athabasca oil stock

Fission Resource Expansion Drilling on R840W Zone Hits High-Grade Mineralization in 19 Holes

TSX SYMBOL: FCU
OTCQX SYMBOL: FCUUF
FRANKFURT SYMBOL: 2FU

Results include major holes such as 57.5m of continuous mineralization, with 19.15m of total composite >10,000 cps

FISSION URANIUM CORP. (" Fission " or " the Company ") is pleased to announce scintilometer results from the summer 2021 "resource upgrade" drill program on the R840W zone at its' PLS project, in the Athabasca Basin region of Saskatchewan, Canada . All 25 holes h it mineralization, with nineteen intercepting significant intervals of >10,000 cps radioactivity. This includes PLS21-624 (line 630W), which intersected 57.5m of continuous mineralization, including 19.15m of total composite radioactivity >10,000 cps (with a peak of 62,400 cps) . Assays are still pending and will be released when received. The goal of the summer resource drilling is to upgrade the majority of the R840W zone by decreasing the spacing between drill hole mineralized intercepts with the goal of upgraded to Indicated classification, for potential use in the Feasibility Study .  The resource upgrade drilling was conducted in conjunction with the on-going Phase 1 Feasibility work at PLS, focusing on drilling for geotechnical, hydrogeological, geochemical and metallurgical data (see News Release June 10 2021).

Logo Fission Uranium Corp. (CNW Group/Fission Uranium Corp.)

Ross McElroy , President and CEO for Fission, commented, " Our summer resource drilling at the R840W zone has been very successful. The goal was to expand and upgrade this important zone, which is the largest of those not currently included in the Triple R deposit, for potential inclusion in the upcoming feasibility study. We hit mineralization with all 25 holes, testing over 353m of strike length of the R840W zone, the majority of which intersected considerable high-grade intervals. As we await confirmation with assay results, we believe this represents a strong validation of our growth strategy as we continue to develop the project . "

Drilling Highlights

  • 100% Hit Rate; Majority of Holes Hit High-Grades. All 25 holes hit significant mineralization, including 19 with high-grade intercepts.

  • R840W Zone Resource Drilling . The holes successfully targeted specific, mainly "inferred" categorized areas of the R840W zone over ~353m of strike length between holes PLS21-624 and PLS21-631, using step out and infill drilling to achieve spacing of ~15m x 20m (horizontal / vertical), with the aim of conversion from Inferred to Indicated. The R840W zone is the 2 nd largest of five high-grade zones that make up the Triple R deposit. Although the R840W has been used in the global resource estimate for the Triple R, due to it currently being mainly Inferred classification, it was not considered in the economic analysis of the Prefeasibility Study. If assay results and subsequent modeling provide confirmation that the desired hole spacing has been achieved and at acceptable grade, then the R840W zone can be upgraded to Indicated and then considered for inclusion into the Feasibility study.

Highlight intersections from the drill program include:

  • Hole PLS21-624 (line 630W)
    • 57.5m continuous mineralization over a 57.5m interval (between 109.0m to 166.5m ), includin
      • 19.15m of total composite mineralization >10,000 cps
  • Hole PLS21-635 (line 750W)
    • 56.0m total composite mineralization over a 78.0m interval (between 101.5m to 179.5m ), includin
      • 7.8m of total composite mineralization >10,000 cps
  • Hole PLS21-633 (line 930W)
    • 27.0m total composite mineralization over a 47.0m interval (between 154.5m to 201.5m ), including
      • 6.75m of total composite mineralization >10,000 cps

The R840W zone is located approximately 485m to the west along strike of the Triple R deposit's R00E zone.

As detailed in the report dated January 07, 2019 and with an effective date of September 19, 2019 and titled Pre-Feasibility Study on the Patterson Lake South Property Using Underground Mining Methods, Northern Saskatchewan, Canada , the R840W is currently defined using CIM definitions (2014) for mineral resources at a cut-off of 0.25% U3O8 of:

  • Indicated Mineral Resource: 88,000 tonnes at 1.68% U3O8 yielding 3,300,000 lbs U3O8
  • Inferred Mineral Resource: 280,000 tonnes at 1.86% U3O8 yielding 11,500,000 lbs U3O8

At this time, mineral reserves have not been estimated for the R840W zone.

