ASX:BSX

Ta Khoa Mineral Resource Update

Blackstone Minerals Limited (“Blackstone” or the “Company”) is pleased to present a Mineral Resource update for its 90% owned Ta Khoa Nickel Project (TKNP) in northern Vietnam (refer Figure 2). The global Ta Khoa resource estimate is comprised of the Ban Phuc and Ban Khoa DSS deposits (refer to Figure 3 and Table 1); and the Ban Chang and King Snake MSV (refer Figure 3 and Table 1).

Blackstone Minerals has conducted significant exploration and development programs since acquiring the TKNP in late 2019. Programs include extensive geochemical, geophysical, drilling, mapping, analytical testing, resource evaluations, petrographic and mineralogical analysis at the main development projects and a series of greenfield exploration prospects.

Blackstone’s TKNP and Ta Khoa Refinery (TKR) form two major cogs in Blackstone’s vertically integrated development strategy to produce Nickel-Cobalt-Manganese (NCM) 811 precursor for the growing lithium-ion battery industry. The strategy is underpinned by Blackstone’s ability to secure nickel concentrate and Ta Khoa is emerging as a nickel sulfide district of enviable scale with several exploration targets yet to be tested. The updated TKNP Mineral Resource presented in this report demonstrates a clear means of secure nickel concentrate supply.

In July 2021 the Company completed a technically and economically robust PFS for the TKR. The PFS was based on treating 400ktpa of nickel concentrate, supplied from the TKNP as well as third party concentrate. Blackstone plans to provide at least half of the TKR feed concentrate from TKNP, with mill feed sourced from Ban Phuc, Ban Chang, King Snake and potentially other targets as drilling continues.

Highlights from the TKNP Mineral Resource update include:

  • Update of the Ban Phuc Mineral Resource:
    • 123Mt at 0.37% Ni for 452kt of Nickel (or 0.43% NiEQ for 523kt NiEQ) - Increased from 58.7Mt at 0.48% Ni for 280kt of Nickel (June 2020)
    • 102Mt at 0.38% Ni (0.44% NiEQ) is in the Indicated category and 21Mt at 0.33% Ni (0.37% NiEQ) is in the Inferred category
      • The Ban Phuc Mineral Resource is reported using a 0.25% Ni cut-off grade for the sulfide component and 0.3% Ni cut-off grade for the oxide and transitional component (previously 0.30% Ni universally)
      • Updated Resource expected to underpin higher throughputs, with a large 8 Mtpa concentrator now being adopted as the base case in the Company’s upcoming TKNP PFS
      • Shape and width of mineralised domains and the continuity of mineralisation are driving low strip ratios for the final Ban Phuc PFS pit design

Click here for the full ASX release


This article includes content from Blackstone Minerals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

BSX:AU
Blackstone Minerals

Blackstone Minerals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Blackstone Minerals

Blackstone Minerals

Advancing the Mankayan copper-gold project, a world-class copper-gold project in the Philippines

Advancing the Mankayan copper-gold project, a world-class copper-gold project in the Philippines Keep Reading...
Quarterly Activities/Appendix 5B Cash Flow Report

Quarterly Activities/Appendix 5B Cash Flow Report

Blackstone Minerals (BSX:AU) has announced Quarterly Activities/Appendix 5B Cash Flow ReportDownload the PDF here. Keep Reading...
Managing Director Resignation and Board Changes

Managing Director Resignation and Board Changes

Blackstone Minerals (BSX:AU) has announced Managing Director Resignation and Board ChangesDownload the PDF here. Keep Reading...
Quarterly Activities/Appendix 5B Cash Flow Report

Quarterly Activities/Appendix 5B Cash Flow Report

Blackstone Minerals (BSX:AU) has announced Quarterly Activities/Appendix 5B Cash Flow ReportDownload the PDF here. Keep Reading...
BSX Secures JV Partner & Funding for Ta Khoa Nickel Project

BSX Secures JV Partner & Funding for Ta Khoa Nickel Project

Blackstone Minerals (BSX:AU) has announced BSX Secures JV Partner & Funding for Ta Khoa Nickel ProjectDownload the PDF here. Keep Reading...
Trading Halt

Trading Halt

Blackstone Minerals (BSX:AU) has announced Trading HaltDownload the PDF here. Keep Reading...
Fathom Nickel (CSE:FNI)

Fathom Announces Commencement of Winter Drill Program at the Gochager Lake Project

Fathom Nickel Inc. (CSE: FNI,OTC:FNICF) (FSE: 6Q5) (OTCQB: FNICF) ("Fathom", or the "Company") is pleased to announce that the winter drill program at the Gochager Lake project commenced late in the day of March 6, 2026. Drilling is expected to continue into the first or second week of April,... Keep Reading...
Aerial view of excavators and trucks at a construction site.

Oregon: America’s Premier Domestic Nickel Opportunity

The global race for critical minerals has begun. As the US stares down a future of massive industrial shifts, the strategy is clear: secure the supply chain or get left behind. Demand for nickel is hitting overdrive, fueled by its role in electric vehicle (EV) batteries, high-strength stainless... Keep Reading...
Fathon Nickel (CSE:FNI)

Fathom Announces Completion of Gochager Lake Winter Trail and Expected Start of Winter Drill Program

Fathom Nickel Inc. (CSE: FNI) (FSE: 6Q5) (OTCQB: FNICF) ('Fathom", or the "Company") is pleased to announce the completion of the winter trail, and mobilization of drilling and ancillary equipment to the Gochager Lake project. Drilling of the 3,000-to-4,000-meter program is expected to begin... Keep Reading...
Fathom Announces Completion of Gochager Lake Winter Trail and Expected Start of Winter Drill Program

Fathom Announces Completion of Gochager Lake Winter Trail and Expected Start of Winter Drill Program

Fathom Nickel Inc. (CSE: FNI,OTC:FNICF) (FSE: 6Q5) (OTCQB: FNICF) ('Fathom", or the "Company") is pleased to announce the completion of the winter trail, and mobilization of drilling and ancillary equipment to the Gochager Lake project. Drilling of the 3,000-to-4,000-meter program is expected to... Keep Reading...
Ni-Co Energy

Ni-Co Energy Inc. Files Preliminary Prospectus for Proposed Initial Public Offering

Ni-Co Energy Inc. (“Ni-Co Energy” or the “Company”) is pleased to announce that it has filed a preliminary prospectus (the “Preliminary Prospectus”) with the securities regulatory authorities in the provinces of Québec, Ontario, Alberta, and British Columbia in connection with its proposed... Keep Reading...
Bahia Metals (CSE:BMT)

Bahia Metals Corp. Completes Initial Public Offering of $5,750,000, with Full Exercise of Over-Allotment Option

Bahia Metals Corp. (CSE: BMT) ("Bahia" or the "Company") is pleased to announce that it has successfully completed its initial public offering (the "IPO") of 11,500,000 units of the Company (the "Units") at a price of $0.50 per Unit, inclusive of the full exercise of the 15% over-allotment... Keep Reading...
Blackstone Minerals

Blackstone Minerals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Interactive Chart

Latest Press Releases

Related News