Energy Fuels Secures Major Rare Earth Land Position in Brazil

Energy Fuels Secures Major Rare Earth Land Position in Brazil

~58.3 square mile (~37,300 acre) heavy mineral sand position has potential to feed the Company's White Mesa Mill with rare earth element and uranium bearing natural monazite sand for decades

Energy Fuels Inc. ( NYSE American: UUUU ) ( TSX: EFR ) ( "Energy Fuels" or the "Company" ) is pleased to announce that it has entered into binding agreements (the " Purchase Agreements ") to acquire seventeen (17) mineral concessions (the " Transaction ") between the towns of Prado and Caravelas in the State of Bahia, Brazil totaling 15,089.71 hectares (approximately 37,300 acres or 58.3 square miles) (the " Bahia Project ").

Based on significant historical drilling performed to date, it is believed that the Bahia Project holds significant quantities of heavy minerals, including monazite, that will feed Energy Fuels' quickly emerging U.S.-based rare earth element (" REE ") supply chain. The Bahia Project has seen no previous mining, but several of the concessions have valid exploration and mining permits with the Government of Brazil . Therefore, the Company believes there is a clear path to moving the Bahia Project to production.

The Bahia Project is a well-known heavy mineral sand (" HMS ") deposit with over 3,300 vertical historic exploration auger holes drilled to date, indicating significant concentrations of titanium (ilmenite and rutile), zirconium (zircon), and rare earth elements (monazite). Importantly, the mineralization is at or near the surface, meaning the material is expected to be relatively easy to recover using standard, low-cost sand mining techniques, including the use of front-end loaders, excavators and/or dredges. Due to the drilling method used historically, drilling performed to date only averages 5.86 meters deep, or the average depth of the water table in the region. There is no reason to believe that mineralization stops at the water table. Therefore, the Company believes mineralization is open at depth. Energy Fuels' primary interest is in the monazite which contains both rare earth elements and uranium. Preliminary assay data indicates the monazite sand contained in the HMS concentrate ranges between 0.62% and 12.82% 1 , and the uranium contained in the monazite is expected to be comparable to typical Colorado Plateau uranium deposits.

The Bahia Heavy Mineral Sand & Rare Earth Project (CNW Group/Energy Fuels Inc.)

Energy Fuels plans to perform extensive exploration work over the next six months to further define and quantify the HMS resource at the Bahia Project. This is expected to include a comprehensive sonic drilling and geophysical mapping program to define the HMS grades and depths for the various mineral products, including the REE resources associated with the Bahia Project. The Company plans to engage industry leaders in mineral processing to complete a Preliminary Economic Assessment under NI 43-101 ( Canada ) and an Initial Assessment under SK-1300 (US) during late Q1 or early Q2 2023.

Based on preliminary, historical resource estimates, the Company believes the Bahia Project has the potential to supply approximately 3,000 – 10,000 tonnes per year of monazite sand concentrate to the Mill (depending on production rates), containing approximately 1,500 – 5,000 tonnes of total rare earth oxides (" TREO ") per year, potentially for decades. The Company expects to mine and produce an HMS concentrate at the site, which contains all the valuable minerals, including monazite. This HMS concentrate would then be shipped to an existing HMS facility for further refinement and separation of the monazite into a product Energy Fuels can process at the Mill. The Company is evaluating whether this further refinement and separation step could potentially be performed in Brazil . However at this time, the Company plans to ship lower concentrations of monazite sand for concentration at a U.S. facility. Preliminary internal projections indicate this latter option can be very cost-effective, despite the larger shipping quantities, as the less concentrated material will not require the more expensive Class 7 designation applicable to higher concentrated materials, and it can be shipped in bulk.

Mark S. Chalmers , President and CEO of Energy Fuels stated: "This is another very significant step in Energy Fuels' development as a major global rare earth element producer based in the United States . We are aggressively seeking to expand our monazite sand feeds. With guidance from our heavy mineral sand experts, the Company has been evaluating the acquisition of monazite-bearing projects. The Bahia deposit is well-known throughout the HMS industry as having excellent potential to produce high-quality ilmenite, rutile, and zircon products, in addition to monazite. We are very pleased to have secured this project, as it has the potential to provide Energy Fuels with our own low-cost source of monazite feed that we fully control. The Company expects to supplement its monazite supply in the future with open market purchases, arrangements with existing monazite producers, and/or additional acquisitions. Energy Fuels is in advanced discussions with other current and future monazite producers around the world to provide creative options on how to best build upon our momentum and add further scale.