Table 1: Drill Hole Summary

Hole ID

Zone

Collar

Hand-held Scintillometer Results On Mineralized Drillcore (>300 cps / >0.5M minimum)

Overburden Depth (m)

Mudstone
To (m)

Sandstone
To (m)

Basement Unconformity Depth (m)

Total Drillhole Depth (m)

Grid Line

Az

Dip

From (m)

To (m)

Width (m)

CPS Peak Range

PLS321-612

R840W

870W

336

-60.5

186.0

195.0

9.0

310 - 4100

102.8

107.3

NA

107.3

281.0

200.5

202.0

1.5

340 - 8800

205.0

217.5

12.5

PLS21-613

R840W

870W

337

-60.5

194.0

224.5

30.5

127.1

NA

NA

127.1

286.0

PLS21-614

R840W

900W

337

-59.7

184.0

190.5

6.5

300 - 24800

122

NA

NA

122.0

290.0

196.0

199.0

3.0

430 - 7300

212.5

228.0

15.5

PLS21-615

R840W

900W

340

-63.2

193.5

195.5

2.0

115.7

NA

NA

115.7

254.0

198.5

203.0

4.5

320 - 55500

207.5

213.0

5.5

450 - 8500

221.0

222.5

1.5

350 - 4800

PLS21-616

R840W

930W

341

-72.6

150.5

151.5

1.0

370 - 450

110.0

NA

NA

110.0

248.0

181.0

187.0

6.0

197.0

212.5

15.5

229.0

229.5

0.5

660

PLS21-617

R840W

885W

337

-79.4

177.0

195.0

18.0

105.0

NA

NA

105.0

269.0

PLS21-618

R840W

780W

335

-70.3

138.0

141.5

3.5

109.6

NA

NA

109.6

242.8

145.5

160.5

15.0

165.5

183.0

17.5

320 - 21900

PLS21-619

R840W

810W

157

-71.7

125.0

129.0

4.0

110.0

122.0

NA

122.0

251.0

132.0

149.0

17.0

155.5

164.5

9.0

PLS21-620

R840W

675W

335

-71.2

135.0

135.5

0.5

350

84.7

99.3

NA

99.3

200.0

153.0

157.5

4.5

340 - 1300

PLS21-621

R840W

810W

335

-71.7

125.5

126.0

0.5

540

107.0

NA

NA

107.0

230.0

129.5

146.0

16.5

PLS21-622

R840W

705W

337

-71.7

142.5

146.5

4.0

107.0

NA

NA

107.0

224.0

PLS21-623

R840W

765W

284

-71.6

128.0

167.5

39.5

100.4

101.8

NA

101.8

224.0

PLS21-624

R840W

630W

350

-71.7

109.0

166.5

57.5

105.6

NA

NA

105.6

200.0

PLS21-625

R840W

780W

336

-59.7

125.0

143.0

18.0

122.0

NA

NA

122.0

213.7

156.5

157.0

0.5

610

162.0

162.5

0.5

740

165.0

180.5

15.5

PLS21-626

R840W

780W

335

-71.0

115.5

144.0

28.5

115.7

NA

NA

115.7

215.0

148.5

157.5

9.0

160.5

164.5

4.0

300 - 610

177.5

181.5

4.0

PLS21-627

R840W

780W

350

-72.2

117.0

118.0

1.0

450 - 800

107.9

NA

NA

107.9

251.0

120.5

122.0

1.5

580 - 820

126.0

168.5

42.5

196.5

197.0

0.5

350

201.0

201.5

0.5

460

PLS21-628

R840W

810W

335

-72.2

138.5

154.0

15.5

105.2

NA

NA

105.2

224.0

156.5

174.5

18.0

300 - 48700

PLS21-629

R840W

870W

335

-71.1

172.5

178.0

5.5

104.5

NA

NA

104.5

224.0

187.0

193.0

6.0

PLS21-630

R840W

945W

336

-72.5

158.0

161.5

3.5

390 - 21600

102.6

NA

NA

102.6

227.0

167.5

171.0

3.5

176.0

185.5

9.5

PLS21-631

R840W

945W

336

-72.0

176.0

179.5

3.5

310 - 25500

117.4

NA

NA

117.4

264.0

187.5

203.0

15.5

PLS21-632

R840W

870W

336

-52.3

231.5

239.0

7.5

360 - 24300

112.7

NA

NA

112.7

352.0

248.0

250.0

2.0

360 - 26200

290.0

290.5

0.5

600

PLS21-633

R840W

930W

338

-72.6

154.5

156.0

1.5

310 - 1400

113.0

NA

NA

113.0

263.0

158.5

166.0

7.5

330 - 7900

183.5

201.5

18.0

320 - 44800

PLS21-634

R840W

750W

156

-70.9

113.0

119.5

6.5

71.0

97.4

NA

97.4

221.0

123.0

138.0

15.0

143.0

148.5

5.5

155.5

159.0

3.5

880 - 5200

172.0

178.0

6.0

188.5

191.5

3.0

650 - 22900

195.0

197.0

2.0

PLS21-635

R840W

750W

157

-71.4

101.5

153.5

52.0

420 - 49100

84.9

101.0

102.0

102.0

248.3

172.0

175.5

3.5

179.0

179.5

0.5

340

PLS21-636

R840W

750W

156

-71.8

102.0

110.0

8.0

86.0

100.0

102.0

102.0

221.0

113.0

120.0

7.0

122.0

144.5

22.5

151.0

153.0

2.0

310 - 2300

167.0

167.5

0.5

330

172.0

173.0

1.0

320 - 380

