Locksley Resources Limited  Commences EOI for Scoping Study at the Desert Antimony Mine

Locksley Resources Limited Commences EOI for Scoping Study at the Desert Antimony Mine

Perth, Australia (ABN Newswire) - Locksley Resources Limited (ASX:LKY,OTC:LKYRF) (FRA:X5L) (OTCMKTS:LKYRF) advised that it has formally commenced the engineering partner selection process for the upcoming engineering scoping pilot plant design , following direct engagement with Tier 1 U.S. engineering service providers.

HIGHLIGHTS

- Expression of Interest (EOI) issued to Tier 1 U.S. engineering firms to lead the upcoming Scoping Engineering Design for the Desert Antimony Mine pilot plant

- Study to integrate ongoing metallurgical optimisation, enabling concurrent advancement of engineering design and processing flowsheets

- Partner selection to prioritise U.S. based capability, permitting familiarity and alignment with domestic critical mineral policy

- Critical step in Locksley's U.S. mine to market strategy, progressing toward commercial antimony production and downstream material readiness

- Supports U.S. government initiatives to rebuild domestic antimony processing capability and reduce reliance on foreign supply chains

- Locksley is well funded for 2026 work programs with over $20 million in cash

In October 2025, the Company's Chief Operating Officer met with senior executives from several leading U.S. based engineering firms to align on study objectives, execution strategy and the availability of local capability to support an accelerated project development pathway. These engagements have now progressed to the formal issuance of an Expression of Interest (EOI) to a shortlist of selected Tier 1 groups.

Strong response from Tier 1 Engineering Firms

The response to the EOI has been highly encouraging, with proponents recognising Locksley's well structured development strategy and the Project's alignment with U.S. federal priorities to rebuild domestic critical mineral supply chains.

Respondents also acknowledged the Company's disciplined approach to early technical de-risking and pragmatic study execution, consistent with best practice project development frameworks.

A core objective of the EOI process is to assess each firm's demonstrated experience operating in San Bernardino County, including regulatory engagement, permitting pathways and stakeholder management. This regional experience is considered an essential requirement for ensuring timely delivery of the subsequent project phases.

Integrated Metallurgical and Engineering Workstreams

In parallel with the EOI, ongoing metallurgical optimisation work continues to refine processing flowsheets, improve recoveries and validate key mass balance assumptions.

These outcomes will directly inform the engineering basis, enabling the Company to advance both study and metallurgical workstreams concurrently. This integrated approach is intended to maintain development momentum and support efficient delivery of a technically robust definition process.

Kerrie Matthews, Managing Director & CEO, commented:

"With the completion of our recent capital raise we are fast tracking our 2026 initiatives. We are now engaging with leading U.S. engineering firms as an Expression of Interest. The strong response to our Expression of Interest highlights confidence in our development strategy and confirms that we have access to the technical capability and local U.S. experience required to advance the Project efficiently.

Our ongoing metallurgical optimisation work will feed directly into the scoping study, allowing engineering design, economic evaluation and project planning to progress without delay. This integrated execution strategy ensures the Desert Antimony Project continues to advance at speed toward the next stage of development.

Next Steps:

- Evaluation of EOI submissions, including review of technical expertise and local operating experience

- Issuance of a formal Request for Proposal (RFP) for the PFS and site investigation scopes by mid-Q1 2026

- Award of professional services contracts in separable work packages, with processing related scopes targeted for award by the end of Q1 2026 and mine engineering packages timed to align with upcoming exploration outcomes at the Desert Antimony Mine Project

To view the video: An overview of the Desert Antimony mine to market plan and key deliverables for downstream processing capability, please visit:
https://www.abnnewswire.net/lnk/6STFWM5K



About Locksley Resources Limited:

Locksley Resources Limited (ASX:LKY,OTC:LKYRF) (FRA:X5L) (OTCMKTS:LKYRF) is an ASX listed explorer focused on critical minerals in the United States of America. The Company is actively advancing exploration across two key assets: the Mojave Project in California, targeting rare earth elements (REEs) and antimony. Locksley Resources aims to generate shareholder value through strategic exploration, discovery and development in this highly prospective mineral region.

Mojave Project

Located in the Mojave Desert, California, the Mojave Project comprises over 250 claims across two contiguous prospect areas, namely, the North Block/Northeast Block and the El Campo Prospect. The North Block directly abuts claims held by MP Materials, while El Campo lies along strike of the Mountain Pass Mine and is enveloped by MP Materials' claims, highlighting the strong geological continuity and exploration potential of the project area.

In addition to rare earths, the Mojave Project hosts the historic "Desert Antimony Mine", which last operated in 1937. Despite the United States currently having no domestic antimony production, demand for the metal remains high due to its essential role in defense systems, semiconductors, and metal alloys. With significant surface sample results, the Desert Mine prospect represents one of the highest-grade known antimony occurrences in the U.S.

Locksley's North American position is further strengthened by rising geopolitical urgency to diversify supply chains away from China, the global leader in both REE & antimony production. With its maiden drilling program planned, the Mojave Project is uniquely positioned to align with U.S. strategic objectives around critical mineral independence and economic security.

