Critical Resources

Drilling Identifies New Mineralised Zone South of Mavis Lake

Lithium development company, Critical Resources Limited (ASX:CRR) (“Critical Resources” or “the Company”) is pleased announce further exceptional spodumene-bearing pegmatite intercepts from recent drilling at Mavis Lake1. Additionally, the results identify a new mineralised zone located~300m south of the Main Zone at Company’s 100% owned Mavis Lake Lithium Project in Ontario, Canada.

Highlights

  • Step-out drilling, of newly permitted drill pads, has intersected significant spodumene- bearing pegmatites, approximately 300m south of the Main Zone
  • Logging of core from the South Zone identifies very-high concentrations of spodumene up to 45% over lengths greater than 6m.
  • Highlights include:
    • Drill hole SZ23-002: 6.8m of spodumene-bearing pegmatite from 72.4m down hole;
    • Drill hole SZ23-004: 9.45m of spodumene-bearing pegmatite from 111.85m down hole; and
    • Drill hole SZ23-010: 6.45m of spodumene-bearing pegmatite from 208.05m down hole
  • Main Zone drilling continues to intersect thick intervals of spodumene-bearing pegmatite, proving down dip continuation of the Main Zone
  • Highlights include:
    • Drill hole MF23-190: 14.7m of spodumene-bearing pegmatite from 167.6m down hole, and 20.05m of spodumene-bearing pegmatite from 251.5m down hole;
    • Drill hole MF23-189: 17.65m of spodumene-bearing pegmatite from 167.6m down hole; and
    • Drill hole MF22-188: 16.15m of spodumene-bearing pegmatite from 165.1m down hole
  • Drilling continues to expand the known area of lithium mineralisation at Mavis Lake, with all results supporting the development of the Company’s JORC 2012 compliant, Maiden Mineral Resource Estimate
Drilling Program Delivers Continued Success

The Company recommenced drilling in early January 2023 with two drill rigs focusing on different areas at Mavis Lake. The recent results extend the known mineralisation of the Main Zone down dip, and confirms that mineralisation remains open at depth. The results also confirms a new mineralisation area to the south of the Main Zone. The successful drilling of the South Zone highlights the continued potential for scale and growth at Mavs Lake with multiple, mapped, spodumene- bearing outcrops yet to be drill tested.

All drill results will be incorporated in a Maiden Mineral Resources Estimate which is currently being developed. Tables 1 and 2 provide a summary of key intercepts, with full exploration results in Appendix 1.

Table 1 – Key spodumene-bearing pegmatite intersections and estimates of spodumene percentage confirmed through visual estimate (South Zone)1

Figure 1 – SZ23-004 core with fine to large white spodumene laths from 111.85m to 121.3m

Future Work

The Company continues drilling at Mavis Lake and has also commenced baseline technical and environmental studies and assessments to support the preparation of a Scoping Study for the Mavis Lake Project.

The Company is awaiting assays from samples collected from over 50 individual drill holes (including samples generated from drilling in late 2022).

Critical Resources’ Managing Director Alex Cheeseman said:

“These are further great results from Mavis Lake, identifying a new mineralisation zone has the ability to significantly increase the scale potential of the project, and is extremely encouraging.

These results reinforce the Company's commitment to conduct comprehensive, large scale drilling programs throughout 2022 and continuing in 2023.

We look forward to further develop our understanding of the mineralisation at Mavis Lake and adding these results to our pending Mineral Resource Estimate.”


Click here for the full ASX Release

This article includes content from Critical Resources Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

CRR:AU
The Conversation (0)
Sort by
  Loyal Lithium Limited

Strategic Consolidation of Hidden Lake and Board Changes

Loyal Lithium Limited (ASX:LLI) (Loyal Lithium, LLI, or the Company) is pleased to announce the execution of a definitive agreement for the consolidation of the Hidden Lake Lithium Project, with Patriot Battery Metals (ASX:PMT) becoming a substantial LLI shareholder. Mr. Blair Way, Non- Executive Director and former President & CEO of Patriot Battery Metals, will join the Loyal Lithium Board of Directors, bringing valuable regional and industry expertise to guide the company's growth initiatives. The consolidation of the Hidden Lake Lithium Project provides Loyal Lithium with greater flexibility and optionality to deploy innovative exploration and development solutions.

Keep reading...Show less
Drilling Commences at the Barra Lithium Project in Brazil

Drilling Commences at the Barra Lithium Project in Brazil

Summit Minerals Limited (ASX:SUM) (“Summit” or the “Company”) is pleased to announce that Summit’s maiden drilling program has commenced at the recently acquired 100% owned Barra Lithium Project (“Barra”).

The Barra Lithium Project consists of four recently acquired tenements that are located within close proximity to the existing operating Miranda Lithium mine that is within the Borborema Pegmatitic Province (“BPP”) in northeast Brazil.

Keep reading...Show less
Lithium Universe

Lithium Universe


Keep reading...Show less
CleanTech Lithium (AIM:CTL)

Issue of Equity and TVR


Keep reading...Show less

Latest Press Releases

Related News

×