Natural gamma radiation in drill core that is reported in this news release was measured in counts per second (cps) using either a hand-held RS-230, RS-125 or RS-121 Scintillometer, all manufactured by Radiation Solutions, which are capable of discriminating readings up to 65,535 cps. In each hole, natural gamma radiation is also recorded in a down-hole survey measured in counts per second (cps) using a Mount Sopris 2GHF-1000 Triple Gamma probe, which allows for more accurate measurements in high grade mineralized zones.  The Triple Gamma probe is preferred in zones of high-grade mineralization.  The reader is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of the rock sample measured, and should be used only as a preliminary indication of the presence of radioactive materials. The degree of radioactivity within the mineralized intervals is highly variable and associated with visible pitchblende mineralization. All intersections are down-hole.  All depths reported of core interval measurements including radioactivity and mineralization intervals widths are not always representative of true thickness.  The orientation of the mineralized intervals tend to follow that of lithologic contacts, and generally dip steeply to the south. Within the Triple R deposit, individual zone wireframe models constructed from assay data and used in the resource estimate indicate that all 5 zones have a complex geometry controlled by and parallel to steeply south-dipping lithological boundaries as well as a preferential sub-horizontal orientation.

Samples from the drill core will be split in half sections on site and where possible, samples will be standardized at 0.5m down-hole intervals. One-half of the split sample will be sent to SRC Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK for analysis which includes U 3 O 8 (wt %) and fire assay for gold, and includes a 63 element ICP-OES analysis and boron. The other half of the split core remains on site for reference.

PLS Mineralized Trend & Triple R Deposit Summary

Uranium mineralization of the Triple R deposit at PLS occurs within the Patterson Lake Conductive Corridor and has been traced by core drilling over ~3.18 km of east-west strike length in five separated mineralized "zones" which collectively make up the Triple R deposit. From west to east, these zones are: R1515W, R840W, R00E, R780E and R1620E. Through successful exploration programs completed to date, Triple R has evolved into a large, near surface, basement hosted, structurally controlled high-grade uranium deposit.  The discovery hole was announced on November 05, 2012 with drill hole PLS12-022, from what is now referred to as the R00E zone.

The R1515W, R840W and R00E zones make up the western region of the Triple R deposit and are located on land, where overburden thickness is generally between 55 m to 100 m .  R1515W is the western-most of the zones and is drill defined to ~90 m in strike-length, ~68 m across strike and ~220 m vertical and where mineralization remains open in several directions.  R840W is located ~515 m to the east along strike of R1515W and has a drill defined strike length of ~430 m.  R00E is located ~485 m to the east along strike of R840W and is drill defined to ~115 m in strike length.  The R780E zone and R1620E zones make up the eastern region of the Triple R deposit.  Both zones are located beneath Patterson Lake where water depth is generally less than six metres and overburden thickness is generally about 50 m .  R780E is located ~225 m to the east of R00E and has a drill defined strike length of ~945 m.  R1620E is located ~210 m along strike to the east of R780E, and is drill defined to ~185 m in strike length.

The Company completed and filed a prefeasibility "PFS" study on November 07, 2019 titled "Pre-Feasibility Study on the Patterson Lake South Property Using Underground Mining Methods, Northern Saskatchewan, Canada ".  The report summarizes the Pre-Feasibility Study ("UG PFS"), which outlines an underground-only mining scenario for PLS which to date has only considered the R00E and R780E zones.  Further work, including additional drilling may provide sufficient data for future inclusion of the R1515W, R840W and R1620E zones into the Feasibility Study mine plan.