Tottenham Project

Locksley's Australian portfolio comprises the advanced Tottenham Copper-Gold Project in New South Wales, focused on VMS-style mineralisation



Source:
Locksley Resources Limited



Contact:
Kerrie Matthews
Chief Executive Officer
Locksley Resources Limited
T: +61 8 9481 0389
Kerrie@locksleyresources.com.au

News Provided by ABN Newswire via QuoteMedia

LKY:AU
The Conversation (0)
High-Grade Antimony Assays Confirm Surface Continuity at DAM

High-Grade Antimony Assays Confirm Surface Continuity at DAM

Locksley Resources (LKY:AU) has announced High-Grade Antimony Assays Confirm Surface Continuity at DAMDownload the PDF here. Keep Reading...
LKY Commences Diamond Drilling at Desert Antimony Mine

LKY Commences Diamond Drilling at Desert Antimony Mine

Locksley Resources (LKY:AU) has announced LKY Commences Diamond Drilling at Desert Antimony MineDownload the PDF here. Keep Reading...
Underground Mapping Reveals Major New Target at Mojave

Underground Mapping Reveals Major New Target at Mojave

Locksley Resources (LKY:AU) has announced Underground Mapping Reveals Major New Target at MojaveDownload the PDF here. Keep Reading...
High Grade Antimony Results from Batch Sampling Program

High Grade Antimony Results from Batch Sampling Program

Locksley Resources (LKY:AU) has announced High Grade Antimony Results from Batch Sampling ProgramDownload the PDF here. Keep Reading...
Quarterly Activities Report and Appendix 5B

Quarterly Activities Report and Appendix 5B

Locksley Resources (LKY:AU) has announced Quarterly Activities Report and Appendix 5BDownload the PDF here. Keep Reading...
Brixton Metals Drills 6,199 g/t Silver over 1.00 m including 0.50 m of 12,386 g/t Silver in Hole 432 at its Langis Project in Ontario

Brixton Metals Drills 6,199 g/t Silver over 1.00 m including 0.50 m of 12,386 g/t Silver in Hole 432 at its Langis Project in Ontario

Hole 399: 4.60 m of 503 g/t Silver Hole 408: 7.00 m of 290 g/t Silver including 2.00 m of 958 g/t Silver Brixton Metals Corporation (TSX-V: BBB, OTCQX: BBBXF) (the "Company" or "Brixton") is pleased to report additional silver results from 33 holes at its wholly owned Langis Silver Project,... Keep Reading...
GoldInxs Announces Completion of Field Program at Millar Property in British Columbia's Golden Triangle

GoldInxs Announces Completion of Field Program at Millar Property in British Columbia's Golden Triangle

GoldInxs Mining Corp. ("GoldInxs," or the "Company") (TSXV: INXS,OTC:INXGF) is pleased to announce the successful completion of a helicopter-supported field program at the Company's Millar Project, a 345-hectare exploration property located within British Columbia's world-renowned Golden... Keep Reading...
Omega Pacific Williams Property Exploration Program Update

Omega Pacific Williams Property Exploration Program Update

Omega Pacific Resources Ltd. (CSE: OMGA,OTC:OMGPF) (OTCQB: OMGPF) (FSE: Q0F) ("Omega Pacific" or the "Company") is pleased to provide an update on its 2026 exploration program at the Williams Property ("Williams"), located in British Columbia's Toodoggone District.Omega Pacific completed its... Keep Reading...
Apollo Silver Announces Chief Financial Officer Transition

Apollo Silver Announces Chief Financial Officer Transition

Steven Thomas Appointed CFO Effective September 1, 2026 Apollo Silver Corp. ("Apollo Silver" or the "Company") (TSX-V: APGO, OTCQB: APGOF, Frankfurt: 6ZF) announces the appointment of Steven Thomas as Chief Financial Officer ("CFO"), effective September 1, 2026. Mr. Thomas succeeds Chris Cairns,... Keep Reading...
Lahontan Drills 10.7m Grading 1.81 g/t Au and 64.8 g/t Ag, Completes Santa Fe Mine Stockpile Drill Program

Lahontan Drills 10.7m Grading 1.81 g/t Au and 64.8 g/t Ag, Completes Santa Fe Mine Stockpile Drill Program

Lahontan Gold Corp. (TSXV:LG,OTC:LGCXF, OTCQB:LGCXF, FSE:Y2F) (the "Company" or "Lahontan") is pleased to announce additional results from its 2026 Sonic core drilling program at the Santa Fe Mine Project. The Sonic drilling campaign is evaluating historic heap leach pads and stockpiles to... Keep Reading...
Goldgroup Files Second Quarter 2026 Financial Results and Provides Update on Combined Company

Goldgroup Files Second Quarter 2026 Financial Results and Provides Update on Combined Company

Javier Reyes Appointed Chief Executive Officer by Unanimous Decision of the Board of Directors Cash Balance US $59 Million and Zero Debt Goldgroup Mining Inc. (TSXV: GORO) (NYSE American: GORO) (FSE: 55G) ("Goldgroup" or the "Company") is pleased to announce that it has filed its financial... Keep Reading...

Interactive Chart

Latest Press Releases

Related News