high density graphite block

Nexus Gold Targeting Program Underway at the McKenzie Gold Project, Red Lake, Ontario

(TheNewswire)



Nexus Gold Corp. (" Nexus " or the " Company ") (TSXV:NXS ) ( OTC:NXXGF ) ( FSE:N6E), is pleased to report in an effort to guide upcoming drill plans that it has begun a prospecting and targeting program at the McKenzie Gold Project, located in Red Lake, Ontario, Canada

The prospecting program is primarily focused on the northern shores of Perch Lake in the St. Paul's Bay area of the 1,400-ha project and is designed to explore and confirm the extension of mineralization previously identified by the company in its spring 2021 diamond drill program.

The current program has already generated positive results with the prospecting team identifying mineralization in two previously unknown trenches (see Map 1).  Mineralization within these trenches consists of quartz veins containing clots and patches of semi massive Chalopyrite, Pyrite and Molybdenite.  The veins are hosted in granite which displays strong pervasive silica flooding.  Local discrete shearing in both trenches trend at approximate attitudes of 330 ° and dip 70 ° to 80 ° to the east, displaying similar trends as were observed in the spring drilling campaign.  The trenches are located on the northern shore of the Perch Lake and extend the known mineralization some 400 meters to the north and north-west.

"This is a terrific start to our program as this newly identified mineralization will greatly aid us in designing our upcoming drill programs," said VP Exploration, Warren Robb.  "It appears that the mineralization identified in our drilling to date is trending north-northwest and our prospecting efforts have now doubled the length of this mineralization to over 800 meters along strike," continued Mr. Robb.


Click Image To View Full Size

Samples from this program have been forwarded to the lab for analysis.  Once assay results are received and verified plans will be finalized for an up to 2000-meter, phase three diamond drill program scheduled for Q4 of this year.

Drilling in 2020 and 2021 in the St. Paul's Bay area of the McKenzie project has so far outlined a broad zone of mineralization defined by combination of significant higher grade intercepts and lengthier runs of sub two grams-per-tonne ("g/t") gold ("Au").   Highlighted drill results include:

  • - Hole MK-20-006, which intercepted 13.25 g/t Au over 2.75m, including 36.2 g/t Au over 1m

    - MK-20-008 reported .62 g/t Au over 117.5m, including 1 g/t Au over 55m

    - MK-21-018 intercepted 56m of 1.01 g/t Au (including 21.5m of 1.84 g/t Au, and 10m of 3.30 g/t Au)

    - MK-21-018 also featured 37.6m of 2.78 g/t Au (including 24.7m of 4.05 g/t Au and 8m of 12.04 g/t Au)

    - MK-21-018 included high-grade intervals of 23.10 g/t Au over 1m and 94.20 g/t Au over 1m.   The entire length of the hole averaged .99 g/t Au over 198m

    - MK-21-019 returned 136.5m of 1.25 g/t Au (including 44.9m of 3.00 g/t Au and 15.5m of 5.25 g/t Au)

    - MK-21-019 also featured 29.4m of 1.82 g/t Au (including 6m of 5.45 g/t Au)

    - MK-21-019 included high-grade intervals of 59.8 g/t Au over 1m, 15.5 g/t Au over 1m and 26.7 g/t Au over 1m.  The entire length of the hole averaged .74 g/t Au over 283.4m, ending in mineralization

For a complete table of Nexus drill results at McKenzie, please visit the project section of www.nxs.gold .

All reported holes were drilled entirely in a granitic rock of the Dome stock and displayed patchy moderate-to-strong silica alteration. Silica altered intervals are typically associated with high density micro-fracturing and increased molybdenite and chalcopyrite mineralization. Fine-grained fluorescent scheelite was also observed. The granite was strongly magnetic, containing 2-3% fine-grained disseminated magnetite.