"At Energy Fuels, we have proven our ability to process natural monazite sand concentrate into a high purity mixed rare earth carbonate, containing about 32% - 34% neodymium/praseodymium (NdPr). Our clear current priorities are to continue to build our book of monazite feed to a world scale and to leverage our existing solvent extraction experience and infrastructure at the Mill to produce both separated 'light' and 'heavy' rare earth oxides, and other products, by adding commercial separation capabilities to the Mill. To achieve these ambitious goals, we have assembled a team of rare earth heavy-weights, including Neo Performance Materials, Carester SAS, and other heavy mineral sand and rare earth experts, that we believe is unmatched anywhere in the world.

"In my view, this acquisition will provide significant credibility to investors, other monazite suppliers, and clean energy manufacturers, as we will clearly demonstrate that Energy Fuels is well on its way to becoming a large-scale producer of advanced rare earth materials in the U.S. We have already proven our processing capabilities. Now, we are proving that upon successful completion of this acquisition, we will own and control 'the elements' to supply EV, renewable energy and other technology manufacturers."

Under the Transaction, Energy Fuels has entered into Purchase Agreements with private mineral rights holders in Brazil to acquire seventeen (17) heavy mineral sand concessions comprising the Bahia Project, subject to a 90-day due diligence period. The total consideration for this acquisition is $27,500,000 in cash, with non-refundable deposits totaling $2,750,000 cash due on signing, and additional non-refundable deposits totaling $2,850,000 cash due at various benchmarks during the due diligence period, and the remaining $21,900,000 due at closing. Closing is expected to follow the 90-day due diligence period and is subject to Energy Fuels being satisfied with its due diligence investigations. The Purchase Agreements contain other customary terms and conditions for a transaction of this nature.

Energy Fuels is a leading U.S.-based uranium mining company, supplying U 3 O 8 to major nuclear utilities. Energy Fuels also produces vanadium from certain of its projects, as market conditions warrant, and is ramping up commercial-scale production of REE carbonate. Its corporate offices are in Lakewood, Colorado , near Denver, and all its assets and employees are in the United States . Energy Fuels holds three of America's key uranium production centers: the White Mesa Mill in Utah, the Nichols Ranch in-situ recovery (" ISR ") Project in Wyoming, and the Alta Mesa ISR Project in Texas. The White Mesa Mill is the only conventional uranium mill operating in the U.S. today, has a licensed capacity of over 8 million pounds of U 3 O 8 per year, has the ability to produce vanadium when market conditions warrant, as well as REE carbonate from various uranium-bearing ores. The Nichols Ranch ISR Project is on standby and has a licensed capacity of 2 million pounds of U 3 O 8 per year. The Alta Mesa ISR Project is also on standby and has a licensed capacity of 1.5 million pounds of U 3 O 8 per year. In addition to the above production facilities, Energy Fuels also has one of the largest NI 43-101 compliant uranium resource portfolios in the U.S. and several uranium and uranium/vanadium mining projects on standby and in various stages of permitting and development. The primary trading market for Energy Fuels' common shares is the NYSE American under the trading symbol "UUUU," and the Company's common shares are also listed on the Toronto Stock Exchange under the trading symbol "EFR." Energy Fuels' website is www.energyfuels.com .

Daniel Kapostasy , P.G., Director of Technical Services for Energy Fuels , is a Qualified Person as defined by Canadian National Instrument 43-101 and has reviewed and approved the technical disclosure contained in this news release, including sampling, analytical, and test data underlying such disclosure.

