Lithium

Foremost Lithium Resource & Technology Ltd. (CSE: FAT) (OTCQB: FRRSF) (FSE: F0R0) (WKN: A3DCC8) (www.foremostlithium.com) ("Foremost Lithium, Foremost or the Company") is pleased to announce that it has commenced preparations for a winter diamond drill program on its 100% owned 2,476 acre1,002 hectare Jean Lake Lithium Property situated in the mine-friendly district of Snow Lake, Manitoba. The drill targets will include the high-grade spodumene-bearing Beryl pegmatite dykes where grab sample assays of 3.89% and 5.17% Li2O were received from pegmatite dyke B1 and 3.81%, 4.09% and 4.74% Li2O from pegmatite dyke B2 in August 2021. Elsewhere on the property coincident drone ("UAV" or Unmanned Aerial Vehicle) magnetic lows with coincident anomalous responses for lithium, cesium, rubidium, and niobium in soil samples analyzed with Mobile Metal Ion Technology (MMI) will be drill tested.

The linear trend of magnetic lows defined on the Jean Lake property by the UAV-borne survey are interpreted as the magnetic signature of the coarse spodumene-bearing Sherritt Gordon #1 and #2 and the Grass River pegmatite dykes currently being explored and developed by Snow Lake Resources Ltd. There are also linear trends of magnetic lows associated with the high-grade Beryl pegmatites which will be drill tested.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4689/140680_a21ad187e426699f_001.jpg

Figure 1 - Magnetic image covering the Jean Lake property. The gap in the image is due to the location of Hydroelectric power lines crossing the property. Location B-1 assayed 3.89% Li2O connects with target 11; and Location B2 (red circle) assayed 5.17% Li2O and connects with target 10

To view an enhanced version of Figure 1, please visit:
https://images.newsfilecorp.com/files/4689/140680_a21ad187e426699f_001full.jpg

The UAV-borne magnetic surveys were flown by EarthEx Geophysical Solutions Inc. (Selkirk, Manitoba) with financial support from the Manitoba Mineral Development Fund. MMI analyses were undertaken in the laboratories of SGS Canada Inc. Burnaby (B.C.).

Daniel Card, President of EarthEx Geophysical Solutions Inc., states, "It is encouraging to see the coincidence of high-quality UAV-assisted magnetic responses with geochemical anomalies from the Jean Lake property. The combination of these two datasets makes for compelling drill targets."

The drill program will be staged from a base in Snow Lake with helicopter support from Gogal Air Services. Assay samples from drill core will be shipped to Activation Laboratories ("ACTLABS"; Ancaster, Ontario) for lithium and related element analysis using analytical approach UT-7 after a total sodium peroxide fusion.

Jason Barnard, Director at Foremost states, "The high-grade samples from the Beryl pegmatite dykes of 3.89 and 5.17% Li2O from pegmatite dyke B1 and the samples of 3.81, 4.09 and 4.74% Li2O from pegmatite dyke B2 on our Jean Lake Lithium Property was an exciting development through our exploration program. With continued prospecting including drone assisted airborne geophysics, Foremost is moving into a planned drill program with defined, and de-risked targets. I look forward to our next phase upon commencement of drilling."

Quality Assurance and Quality Control Protocols

Foremost Lithium has established a collection, preparation, and analysis monitoring system that follows industry best practices including quality assurance and quality control programs and formal chain of custody procedures.

Rock samples are described in the field and then reduced to fist-sized fragments or less. After logging drill core are sawn in half with one half of the core retained in the core box. Both rock chips and sawn core are placed into pre-labeled sample bags and stored in sealed and labeled vinyl pails prior to shipping.

Rock and core samples are submitted for sample preparation to Activation Laboratories Ltd. (Actlabs) located in Ancaster, Ontario. Samples are crushed with up to 80% passing 2 mm, riffle split into 250-gram aliquots and pulverized using mild steel to 95% passing 105 microns. Gold is determined by Instrumental Neutron Activation (INAA) with over-range assays by fire assay on a 30-gram sample. For samples with visible gold, analysis is by metallic screen assay. Samples for lithium and related elements are analysed by ICP-MS using Actlabs package "UT-7" after a sodium peroxide fusion. Activation Laboratory's In-house quality assurance and quality control protocols are supplemented by Foremost Lithium's standards, blanks and field duplicate samples which are inserted into the sample stream at regular intervals. These standards comprise approximately 10% of the total number of samples. Accuracy, precision, and contamination are routinely monitored.