Mineralization along the Patterson Lake Corridor trend remains prospective along strike in both the western and eastern directions. Basement rocks within the mineralized trend are identified primarily as mafic volcanic rocks with varying degrees of alteration.  Mineralization is both located within and associated with mafic volcanic intrusives with varying degrees of silicification, metasomatic mineral assemblages and hydrothermal graphite. The graphitic sequences are associated with the PL-3B basement Electro-Magnetic (EM) conductor.

Patterson Lake South Property

The 31,039 hectare PLS project is 100% owned and operated by Fission Uranium Corp. PLS is accessible by road with primary access from all-weather Highway 955, which runs north to the former Cluff Lake mine and passes the nearby Nexgen Arrow deposit located 3km to the east and UEX-Areva Shea Creek discoveries located 50km to the north.

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company by Ross McElroy , P.Geol., President and CEO for Fission Uranium Corp., a qualified person.

About Fission Uranium Corp.

Fission Uranium Corp. is a Canadian based resource company specializing in the strategic exploration and development of the Patterson Lake South uranium property - host to the class-leading Triple R uranium deposit - and is headquartered in Kelowna , British Columbia.  Fission's common shares are listed on the TSX Exchange under the symbol "FCU" and trade on the OTCQX marketplace in the U.S. under the symbol "FCUUF."

ON BEHALF OF THE BOARD

"Ross McElroy"


Ross McElroy , President and CEO

Cautionary Statement:
Certain information contained in this press release constitutes "forward-looking information", within the meaning of Canadian legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or "has the potential to". Forward looking statements contained in this press release may include statements which involve known and unknown risks and uncertainties which may not prove to be accurate. Actual results and outcomes may differ materially from what is expressed or forecasted in these forward-looking statements. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Among those factors which could cause actual results to differ materially are the following: risks related to the Offering, risks related to Fission's limited business history, risks related to the nature of mineral exploration and development, discrepancies between actual and estimated mineral resources, risks related to uranium market price volatility, risks related to the market value of the common shares of Fission, risks related to market conditions, risks related to the novel coronavirus (COVID-19) pandemic, including disruptions to the Company's business and operational plans, risks related to the global economic uncertainty as a result of the novel coronavirus (COVID-19) pandemic and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR at www.sedar.com . The forward-looking statements included in this press release are made as of the date of this press release and the Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.

SOURCE Fission Uranium Corp.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/August2021/31/c6818.html

News Provided by Canada Newswire via QuoteMedia

The Conversation (0)
AuKing Mining

Option to Acquire Niobium/REE Project in British Columbia, Canada

AuKing Mining Limited (ASX: AKN) is pleased to announce the proposed acquisition of a 100% interest in the Myoff Creek Niobium/REE project in British Columbia, Canada.

Keep reading...Show less
GTI Energy

Lo Herma Resource Drilling Permitted – Rig Mobilising to Site

GTI Energy Ltd (GTI or Company) is pleased to provide an update on the upcoming resource expansion drilling program at the Lo Herma ISR uranium project in Wyoming’s Powder River Basin (PRB). All permits, bonds and access arrangements are now in place allowing a mud rotary drill rig to mobilise to site and commence drilling within the next 48 hours.

Keep reading...Show less

Laramide Announces the Appointment of Vice-President for Operations and Strategic Planning, U.S. and Provides Update on Drilling Activity in Australia

Laramide Resources Ltd. ("Laramide" or the "Company") (TSX: LAM) (ASX: LAM) (OTCQX: LMRXF), a uranium mine development and exploration company with globally significant assets in the United States and Australia is pleased to announce the appointment of Mr. Josh Leftwich as Vice-President for Operations and Strategic Planning, U.S.A. Mr. Leftwich's substantive professional expertise will be instrumental in advancing Laramide's U.S. uranium assets through development and into production.

Laramide Resources Ltd. Logo (CNW Group/Laramide Resources Ltd.)

Mr. Josh Leftwich's career includes a role as Director of Radiation Safety and Licensing, reporting directly to the President of Cameco. At Cameco, he was a key senior manager in charge of operational compliance and oversight of three mine operations and seven development projects. He was the key contact for all tribal relations which required development and administering of policy processes, as well, he was the key regulatory contact for all state and federal communications including the Nuclear Regulatory Commission (NRC).

His other relevant uranium mining company experience includes negotiating complex regulatory issues at Uranium Energy Corp. (UEC); and, as a key component of the initial start-up team at Mestena Uranium (now The Alta Mesa Project owned by enCore Energy and Boss Energy), he was responsible for all permitting activities including demonstrating and communicating groundwater restoration capabilities and establishing health, safety and environmental/radiation programs from greenfield to production.