CAUTIONARY STATEMENTS REGARDING FORWARD LOOKING STATEMENTS

This news release contains "forward-looking information" within the meaning of applicable securities laws in the United States and Canada . Forward-looking information may relate to future events or future performance of Energy Fuels. All statements in this release, other than statements of historical facts, with respect to Energy Fuels' objectives and goals, as well as statements with respect to its beliefs, plans, objectives, expectations, anticipations, estimates, and intentions, are forward-looking information. Specific forward-looking statements in this discussion include, but are not limited to, the following:; any expectation that the Transaction will close and that the Company will acquire the Bahia Project on the terms disclosed or at all; any expectation as to the concentrations or quantities of heavy minerals, including monazite contained in the Bahia Project; any expectation as to the potential annual supply of monazite sands from the Bahia Project to the Mill, the contained tonnes of TREO per year, or the number of years or decades of such potential supply; any expectation that monazite sands from the Bahia Project may be a low-cost source of monazite feed; any expectation that there may be a clear path to moving the Bahia Project into production; any expectation that the mineralization does not stop at the water table and is open at depth; any expectation as to the exploration or development work the Company plans to perform on the Bahia Project; any expectation that a Preliminary Economic Assessment under NI 43-101 or an Initial Assessment under SK-1300 will be performed and the timing of completion of any such assessments; any expectation as to how the Bahia Project may be mined, or the manner or location of any further refinement and separation of mined material; any expectation as to the cost-effectiveness of transporting various forms of HMS from the mine to a concentration facility; any expectation that the Company may become a major global rare earth element producer based in the United States ; any expectation that the Company may be successful in expanding its monazite sand feeds; any expectation that the Company will or will continue to successfully process monazite sand concentrates into a high purity mixed rare earth carbonate; any expectation that the Company may be successful at developing a full scale separations facility at the Mill; and any expectation that the Company will continue to be a leading U.S. based uranium mining company. Often, but not always, forward-looking information can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "continues", "forecasts", "projects", "predicts", "intends", "anticipates" or "believes", or variations of, or the negatives of, such words and phrases, or state that certain actions, events or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved. This information involves known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward-looking information. Factors that could cause actual results to differ materially from those anticipated in these forward-looking statements include risks associated with: technical difficulties; mining or processing difficulties and upsets; licensing, permitting and regulatory delays; litigation risks; competition from others; political actions or instability in foreign countries; and market factors, including future demand for and prices realized from the sale of uranium, vanadium and REEs. Forward-looking statements contained herein are made as of the date of this news release, and Energy Fuels disclaims, other than as required by law, any obligation to update any forward-looking statements whether as a result of new information, results, future events, circumstances, or if management's estimates or opinions should change, or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements. Energy Fuels assumes no obligation to update the information in this communication, except as otherwise required by law.

____________________________

1 This information comes from 16 different Exploration Reports filed with the Brazilian Government's National Agency of Minerals (ANM) over several years (2011-2019). These grades should be considered conceptual in nature since there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. The data was obtained by sampling 1-meter intervals from a hand auger hole, separating out the heavy mineral fraction using heavy liquids, separating the heavy minerals by magnetic strength and then point counting the minerals under a microscope. Energy Fuels plans to initiate a sonic drill program to better define the exploration target and use industry best practices to determine an estimate of all the heavy minerals found within the project area. A qualified person has not done sufficient work to classify this historical estimate as current and Energy Fuels is not treating this historical estimate as current.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/energy-fuels-secures-major-rare-earth-land-position-in-brazil-301551164.html

SOURCE Energy Fuels Inc.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/May2022/19/c4426.html

News Provided by Canada Newswire via QuoteMedia

UUUU
The Conversation (0)
Billion Dollar Uranium Market Growing at a Solid Rate Along With Rising Adoption Strategies

Billion Dollar Uranium Market Growing at a Solid Rate Along With Rising Adoption Strategies

FN Media Group News Commentary - The Global Uranium Mining Market has consistently been growing over the past several years and is expected to continue for years to come. Uranium is a silver-white metal chemical element belonging to the lanthanide series of the periodic table. Its chemical symbol is U and its atomic order is 92. Each uranium atom has 92 protons and 92 electrons, 6 of which are valence electrons. Uranium is micro-radioactive, its isotopes are unstable, and uranium-238 and uranium-235 are the most common. A report from Market Reports World said that the global Uranium market size is expected to expand at a CAGR of 3.6% of 3.6% during the forecast period, reaching USD $3.27 Billion by 2027. The report said that the primary factors propelling the growth in the industry is primarily fueled by technological advancements, evolving consumer preferences, and the impact of government policies and regulations, which serve as drivers for expansion. Another report from 360Research Reports said: "The Global Uranium Mining, market is anticipated to rise at a considerable rate during the forecast period, between 2024 and 2031. In 2023, the market is growing at a steady rate and with the rising adoption of strategies by key players, the market is expected to rise over the projected horizon." Active mining companies in the markets this week include Stallion Uranium Corp. (OTCQB: STLNF) (TSX-V: STUD), CanAlaska Uranium Ltd. (OTCQX: CVVUF) (TSX-V: CVV), Denison Mines Corp (NYSE American: DNN), IsoEnergy Ltd. (OTCQX: ISENF) (TSX-V: ISO), Energy Fuels Inc . (NYSE American: UUUU).