About the McKenzie Gold Project

The 100%-owned McKenzie Gold Project is an approximately 1,400-hectare gold exploration project located in the heart of the historic Red Lake gold camp, in western Ontario, Canada.  Areas of high-grade gold mineralization have been established within the northern portion of the claim block (McKenzie Island), with significant gold values having been drilled along a 600-meter strike in the southern portion of the property (St. Paul's Bay area).

Numerous high-grade historical samples^ have been recovered on the property, including 331.14 g/t Au, 212.8 g/t Au, and 313 g/t Au.  In the summer of 2019, the Company conducted it's first ground reconnaissance program at McKenzie and results returned notable sample assays, including 135.4 g/t Au and 9.3 g/t Au (see Company news releases dated June 25, 2019, and October 11, 2019).

Additional high-grade historical grab samples^ previously unknown to the Company and revealed in a report supplied by Rimini Exploration include several high-grade assays, including 142.49 g/t Au, 115.2 g/t Au, 114.57 g/t Au, 93.71 g/t Au, 68.03 g/t Au, 53.01 g/t Au, and 16.65 g/t Au from areas located on McKenzie Island (north block) (see Company news release dated October 11, 2019).

Results from the Company's initial summer 2020 drill program returned values similar to historic drilling in the area, which have been typically higher-grade intercepts over narrow widths (i.e., 0.5m to 1m of > 5 g/t Au).  In addition, a second style of gold mineralization was discovered on the McKenzie property.  These lengthy (> 100m) disseminated, sub and near one-gram gold intercepts more closely resemble the type of mineralization being explored by Premier Gold at the Hasaga Project, located approximately 5kms east of the McKenzie project ground.

Premier Gold's Hasaga Property is host to the past-producing Hasaga and Gold Shore Mines and is strategically located proximal to the Balmer-Confederation regional unconformity, recognized as an important geologic feature at the multi-million ounce past and currently producing Red Lake area mines.  The deposits on the Hasaga Project are estimated as hosting an Indicated mineral resource of  1,123,900 ounces of gold with an average grade 0.83 g/t Au. *


Click Image To View Full Size

Map 2: McKenzie Gold Project, Red Lake, Ontario

^ Grab samples are selected samples and are not necessarily representative of mineralization hosted on the property

* Reported lengths are intercepts and are not true widths

* HASAGA PROJECT RED LAKE MINING DISTRICT, ONTARIO, CANADA NTS MAP SHEETS 52K/13 AND 52N/04 by Vincent Jourdain (Ph.D., P.Eng.), John Langton (M.Sc., P. Geo.) & Abderrazak Ladidi (P.Geo.) dated February 24 th , 2017).

Warren Robb P.Geo., Vice President, Exploration, is the designated Qualified Person and has reviewed and approved the technical information contained in this release.  The historic drill data contained in this release was verified by the QP by comparing reported assay data with Certificates of Analysis documented. The QP has verified mineral showings and areas of select sampling and the collars of reported historic drill hole locations.  It is the QP's opinion that the data as presented is adequate and can be relied upon for use in this press release.

About the Company

Nexus Gold is a Canadian-based gold exploration and development company with an extensive portfolio of projects in Canada and West Africa. The Company's primary focus is on its 100%-owned, 98-sq km Dakouli 2 Gold Concession in Burkina Faso, West Africa, and the approximately 1400-ha McKenzie Gold Project, located in Red Lake, Ontario. The Company is developing its core assets while seeking joint-venture, earn-in, and strategic partnerships for other projects in its portfolio.

For more information, please visit nxs.gold

On behalf of the Board of Directors of

Nexus Gold CORP.

Alex Klenman

President & CEO

604-558-1920

info@nexusgoldcorp.com
www.nexusgoldcorp.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statement or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements, except as required by applicable laws.

Copyright (c) 2021 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

The Conversation (0)
larry lepard, gold, silver, bitcoin

Lawrence Lepard: "Big Print" Coming — Fully Expect US$5,000 Gold, US$200,000 Bitcoin

Speaking to the Investing News Network, Lawrence Lepard, managing director at EMA, voiced his thoughts on the outlook for gold and Bitcoin as the debt doom loop intensifies in the US.