Technical information relating to the Jean Lake Property contained in the news release has been approved by Lindsay Bottomer, Q.P., P. Geo, who is a "Qualified Person" within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects.

On Behalf of the Board of Directors
Jason Barnard, Director

About Foremost Lithium Resource & Technology Ltd.

Foremost Lithium is a hard-rock exploration company strategically located to capitalize on the world's growing EV appetite and is committed to being a premier supplier of North America's lithium feedstock. As the world transitions towards decarbonization, the company is focused on exploration and growth on its 5 Lithium Lane Projects in Snow Lake Manitoba, and its Hidden Lake Lithium Project in the Northwest Territories. Foremost Lithium also has the Winston Gold/Silver Property in New Mexico USA.

Foremost Lithium Resource &Technology Ltd.
Email: info@foremostlithium.com
Phone: +1 (604) 330-8067

Follow us or contact us on social media:

Twitter: @foremostlithium
Linkedin: https://www.linkedin.com/company/foremost-lithium-resource-technology/mycompany
Facebook: https://www.facebook.com/ForemostLithium

Forward-Looking Statements

This news release contains "forward-looking statements" and "forward-looking information" (as defined under applicable securities laws), based on management's best estimates, assumptions, and current expectations. Such statements include but are not limited to, statements with respect to the plans for future exploration and development of the Company's properties and the acquisition of additional exploration projects. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts", "anticipates" "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims", "potential", "goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or "should" occur. These statements should not be read as guarantees of future performance or results. Such statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from those expressed or implied by such statements, including but not limited to: risks related to the Company's projects; risks related to general economic conditions, actual results of current exploration activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be refined; fluctuations in prices of metals including gold; increases or decreases in market prices of mining consumables, possible variations in resource estimates, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; delays in the completion of exploration, development or construction activities, changes in national and local government regulation of mining operations, tax rules and regulations, changes in applicable laws or stock exchange policies and receipt of any requires regulatory approvals and political and economic developments in areas in which the Company operates. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements and forward-looking information are made as of the date hereof and are qualified in their entirety by this cautionary statement. The Company disclaims any obligation to revise or update any such factors or to publicly announce the result of any revisions to any forward-looking statements or forward-looking information contained herein to reflect future results, events or developments, except as require by law. Accordingly, readers should not place undue reliance on forward-looking statements and information. Please refer to the Company's most recent filings under its profile at www.sedar.com for further information respecting the risks affecting the Company and its business.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/140680

News Provided by Newsfile via QuoteMedia

FAT:CNX
Foremost Lithium

Foremost Lithium


Keep reading...Show less
Andrew Lyons Director and CFO at Foremost Lithium Forfeits His 3 Million PSUs

Andrew Lyons Director and CFO at Foremost Lithium Forfeits His 3 Million PSUs

Andrew Lyons, current director and CFO of Foremost Lithium Resource & Technology Ltd. (CSE: FAT) ("the Company") announces he is forfeiting his total allocated 3 million unvested Performance Share Units (PSUs) pursuant to the Company's Performance Share Unit Plan.