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Energy Fuels Announces 2023 Results: Record Net Income and Earnings per Share, Uranium Production Ramp-Up, and Near-Term Production of Separated Rare Earth Elements

Energy Fuels Announces 2023 Results: Record Net Income and Earnings per Share, Uranium Production Ramp-Up, and Near-Term Production of Separated Rare Earth Elements

Conference Call and Webcast on February 26, 2024

Energy Fuels Inc. (NYSE American: UUUU) (TSX: EFR) ("Energy Fuels" or the "Company") today reported its financial results for the year ended December 31, 2023. The Company's Annual Report on Form 10-K has been filed with the U.S. Securities and Exchange Commission (" SEC ") and may be viewed on the Electronic Document Gathering and Retrieval System (" EDGAR ") at www.sec.govedgar. html on the System for Electronic Document Analysis and Retrieval (" SEDAR ") at www.sedar.com and on the Company's website at www.energyfuels.com . Unless noted otherwise, all dollar amounts are in U.S. dollars.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Energy Fuels Enters into MOU to Secure Near-Term, Large-Scale Australian Source of Rare Earth Minerals to Supply New U.S.-Based Supply Chain for Decades

Energy Fuels Enters into MOU to Secure Near-Term, Large-Scale Australian Source of Rare Earth Minerals to Supply New U.S.-Based Supply Chain for Decades

Energy Fuels and Astron Corporation execute non-binding MOU to jointly develop the Donald Mineral Sands Project, a large heavy mineral sand deposit that has the potential to supply Energy Fuels with approximately 7,000 tonnes of rare earth-bearing monazite sand per year starting in 2026, ramping up to 14,000 tonnes per year soon thereafter.

Energy Fuels Inc. (NYSE American: UUUU) (TSX: EFR) ( "Energy Fuels" or the "Company" ), a leading U.S. producer of uranium, rare earth elements (" REE "), and vanadium, is pleased to announce that it has entered into a non-binding Memorandum of Understanding (" MOU ") with Astron Corporation Limited (" Astron ") to jointly develop the Donald Rare Earth and Mineral Sands Project, located in the Wimmera Region of the State of Victoria, Australia (the " Donald Project "). The MOU describes indicative commercial terms and provides Energy Fuels with a binding exclusivity period to end on March 1, 2024 during which Energy Fuels will be entitled to conduct due diligence and the parties will negotiate definitive agreements.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
In Response to Surging Prices, Supportive Government Policies, and a Domestic Focus on Security of Supply, Energy Fuels Has Commenced Production at Three of its U.S. Uranium Mines

In Response to Surging Prices, Supportive Government Policies, and a Domestic Focus on Security of Supply, Energy Fuels Has Commenced Production at Three of its U.S. Uranium Mines

Nuclear energy is increasingly being recognized as a clean energy resource globally, while buyers seek non-Russian uranium supply; Energy Fuels is uniquely positioned to immediately increase uranium production through multiple assets in the U.S., including the only licensed and operating conventional uranium processing facility in the U.S.

Energy Fuels Inc. (NYSE American: UUUU) (TSX: EFR) ( "Energy Fuels" or the "Company" ), a leading U.S. producer of uranium, rare earth elements (" REE "), and vanadium, is pleased to announce that, in response to strong uranium market conditions, it has commenced uranium production at three (3) of its permitted and developed uranium mines located in Arizona and Utah . In addition, the Company is preparing two (2) additional mines in Colorado and Wyoming for expected production within one (1) year and advancing permitting on several other large-scale U.S. mine projects in order to increase uranium production in the coming years.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Clean Energy and Precious Metals Virtual Investor Conference: Presentations Now Available for Online Viewing

Clean Energy and Precious Metals Virtual Investor Conference: Presentations Now Available for Online Viewing

Virtual Investor Conferences, the leading proprietary investor conference series, today announced the presentations from the Clean Energy and Precious Metals Virtual Investor Conference, held December 4 th 5 th and 6 th are now available for online viewing.

