Galan Lithium Limited (ASX: GLN) (Galan or the Company) is pleased to provide a further update on the progress of construction activities at its 100% owned Hombre Muerto West (HMW) Phase 1 lithium brine project, with lithium chloride production expected in H1 2025. The above demonstrates Galan’s continued activity and progress in advancing its low cost, high grade HMW project to production in a timely manner.


Highlights:

  • Pond 1 earthworks almost complete
  • Pond 1 liner installation commenced (5% completion)
  • Fill of pond 1 in Q1, 2024; evaporation process to commence this summer, this is the first major step of the long-term production schedule
  • Pond 2 earthworks construction underway (10% completion)
  • 9 production wells now constructed (and ongoing); Phase 1 production only requires 6 wells
  • HMW Project is a tier one project that will produce a premium high grade lithium chloride (LiCl) concentrate of 6% Li, comparable to 13% Li2O or 32% Lithium Carbonate Equivalent (LCE) in H1 2025
  • Low all-in sustaining costs; HMW in the 1st quartile of lithium industry’s cost curve with an initial reserve estimate of 40 years
  • Updated resource estimate due in Q1 2025
  • Glencore site visit being planned as part of due diligence

As previously announced, the HMW project was separated into four production phases. The initial Phase 1 Definitive Feasibility Study (DFS) focused on the production of 5.4ktpa LCE of a lithium chloride concentrate by H1 2025, as governed by the approved production permits. The Phase 2 DFS targets 21ktpa LCE of a lithium chloride concentrate in 2026, followed by Phase 3 production of 40ktpa LCE by 2028 and finally a Phase 4 production target of 60ktpa LCE by 2030. Phase 4 will include lithium brine sourced from both HMW and Galan’s other 100% owned project in Argentina, Candelas. The very positive Phase 2 DFS results were announced on 3 October 2023 (https://wcsecure.weblink.com.au/pdf/GLN/02720109.pdf).

Galan’s Managing Director, Juan Pablo (JP) Vargas de la Vega, commented:

“The commencement of the installation of liners for Pond 1 is another tick in the box for the HMW Phase 1 construction team. The team continues to push forward on all fronts as it aims to validate Galan’s low- cost, low-risk lithium chloride development strategy to become the next lithium producer in Argentina in H1 2025.”

Liner installation process

Liner installation commencement

Overall progression of liner installation on Pond 1

The brine well field is located in the same area as the HMW ponds system. The wells field for Phases 1 and 2 are exclusively located in the Rana de Sal, Del Condor, Deceo III, Pata Pila, Casa del Inca III & IV, and Santa Barbara XXIV mining tenements. The HMW Project also has several tenements (including Catalina) with great potential to further increase the quantity and quality of the brine resources, which may result in additional production.

In total, there are 23 production wells required for Phases 1 and 2. Ongoing drilling to date, shows that Galan has completed nine (9) wells with only six (6) being required for phase 1 production.


Click here for the full ASX Release

This article includes content from Galan Lithium, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

GLN:AU
Galan Lithium

Galan Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Galan Lithium

A$14 Million Capital Raise for Continued Ongoing Development of HMW Phase 1

Galan Lithium Limited (ASX: GLN) (Galan or the Company) is pleased to announce that it has received firm commitments for an equity raising of A$14 million to institutional, sophisticated and professional investors (Placement) at A$0.23 per share.

Keep reading...Show less
White Cliff Minerals

Priority Targets Confirmed at Great Bear Lake (Radium Point) U-Cu- Au-Ag Project in Readiness for Field Activities to Commence

Ongoing data digitisation reveals additional high priority targets

White Cliff Minerals Limited (“the Company”) (ASX: WCN) is pleased to provide an update on its activities as it prepares for its upcoming maiden field campaign in Northwest Territories and Nunavut, Canada. The Company has now prioritised a number of highly prospective targets, which includes additional targets from the initial review of the southern half of the Great Bear Lake Project, Northwest Territories, as new areas are realised through the digitisation and GIS integration of historic datasets.

Keep reading...Show less
Lithium periodic symbol standing upright next to lithium metal.

Top 9 Lithium-producing Countries (Updated 2024)

Interest in lithium continues to grow due to its role in the lithium-ion batteries that power electric vehicles (EVs). As a result, more and more attention is landing on the top lithium-producing countries.

About 80 percent of the lithium produced globally goes toward battery production, but other industries also consume the metal. For example, 7 percent of lithium is used in ceramics and glass, while 4 percent goes to lubricating greases.

According to the US Geological Survey, lithium use in batteries has increased in recent years due to the use of rechargeable batteries in portable electronic devices, as well as in electric tools, EVs and grid storage applications.

Keep reading...Show less
 Lancaster Resources President and CEO Penny White.

Lancaster Resources Progresses Permitting for Alkali Flat Lithium Project

Lancaster Resources (CSE:LCR,OTCQB:LANRF,FWB:6UF0) is gearing up to drill an exploration well at its Alkali Flat lithium brine project in New Mexico following the receipt of a technically complete letter from the New Mining and Minerals Division pertaining to its permit application.

“Hopefully we can get started within the next 30 to 60 days,” said CEO Penny White. “Basically we'll be doing our exploratory well, which is really just a drill that will go down about 700 meters. And what we'll be able to do is explore that to really interesting targets that we've delineated through all of our exploratory work to date, and one is about 100 meters down.”

White explained that the Alkali Flat project is a compelling asset due to its high lithium concentrations and potential for environmentally friendly production methods.

Keep reading...Show less
Galan Lithium

Galan Builds Inventory with 1,000t LCE, Advances HMW Project

Galan Lithium (ASX:GLN) reported a contained inventory of 1,000 tons of lithium carbonate equivalent (LCE) at its Hombre Muerto West (HMW) project in Argentina, according to an article by The West Australian.

Keep reading...Show less
Atlantic Lithium (ASX:A11)

Atlantic Lithium


Keep reading...Show less
Galan Lithium

Galan Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×