"We are very pleased to welcome Josh to Laramide Resources and back to the uranium industry where he began his career," said Marc Henderson , CEO and President of Laramide Resources Ltd. "Each of our U.S. projects are development stage with significant resources and can make a meaningful contribution to future US domestic uranium production, which is now a bipartisan US government objective.  This political backdrop should provide a tailwind for our assets and Josh's skills will enhance our progress towards achieving our aggressive development timeline."

Westmoreland Uranium Project Drilling Update

Drilling at the Westmoreland project is proceeding well with the first three of seven planned diamond holes at the Amphitheatre prospect now completed. Initial core sampling of shallow mineralised zones is underway, guided by downhole gamma probe and handheld scintillometer data. The first samples are being prepared for delivery next week to ALS Laboratories.

The first five drillholes at Amphitheatre are targeting immediate extensions of the known mineralisation and to understand any structural controls.  The last two holes planned for this study at Amphitheatre will be to step out and to test over 300m to the north under alluvial cover to get a sense of the potential scale of this project.

As part of the 2024 resource extension program, a second drill rig will arrive later this month to commence drilling at Huarabagoo and Junnagunna to test whether the zones between these two deposits can be linked. The combined program will comprise 10,000 to 12,000 meters over 100 drillholes and includes the satellite deposit at Long Pocket with an objective of expanding and updating the Westmoreland Mineral Resource Estimation.

Qualified/Competent Person
The information in this announcement relating to Exploration Results is based on information compiled or reviewed by Mr. Rhys Davies , a contractor to the Company. Mr. Davies is a Member of The Australasian Institute of Geoscientists and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the JORC 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves', and is a Qualified Person under the guidelines of the National Instrument 43-101. Mr. Davies consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

Follow us on Twitter @LaramideRes

About Laramide Resources Ltd.:

Laramide is focused on exploring and developing high-quality uranium assets in Australia and the western United States . The company's portfolio comprises predominantly advanced uranium projects in districts with historical production or superior geological prospectivity. The assets have been carefully chosen for their size, production potential, and the two large projects are considered to be late-stage, low-technical risk projects.

The Westmoreland project in Queensland, Australia , is one of the largest uranium development assets held by a junior mining company. This project has a PEA that describes an economically robust, open-pit mining project with a mine life of 13 years.  Additionally, the adjacent Murphy Project in the Northern Territory of Australia is a greenfield asset that Laramide strategically acquired to control the majority of the mineralized system along the Westmoreland trend.

In the United States , Laramide's assets include the NRC licensed Crownpoint-Churchrock Uranium Project. An NI 43-101 PEA study completed in 2023 has described an in-situ recovery ("ISR") production methodology. The Company also owns the La Jara Mesa project in the historic Grants mining district of New Mexico and an underground project, called La Sal, in Lisbon Valley, Utah.

This press release contains forward-looking statements. The actual results could differ materially from a conclusion, forecast or projection in the forward-looking information. Certain material factors or assumptions were applied in drawing a conclusion or making a forecast or projection as reflected in the forward-looking information.

SOURCE Laramide Resources Ltd.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2024/18/c9054.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Skyharbour Resources CEO Jordan Trimble.

Skyharbour Resources CEO Unveils Drilling Plans for Flagship Uranium Projects in Athabasca Basin

In a recent interview with the Investing News Network, Jordan Trimble, president and CEO of Skyharbour Resources (TSXV:SYH), shared exciting developments in the company's uranium exploration efforts and offered valuable insights on the current state of the uranium market.

Trimble highlighted significant progress at Skyharbour's two core projects: Russell Lake and Moore Lake. At Russell Lake, the company has made what Trimble described as a "breakthrough discovery" in its initial drilling program.

"Within the first few holes at the Russell project, we've intersected something quite significant, indicating a high-grade zone of uranium mineralization," he said, emphasizing the potential of this early stage find.

Keep reading...Show less

Global Atomic Announces the Credit Committee Meeting to Review the Dasa Funding Opportunity has been Postponed

Global Atomic Corporation ("Global Atomic" or the "Company"), (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) reports that the presentation of the debt financing facility to the Credit Committee of a U.S. Development Bank has been postponed to August.  The Bank decided not to bring this project to the Credit Committee in July, citing a need to answer and confirm additional questions.

With approval by the Credit Committee postponed, final approval by the Bank's Board of Directors is now expected in October 2024 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×