REGISTER NOW AT : https://bit.ly/46QuklX

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Victory Sells Tahlo Lake Property in British Columbia

Victory Sells Tahlo Lake Property in British Columbia

Victory Battery Metals Corp. (CSE:VR)(FWB:VR61)(OTC PINK:VRCFF) ("Victory" or the "Company") is pleased to announce its sale of its Tahlo Lake, British Columbia property to a private company, Trimera Metals Corp., of Vancouver, British Columbia

Highlights of the Tahlo Lake Sale:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Beyond Lithium and Its Exploration Team Recognized with Bernie Schnieders Discovery of the Year Award

Beyond Lithium and Its Exploration Team Recognized with Bernie Schnieders Discovery of the Year Award

Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium") is pleased to announce that the Company and its exploration team have been awarded the prestigious 2023 Bernie Schnieders Discovery of the Year Award for the spodumene discovery at its Victory Project in Ontario, Canada.

The award, presented by the Northwestern Ontario Prospectors Association (NWOPA), annually recognizes an exceptional discovery in Northwestern Ontario during the previous calendar year. It was presented on April 24 to Beyond Lithium and its exploration team at the annual awards banquet hosted during the 2024 Ontario Prospectors Exploration Showcase in Thunder Bay, Ontario. Past recipients of this prestigious award include Great Bear Resources Inc., Frontier Lithium Inc. and Delta Resources Ltd.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ALX Resources Corp. Intersects Additional Uranium Mineralization at the Gibbons Creek Uranium Project, Athabasca Basin, Saskatchewan

ALX Resources Corp. Intersects Additional Uranium Mineralization at the Gibbons Creek Uranium Project, Athabasca Basin, Saskatchewan

alx resources corp. (TSXV: AL) (FSE: 6LLN) (OTC: ALXEF) ("ALX" or the "Company") is pleased to announce the completion of the 2024 winter drilling program at its 100%-owned Gibbons Creek Uranium Project ("Gibbons Creek", or the "Project") located in the northern Athabasca Basin near the community of Stony Rapids, Saskatchewan. The 2024 drilling program was designed to test for continuity of uranium mineralization first discovered in 1979 by Eldorado Nuclear and by ALX in 2015. Five holes totaling 849.44 metres were completed. Four of the five holes intersected uranium mineralization at or near the unconformity, based upon hand-held scintillometer readings on drill core, downhole gamma probe results, and visual observation of uranium minerals by ALX's geological team. Mineralization found in the 2024 drilling was intersected in two areas located 500 metres apart within a target area that ALX defined in late 2023 by carrying out a high-resolution magnetic survey and a Soil Gas Hydrocarbon ("SGH") survey (see ALX news release dated January 23, 2024).

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Brunswick Exploration Drills 58.1 Meters at 1.59% Li2O Starting From Surface at Mirage

Brunswick Exploration Drills 58.1 Meters at 1.59% Li2O Starting From Surface at Mirage

Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; " BRW " or the " Company ") is pleased to report the first assays from the Mirage winter drilling campaign where it drilled an additional thirty-five holes. The Mirage Project is located in the Eeyou Istchee-James Bay region of Quebec approximately 40 kilometres south from the Trans-Taiga Road. The winter drill campaign focused on the Central Zone and has continued to intersect multiple wide, well mineralized intervals on the MR-6 dyke and its vicinity where it remains open in all directions.

Highlights include:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Positive Lithium Values in the 12th Exploration Well at the Rincon West Project

Argentina Lithium Announces Positive Lithium Values in the 12th Exploration Well at the Rincon West Project

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQX: LILIF) ("Argentina Lithium" or the "Company") reports positive results from the twelfth exploration hole at its Rincon West Project in Salta Province Argentina . Brine samples collected over a 165 metre interval of RW-DDH-012 ranged from 322 to 371 mgl lithium.

Argentina Lithium & Energy Logo (CNW Group/Argentina Lithium & Energy Corp.)