"I call it a doom loop — it's a vicious circle in the wrong direction, which I believe will ultimately lead to the government having to say, 'Okay, this isn't going to work. We are going to institute yield curve control or QE, or we're going to buy the bonds,'" he explained on the sidelines of the New Orleans Investment Conference.

Lepard believes it's important to hold both gold and Bitcoin, noting that the only wrong allocation is zero.

Keep reading...Show less
Chris Temple, uranium symbol and gold bars.

Chris Temple: Gold's Next Leg Higher, Plus Uranium and Natural Gas in 2025

Chris Temple, founder, editor and publisher of the National Investor, outlined the main factors he sees impacting the gold price heading into 2025, saying the yellow metal will undoubtedly move higher.

In his view, its rise will come as market participants realize how many problems the US economy is facing.

"I think that once that reality sets in, gold will get its next big lease on life and the stock market is going to bog down. I think we're going to see a lot of rotation in the market that will start to favor real assets and real value — away from everybody chasing the same relative handful of stocks as we've seen," Temple explained.

Keep reading...Show less
Gold bars stacked in ascending order.

WGC: Gold to Face Complex Drivers in 2025, Price Likely to Cool After Record-Breaking Year

The World Gold Council (WGC) has released its 2025 gold outlook, highlighting various macroeconomic factors, geopolitical risks and central bank activity as pivotal forces influencing demand and prices.

While 2024 saw gold achieve a stellar performance with a 28 percent annual increase, the outlook for 2025 is characterized by a mix of opportunities and challenges stemming from both global and regional developments.

The yellow metal has benefited from its historical role as a hedge against uncertainty, but the WGC forecasts that its performance next year will depend on other key variables as well.

Keep reading...Show less
Brightstar Resources Managing Director Alex Rovira.

Increased M&A Activity a Win-Win for Gold Sector, Brightstar Resources Exec Says

Following the completion of its acquisition of Alto Metals, Brightstar Resources (ASX:BTR) plans to conduct 50,000 metres of reverse-circulation and diamond drilling, beginning next year, at Alto Metals' approximately 900 square kilometre Sandstone gold project in Western Australia.

In an interview with the Investing News Network, Brightstar Managing Director Alex Rovira outlined the next steps for merging Alto Metals with Brightstar’s assets and the strategy for moving forward.

“From an exploration perspective … it's really focusing on the Sandstone package. We will do near-mine brownfields exploration at our Menzies and Laverton gold projects. And really, the aspiration there is to take a number of those mines toward development decisions,” he said.

Keep reading...Show less
Horizon Minerals

Horizon Minerals

Keep reading...Show less

Agnico Eagle and O3 Mining Welcome Gold Fields' Support of Their Friendly Premium Transaction

(All amounts expressed in Canadian dollars unless otherwise noted)

Agnico Eagle Mines Limited (NYSE: AEM) (TSX: AEM) (" Agnico Eagle ") and O3 Mining Inc. (TSXV: OIII) (OTCQX: OIIIF) (" O3 Mining ") are pleased to jointly announce that Gold Fields Limited, through a 100% indirect Canadian subsidiary (" Gold Fields "), O3 Mining's largest shareholder, has agreed to a lock-up agreement with Agnico Eagle to tender its common shares of O3 Mining (" Common Shares ") into Agnico Eagle's offer to acquire all of the outstanding Common Shares for $1.67 per Common Share in cash by way of a take-over bid (the " Offer "). See O3 Mining and Agnico Eagle's joint news release of December 12, 2024 for a detailed description of the Offer. A copy of the December 12, 2024 joint news release is available at: https:www.agnicoeagle.comEnglishinvestor-relationsnews-and-eventsnews-releasesnews-release-details2024Agnico-Eagle-to-Acquire-O3-Mining-in-Friendly-Transactiondefault.aspx .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×