. Wrixon is a seasoned executive and engineer with over 20 years’ experience across ASX- and LSE-listed mining companies. He holds a PhD in mineral engineering from UC Berkeley and brings deep technical, corporate development, and mergers and acquisitions experience.

Darrell Rader – Independent Director

Darrell Rader is the president and chief executive officer of Minaurum Gold, a silver explorer in Mexico. He has directly raised over $150 million for mineral exploration and development and has strong relationships with institutional investors and bankers. Rader founded Defiance Silver Corp, a silver developer, and previously was the head of corporate development at IMPACT Silver. Rader holds a BBA in Finance from Simon Fraser University.

Marco Montecinos – Independent Director

Marco Montecinos has over 40 years of mineral exploration experience across the Americas, including a key role in the three-million-ounce Marlin Gold discovery, multiple gold discoveries, and current roles as chief president of exploration at Gunpoint Exploration and US Critical Metals, as well as president of Tigren, Inc.

Mayfair Gold Reports Q3 2026 Operating and Financial Results

Mayfair Gold Reports Q3 2026 Operating and Financial Results

Mayfair Gold Corp. (TSXV: MFG,OTC:MFGCF) (NYSE American: MINE) ("Mayfair", "Mayfair Gold", or the "Company") is pleased to report its operating and financial results for the quarter ended September 30, 2026. The full version of the financial statements and accompanying management's discussion... Keep Reading...
Omega Pacific Closes First Tranche of LIFE Offering

Omega Pacific Closes First Tranche of LIFE Offering

Omega Pacific Resources Ltd. (CSE: OMGA) (OTCQB: OMGPF) (FSE: Q0F) ("Omega Pacific" or the "Company") is pleased to announce the closing of the first tranche of its non-brokered private placement pursuant to the listed issuer financing exemption (the "LIFE Offering"), as previously announced on... Keep Reading...
TDG Gold Corp. agrees to sell 51% interest in Aurora West Property to Freeport-McMoRan Mineral Properties Canada Inc. for C$110 million and to grant certain additional earn-in rights upon funding of C$80 million of expenditures and upon C$40 million cash payment

TDG Gold Corp. agrees to sell 51% interest in Aurora West Property to Freeport-McMoRan Mineral Properties Canada Inc. for C$110 million and to grant certain additional earn-in rights upon funding of C$80 million of expenditures and upon C$40 million cash payment

TDG Gold Corp. ("TDG" or the "Company") (TSXV: TDG | OTCǪX: TDGGF) is pleased to announce that it has entered into a binding joint venture implementation and purchase agreement dated November 12, 2026 (the "Purchase Agreement") with its wholly owned subsidiary, TDG BC Assets Corp., and... Keep Reading...
Tinka Signs Agreement with Key Community at Ayawilca

Tinka Signs Agreement with Key Community at Ayawilca

Tinka Resources Limited (TSXV: TK) (OTCQX: TKRFF) ("Tinka" or the "Company") is pleased to provide an update on activities at the Ayawilca polymetallic project in Peru ("Ayawilca" or "the project"). Key Highlights: Tinka has signed an agreement with the San Pedro de Pillao community ("Pillao")... Keep Reading...
Silverco Provides La Negra Update: First New Underground Equipment Onsite and Tailings Filtration Project Advanced

Silverco Provides La Negra Update: First New Underground Equipment Onsite and Tailings Filtration Project Advanced

Silverco Mining Ltd. (TSXV: SICO) (OTCQB: SICOF) ("Silverco" or the "Company") is pleased to provide an update on activities at its 100% owned La Negra Mine ("La Negra") in Querétaro, Mexico. The first unit of the Company's new Epiroc equipment fleet has arrived at site and is being commissioned... Keep Reading...
Triumph Gold Announces Director Appointment and Management Changes

Triumph Gold Announces Director Appointment and Management Changes

triumph gold Corp., (TSXV: TIG,OTC:TIGCF) (OTCQB: TIGCF) ("Triumph" or the "Company") announces that effective November 11, 2026, Russell Ball has been appointed to the board of directors of the Company. Mr. Ball has also been appointed Chair of the Board and Interim Chief Executive Officer,... Keep Reading...
Prince Silver

Prince Silver Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Interactive Chart

Latest Press Releases

Related News