"Our ongoing drilling continues to evaluate the Rinconcita II concession that extends from our original claims, eastwards over the salt flat towards the neighboring Rio Tinto concessions. Our twelfth hole demonstrates a long interval of impressive lithium values in porous host lithologies. Thus far, our drilling at Rincon West demonstrates a continuous aquifer of concentrated lithium brines over an extensive basin." stated Miles Rideout , V.P. of Exploration.

The results including sampling method, the sample interval data, and the brine analyses for RW-DDH-012 are shown in Table 1. Drill collar information is presented in Table 2. An extensive selection of core samples has been sent to an independent laboratory for brine recovery testing; results are pending.

The Rincon West Project covers 5198.8 hectares of the salar basin, consisting of three property blocks adjacent to Rio Tinto's Rincon Project. Drill hole RW-DDH-012 represents the third exploration hole of the 6-hole program planned for the Rinconcita II property, announced in the Company's October 19, 2023 News Release. The Company is currently completing the access to the next drill platform (RW-DDH-013), representing a further 1000 m step towards the northeast corner of the property block.

Figure 1 presents a map of the western (main) block of the Rincon West project showing the positions of the twelve completed exploration holes (see News Releases dated July 13, 2022 , October 3, 2022 , October 25, 2022 , January 26, 2023 , April 24, 2023 , May 31, 2023 and January 22, 2024 ). The drill locations are overlain on the conductive zones (shaded yellow) delineated by two geophysics campaigns (see News Releases dated May 2, 2022 and October 19, 2023 ).

Table 1: Interval data and results of brine analyses for lithium, potassium, and magnesium for drill hole RW-DDH-01 2*

Sample Interval (m)

Sample
Method

Li

K

Mg

Density

From

To

Thickness

(mg/litre)

(g/ml)

RW-DDH-012






48.5

51.5

3.0

Single packer

337

6284

3062

1.201

54.5

57.5

3.0

Single packer

345

6667

3116

1.204

60.5

63.5

3.0

Single packer

355

6884

3143

1.207

66.5

69.5

3.0

Single packer

365

7230

3169

1.212

78.5

81.5

3.0

Single packer

363

7210

3208

1.216

96.5

99.5

3.0

Single packer

329

7087

2764

1.218

102.5

105.5

3.0

Single packer

339

7262

2867

1.218

108.5

111.5

3.0

Single packer

356

7483

3034

1.216

120.5

123.5

3.0

Single packer

347

7202

2971

1.215

126.5

129.5

3.0

Single packer

366

7260

3184

1.212

132.5

135.5

3.0

Single packer

352

7152

3067

1.213

138.5

141.5

3.0

Single packer

371

7451

3298

1.214

144.5

147.5

3.0

Single packer

356

7192

3157

1.216

156.5

159.5

3.0

Single packer

345

7054

3091

1.219

162.5

165.5

3.0

Single packer

335

6858

2998

1.219

168.5

171.5

3.0

Single packer

315

6679

2827

1.22

174.5

177.5

3.0

Single packer

324

6696

2893

1.219

180.5

183.5

3.0

Single packer

327

6694

2914

1.218

186.5

189.5

3.0

Single packer

323

6685

2874

1.217

192.5

195.5

3.0

Single packer

324

6744

2897

1.218

198.5

201.5

3.0

Single packer

324

6718

2860

1.217

204.5

207.5

3.0

Single packer

322

6697

2827

1.217

210.5

213.5

3.0

Single packer

324

6717

2834

1.217

*The drill hole was inclined vertically; the brine hosting strata are believed to be flat lying resulting in reported intervals approximating true thickness.

Drilling Methodology

RW-DDH-012 was executed with HQ-diameter diamond drilling, permitting the extraction of core samples of the salar basin formations and the recovery of brine samples where possible.

Drilling was carried out by Salta-based AGV Falcon Drilling SRL, under the supervision of Argentina Lithium's geologists.

Table 2: Collar and maximum depth information for RW-DDH-012

Hole ID

East

North

Elevation

Azimuth

Dip

Depth


UTM Zone 19S (WGS84)

(m)

(deg.)

(deg.)

(m)

RW-DDH-012

684144

7337989

3722

n/a

90

339.0

LIT's preferred method for brine sampling deploys a 'single packer' sampling unit during drilling. The packer sampling method allows the recovery of brine samples at specific depths while sealing the hole at the top and bottom of the interval. For single packer sampling, an inflatable seal closes the top of the interval; the lower limit of drilling represents the bottom of the interval.