Andrew Lyons will retain his previously awarded and vested 500,000 PSUs.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Foremost Lithium Receives Work Permit to Commence a 3,000 Metre Drill Program on Jean Lake Lithium Property in Snow Lake Manitoba

Foremost Lithium Receives Work Permit to Commence a 3,000 Metre Drill Program on Jean Lake Lithium Property in Snow Lake Manitoba

Highlights

  • The focus of this drill program will be the Beryl Dyke B1 which returned two grab samples assaying 3.89 and 5.17% Li2O, and Beryl Dyke B2 which returned three grab samples assaying 3.81, 4.09 and 4.74% Li2O in addition to linear UAV-assisted magnetic trends overlain by soils with elevated lithium content (see figure 1)

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Foremost Lithium to Sell Interest in Hidden Lake Property for C$3.5 Million

Foremost Lithium to Sell Interest in Hidden Lake Property for C$3.5 Million

Foremost Lithium Resource & Technology Ltd. (CSE: FAT) (OTCQB: FRRSF) (FSE: F0R0) (WKN: A3DCC8) ("Foremost" or the "Company") (www.foremostlithium.com) is pleased to announce that it has signed a binding term sheet with respect to the sale of its 60% interest in the Hidden Lake Project in Yellowknife, NWT for C$3.5 million to an arm's length party.

The Company has received a C$100,000 non-refundable deposit in connection with signing the term sheet. The closing of the transaction and receipt of the remaining C$3.4 million of the purchase price is expected to occur within 30 days, subject to the parties entering into and approving definitive binding documentation, final due diligence by the purchaser, receipt of applicable third-party consents and other customary conditions for a transaction of this nature.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Foremost Lithium Completes Drone Magnetic Survey on 43,000+ Acres of Its Properties in Snow Lake, Manitoba

Foremost Lithium Completes Drone Magnetic Survey on 43,000+ Acres of Its Properties in Snow Lake, Manitoba

Foremost Lithium Resource & Technology Ltd. (CSE: FAT) (OTCQB: FRRSF) (FSE: F0R0) (WKN: A3DCC8) ("Foremost" or the "Company") (www.foremostlithium.com) is pleased to announce that it recently completed a UAV-assisted high-resolution airborne magnetic survey on its "Lithium Lane" Properties near the historic mining town of Snow Lake, west-central Manitoba. Foremost contracted EarthEx Geophysical Solutions Inc. (Selkirk, Manitoba), which flew a total of 7,472.7-line km over the entire 43,031 acre17,414hectares land package.

UAV-Borne Magnetic Surveys
UAV-flown high resolution magnetic data lends itself very well finding new prospective drill targets (Figures 1 and 2 below) with precision using high-resolution UAV more commonly known as a drone. The UAV system's resolution has provided excellent litho-structural detail over all Foremost's Lithium Lane Properties and has generated detailed 3D models of the magnetic sources on the properties. The magnetic survey can provide valuable exploration information such as depth to source, dip of the body as well as the overall shape and morphology of the lithological unit. The resolution of the survey allows targeting of bedrock structures which may host lithium pegmatite deposits, which when coupled with 3D products from inversion of magnetic survey data provides an excellent source of information for Foremost Lithium to define drill-targets on their property based on their magnetic signatures including both magnetic and non-magnetic targets.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Foremost Lithium Announces Amendment of PSU Plan, Cancellations and New Grants of PSUs and Announces Change to Executive Management

Foremost Lithium Announces Amendment of PSU Plan, Cancellations and New Grants of PSUs and Announces Change to Executive Management

Foremost Lithium Resource & Technology Ltd. (CSE: FAT) (OTCQB: FRRSF) (FSE: F0R0) (WKN: A3DCC8) (www.foremostlithium.com) ("Foremost Lithium, Foremost or the Company) announces a number of changes to its Performance Share Unit Plan previously adopted on January 17, 2022 (the "PSU Plan"), and issued and Performance Share Units ("PSUs") outstanding thereunder.

As previously disclosed in the Company's Canadian Securities Exchange filings, during the financial year ended March 31, 2022, the Company had previously granted an aggregate of 15,999,996 PSUs to the Company's board and management.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Provides Update for Winter Drilling Program in Canada's Winnipeg River Pegmatite Region

ACME Lithium Provides Update for Winter Drilling Program in Canada's Winnipeg River Pegmatite Region

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to provide a corporate update at its Shatford, Birse, and Cat-Euclid Lake project areas in the Winnipeg River pegmatite region. ACME's land holdings in southeastern Manitoba comprise approximately 17,000 acres or 70 square kilometres.