Geophysical profiling and lining the hole with 2" diameter PVC filters have been completed. All core samples recovered in drilling were retained for geologic logging.

Observations regarding RW-DDH-012

RW-DDH-012 extends drilling eastwards from previous holes over the Rincon salt flat. The hole was completed to 339.5 m depth and a total 23 brine samples extracted using the single packer method were submitted for analysis.

Samples collected between 48.5 m depth and 213.5 m depth (the deepest sample) ranged from 322 to 371 mg/l lithium. Over this 165 m interval, 23 single packer brine samples were collected from discrete 3 m intervals, totalling 69.0 m of sampling, which represents 41.8% of the total interval.

From surface to 20 m depth, gravels with a sandy-clayey matrix were drilled. Dacite was recovered from 20.0 to 22.9 m , whereupon the drill crossed coarse gray-brown sand, to 52.3 m . Fine black sands were then sampled to 106.5 m depth, followed by reddish clayey sand to 122 m . The drill sampled fine black sands to 129.5, followed by coarse red sand to 135.5 m , then medium brown sand to 144.5 m . Breccia with grey sandy matrix was crossed to 151.0, with clasts of andesite and other compositions. Fine reddish and gray sands were then drilled to 177.4 m , where sulphates were encountered, extending to 178.2 m . Brown, medium-grained sand was then drilled to 180.5, followed by breccia to 185.5 m . Between 185.5 m and 201.4 m , the drill sampled andesitic porphyry with veinlets. From 201.4 to 339.5 m , the drill sampled a sequence of volcanic units (porphyries, breccias and ignimbrites, among others) characterised by the presence of fractures and carbonate or quartz veinlets. Brine sampling in these relatively competent basement units proved unproductive below the initial weathered zone.

Analyses and QA/QC

Samples of brine were submitted for analysis to Alex Stewart International Argentina S.A. ("Alex Stewart"), the local subsidiary of Alex Stewart International, an ISO 9001:2017 certified laboratory, with ISO 17025:2017 certification for the analysis of lithium, potassium and other elements. Alex Stewart employed Inductively Coupled Plasma Optical Emission Spectrometry ("ICP-OES") as the analytical technique for the primary constituents of interest, including boron, calcium, potassium, lithium, and magnesium. Measurements in the field included pH, electrical conductivity, temperature and density.

The quality of sample analytical results was controlled and assessed with a protocol of blank, duplicate and reference standard samples included within the sample sequences. For hole RW-DDH-012 the lot contained one blank and two duplicate samples, which all reported within the acceptable range. Single low-grade, medium-grade and high-grade reference standard samples (3 standards in total) were included within the submitted sample suite. The low-grade reference standard analysed higher than 3 standard deviations (SD) of best value, with 8.6 relative percent difference (RPD); the medium-grade reference standard analysed below 3 SD of best value, with 4.9 RPD; the high-grade reference standard analysed below 3 SD of the best value; with 2.9 RPD.

Qualified Person

Frits Reidel , CPG is a Qualified Person as defined in National Instrument 43-101, is the Principal of Atacama Water Consultants, and is independent of Argentina Lithium. Mr. Reidel has reviewed the work carried out by the Company's exploration team at the early-stage Rincon West property. The disclosure in this news release has been reviewed and approved by Mr. Reidel.

About Argentina Lithium

Argentina Lithium & Energy Corp is focused on acquiring high quality lithium projects in Argentina and advancing them towards production in order to meet the growing global demand from the battery sector. The Company's recent strategic investment by Peugeot Citroen Argentina S.A., a subsidiary of Stellantis N.V., one of the world's leading automakers, places Argentina Lithium in a unique position to explore, develop and advance its four key projects covering over 67,000 hectares in the Lithium Triangle of Argentina . Management has a long history of success in the resource sector of Argentina and has assembled some of the most prospective lithium properties in the world renowned "Lithium Triangle". The Company is a member of the Grosso Group, a resource management group that has pioneered exploration in Argentina since 1993.

ON BEHALF OF THE BOARD

"Nikolaos Cacos"

_______________________________
Nikolaos Cacos , President, CEO and Director

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements. Generally, forward-looking statements can be identified by the use of terminology such as "anticipate", "will", "expect", "may", "continue", "could", "estimate", "forecast", "plan", "potential" and similar expressions. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. All statements, other than statements of historical fact, that address activities, events or developments management of the Company believes, expects or anticipates will or may occur in the future, including, without limitation, statements about the Company's plans for its mineral properties; the Company's business strategy, plans and outlooks; the future financial or operating performance of the Company; and future exploration and operating plans are forward-looking statements.

Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company. Accordingly, readers should not place undue reliance on the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things: risks and uncertainties related to the ability to obtain, amend, or maintain licenses, permits, or surface rights; risks associated with technical difficulties in connection with mining activities; the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; the state of financial markets in Canada and other jurisdictions; the Company's ability to meet its working capital needs; fluctuations in metal prices; operations in foreign countries and the compliance with foreign laws; environmental regulations or hazards and compliance with regulations associated with mining activities; climate change and climate change regulations; fluctuations in foreign currency exchange rates; failure to obtain or delays in obtaining necessary governmental and regulatory approvals; labour disputes and other risks generally in the mining industry. There may be other factors that cause results or events to not be as anticipated. Actual results may differ materially from those currently anticipated in such statements. Readers are encouraged to refer to the Company's Management's Discussion and Analysis for a more detailed discussion of factors that may impact expected future results. The forward-looking statements contained in this press release are made as of the date hereof or the dates specifically referenced in this press release, where applicable. The Company undertakes no obligation to publicly update or revise any forward-looking statements, unless required pursuant to applicable laws. All forward-looking statements contained in this press release are expressly qualified by this cautionary statement.

We advise U.S. investors that the SEC's mining guidelines strictly prohibit information of this type in documents filed with the SEC. U.S. investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on our properties.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/argentina-lithium-announces-positive-lithium-values-in-the-12th-exploration-well-at-the-rincon-west-project-302125564.html

SOURCE Argentina Lithium & Energy Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2024/24/c3920.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
CENTURY LITHIUM PROVIDES UPDATE ON THE FEASIBILITY STUDY

CENTURY LITHIUM PROVIDES UPDATE ON THE FEASIBILITY STUDY

Century Lithium Corp. (TSXV: LCE) (OTCQX: CYDVF) (Frankfurt: C1Z) (Century Lithium or Company) reports that the Feasibility Study on the Company's Clayton Valley Lithium Project (Project), in Nevada, USA under the direction of Wood PLC and Global Resource Engineering Ltd., is currently under review by the Qualified Persons, and the Company anticipates its announcement imminently.

Century Lithium Provides Update on the Feasibility Study (CNW Group/Century Lithium Corp.)

To date, the Company's Feasibility Study team has revised and updated estimates for a phased production approach at the Project. These revisions also included assessment and evaluation of the economic benefit of sales of the surplus sodium hydroxide produced by the chlor-alkali plant.

The Company's Lithium Extraction Facility (Pilot Plant) in Amargosa Valley, Nevada is now in its third year of testing the processing of lithium-bearing claystone from the Project. All data collected has been essential to the Feasibility Study. Century Lithium continues to work toward permitting the Project including the collection of baseline data collection for biology, surface and groundwater hydrology, and social impacts. Earlier this year, baseline reports were submitted by the Company's consultants and were accepted by the appropriate government agencies. Multiple reports have been completed which will aide in the preparation of a Plan of Operations to initiate the National Environmental Policy Act (NEPA) process.

About Century Lithium Corp.

Century Lithium Corp. (formerly Cypress Development Corp.) is an advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in west-central Nevada, USA . Century Lithium is currently in the pilot stage of testing on material from its lithium-bearing claystone deposit at its Lithium Extraction Facility in Amargosa Valley, Nevada and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.

ON BEHALF OF Century Lithium CORP.
WILLIAM WILLOUGHBY , PhD., PE
President & Chief Executive Officer

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

Cautionary Note Regarding Forward-Looking Statements

This release includes certain statements that may be deemed to be "forward-looking statements". Forward-looking statements are subject to risks, uncertainties and assumptions and are identified by words such as " expects," "estimates," "projects," "anticipates," "believes," "could," "scheduled," and other similar words. All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration, and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/century-lithium-provides-update-on-the-feasibility-study-302121633.html

SOURCE Century Lithium Corp.

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2024/19/c7578.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×