ACME completed an extensive summer exploration program employing remote sensing, structural geology, ground-based geological mapping, and geochemical sampling to localize targets for drilling. Our exploration focus is on spodumene-bearing LCT pegmatites that are a source for high quality lithium that can be converted to lithium carbonate.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Fortune Minerals Announces Settlement of 2015 Debentures

Fortune Minerals Announces Settlement of 2015 Debentures

NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR DISSEMINATION IN THE UNITED STATES

Fortune Minerals Limited (TSX: FT) (OTCQB: FTMDF) (" Fortune " or the " Company ") ( www.fortuneminerals.com ) is pleased to announce that it has reached agreements (the " Settlement Agreements ") with the holders of its debentures issued in 2015 and amended in 2022 (the " 2015 Debentures "). With the Settlement Agreements in place, Fortune can now focus on advancing the NICO cobalt-gold-bismuth-copper critical minerals development project (" NICO Project ") in the Northwest Territories (" NWT ") and Alberta.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
Electric Royalties Provides Update on Royalty Portfolio

Electric Royalties Provides Update on Royalty Portfolio

Electric Royalties Ltd. (TSXV:ELEC)(OTCQB:ELECF) ("Electric Royalties" or the "Company") is pleased to provide an asset update on its current royalty portfolio

Brendan Yurik, CEO of Electric Royalties, commented: "Despite the difficult equity markets in the past six months, it has been tremendously exciting to see progress continue across our portfolio, particularly at our lithium assets. Upon forecast restart in Q1 2023, Sayona Mining's North American Lithium (NAL) operation will become Canada's only producing lithium mine; NAL will seek to integrate millfeed from the Authier project on which we have a 0.5% gross metal royalty. We acquired the Authier royalty approximately two and a half years ago and the project has advanced substantially while lithium prices have climbed1. Our other lithium royalties, Seymour Lake and Cancet, continue to show promise, and we eagerly await the Seymour Lake preliminary economic assessment targeted for Q1 2023. Having one of the largest lithium royalty portfolios in the world, we're well positioned to benefit from the strong lithium market.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Noram Highlights Milestones During 2022

Noram Highlights Milestones During 2022

Noram Lithium Corp. ("Noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is pleased to review the Company's activities during 2022 and to highlight upcoming catalysts at its 100%-owned high-grade Zeus Lithium Project in Clayton Valley, Nevada

Highlights of 2022 Corporate Milestones:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
ACME Lithium Provides Exploration and Development Update at Nevada Lithium Brine Project

ACME Lithium Provides Exploration and Development Update at Nevada Lithium Brine Project

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to provide a corporate update regarding its upcoming Phase 2 multi-hole drill program at its Clayton Valley Nevada lithium brine project.

Following ACME's lithium brine discovery announcement on August 17th, 2022, the Phase 2 drill program and NOI covers a large diameter test well (TW-1) for completion of brine aquifer permeability testing and sampling, and will also include up to three (3) new exploration holes DH-1A, DH-2, and DH-3 with objectives to examine deeper horizons through zonal isolated testing, assess stratigraphy, and the potential for continuity between the stratigraphic units encountered in DH-1.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Infinity Stone Announces Winter Drill Program on Buda Lithium Project

Infinity Stone Announces Winter Drill Program on Buda Lithium Project

Highlights

  • Infinity Stone announces Winter Drill Program with intended commencement on December 5, 2022.
  • Winter Drill Program follows the recovery of grab samples assaying up to 367 ppm Li, 2,090 ppm Rb, and 4,200ppm Be, and channel samples up to 1,408 ppm Rb over 4 metres.
  • The Winter Drill Program will cover 400 to 600 metres, depending on initial results.

Infinity Stone Ventures Corp. (CSE: GEMS) (OTCQB: GEMSF) (FSE: B2I) (the "Company" or "Infinity Stone"), is pleased to announce its winter drill program on the Buda Lithium Project ("Winter Drill Program"), to test pegmatite layers perpendicular to outcrop zones. The Company anticipates having pre-drill surveying of roads, trails and pads completed by November 30, 2022, with mobilisation of drill equipment following thereafter and commencement by December 5th, 2022.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×