CleanTech Lithium PLC (AIM:CTL, Frankfurt:T2N, OTCQX:CTLHF), an exploration and development company advancing sustainable lithium projects in Chile, announces completion of the first stage of production from the Company´s DLE pilot plant operations and results from successful downstream process test work to produce battery-grade lithium carbonate by process partners in North America.


Highlights:

  • An initial volume of 88m3 of concentrated eluate, which is the lithium carbonate equivalent (LCE) of approx. one tonne, has been produced from the Company´s DLE pilot plant in Copiapó, Chile over an operating period of 384 hours with 14 cycles completed
  • This completes the first stage of production from the DLE pilot plant
  • Results show the DLE adsorbent achieved a lithium recovery rate of approximately 95% from the brine, with total recovery (adsorption plus desorption) achieving approximately 88%
  • Impurity rejection rates were very high producing a low impurity eluate conducive to the downstream conversion process.
  • The concentrated eluate is being shipped in four batches to the facilities of Conductive Energy in Chicago, USA, for conversion into battery grade lithium carbonate

Shipment

Eluate Volume

Eluate Li Grade

LCE (kg)

Shipment Status

1

24m3

2008 mg/L

257

Arrived process facility

2

24m3

2360 mg/L

301

In Shipment

3

24m3

2325 mg/L

297

In shipment

4

17.5m3

2464 mg/L

230

At departure port

Targeted

90m3

2000 mg/L

1022

Total Achieved

88m3

2289 mg/L

1085

Table 1: Status of concentrated eluate from pilot plant first stage production

  • Conductive Energy completed test-work on a 200L sample of concentrated eluate shipped in May 2024 to optimise the downstream process before receiving the larger volume shipments
  • The conversion test-work produced multiple samples of lithium carbonate with 99.75% lithium carbonate purity demonstrating that the process achieves targets and is repeatable
  • The result is a first confirmation that a process has been developed that will efficiently produce battery-grade lithium for the Laguna Verde project from pilot scale DLE eluate
  • CleanTech Lithium continues to be a leader in exploration and development of DLE based projects in Chile and this pilot scale production will provide large test samples of lithium carbonate to potential offtake partners seeking product qualification.
  • Subject to the completion of the re-injection well in September, the reserve report for Laguna Verde is scheduled to be completed by Montgomery and Associates in October 2024.

Steve Kesler, Executive Chairman and Interim CEO, of CleanTech Lithium PLC, said:

"We are very pleased by these results as it shows we can produce battery-grade lithium with low impurities from our Laguna Verde brine project. Working with our partners on the downstream process, Forward Water and Conductive Energy, we can now demonstrate the entire DLE process from brine to final lithium product.

"The optimised downstream process will now be applied to the initial volume of 88m3 of concentrated eluate, or approximately 1 tonne of LCE, produced from the first stage of production from our DLE pilot plant. This will produce significant test sample volumes of battery-grade lithium carbonate for commencement of testing with potential strategic partners. This is important whilst the Chilean government is reviewing the feasibility of lithium projects to identify the most advanced companies in Chile and if they are to reach their target of having three to four new lithium projects in development by 2026."

Further Information

Pilot Plant in Copiapó First Stage Production Completed

The Company´s DLE pilot plant is in Copiapó, Chile, approximately 275km from Laguna Verde. The plant finished commissioning in late March 2024 and up until mid-June a total volume of 1196m3 of brine from the Laguna Verde project was processed in the plant with a total of 14 cycles completed. Each cycle represents a volume of brine being fed first through filtration to remove suspended solids, then into DLE columns which are filled with adsorbent designed to be selective for lithium molecules. Lithium, as lithium chloride, is adsorbed from the brine, before desorption with water to create a purified lithium chloride eluate. A reverse osmosis (RO) unit at the DLE pilot plant then concentrates the eluate by extracting approximately 75% of the water to form a concentrated eluate.

Averaged across the 14 cycles, the recovery rate achieved by adsorption of lithium by the adsorbent was 95% and the recovery rate of desorption from the adsorbent was 93%. The total recovery rate averaged 88% and was highly consistent as shown in Figure 1. The temperature of the brine and desorption water, using the average ambient temperature in Copiapó during the March to June period of operation, was in the range of 20oC to 25oC, which did not significantly affect the recovery achieved.

A graph showing recovery rate cycles Description automatically generated

Figure 1: Pilot Plant Total Recovery Rate

The eluate production rate was relatively stable after the initial ramp up period achieving an average of 2.8 kg LCE per hour. The design of the plant is 1 tonne per month of LCE based on designed monthly operating schedule of 360 hours. Due to budget and volume considerations, the plant was run for 384 hours for the first stage of planned operation producing a total of 1.085 tonnes of LCE as eluate. Based on the hourly production rate this met and exceeded the design capacity of the plant.

Gráfico, Gráfico de líneas Descripción generada automáticamente

Figure 2: Pilot Plant Production Rate (Kg LCE/hr in Eluate)

Selectivity of the adsorbent is another key performance parameter for a DLE operation. DLE primarily acts as a purification stage, recovering lithium chloride from the brine whilst rejecting other impurities. For all the major ions in the brine, apart from boron, the rejection rate was very high as shown in Fig. 3 below. More cycles will further validate this performance. The quality of the eluate was consistent over the first stage of production with the low level of impurities facilitating downstream conversion.

Figure 3: DLE Performance - Rejection of Major Impurities

After completion of the DLE stage, the eluate is concentrated using a reverse osmosis (RO) unit at the pilot plant. On completion of both stages the lithium grade in the purified lithium chloride eluate is over ten times higher than the feed brine. The concentrated eluate was then loaded into a flexitank in a standard shipping container and transported to the port of Caldera for shipment to North America.

Downstream Processing into Battery Grade LithiumCarbonate: Test-work Completed

For the conversion of the concentrated lithium chloride eluate into battery grade lithium carbonate, CleanTech Lithium has engaged a leading lithium processing company, Conductive Energy, based in Alberta, Canada, which has facilities in Chicago, USA, with key downstream processing units shown in Figure 4 below. The status of the concentrated eluate shipment is shown in Table 1 with processing to commence in August 2024.

A large white and black tank Description automatically generated

Figure 4: Conductive Energy Carbonation Reactor Tank and Equipment for Washing, Filtering & Drying

In May 2024 CTL air-freighted a 200L sample of concentrated eluate from the pilot plant to Conductive Energy to undertake test-work to optimise the conversion process. The process steps are shown in Figure 5, involving a further stage of RO, before using Forward Osmosis (FO) to achieve a very high level of concentration. Ion exchange (IX) is used to remove calcium, magnesium, and boron. The final steps are carbonation and then washing, filtration and drying to produce a battery grade product. Conductive Energy´s approach is to simplify the process that achieves maximum yield by minimizing process steps and, where losses occur, produce fluids that are easily recycled to further maximize yield.

Figure 5: Conductive Energy Conversion Process

Reverse Osmosis and Forward Osmosis

The increase in eluate and lithium concentration in the R/O and F/O stages are shown in Table 2 below. R/O is effective for concentration until Total Dissolved Solids (TDS) reach the level of approximately 60,000 - 70,000 TDS, after which it is increasingly energy intensive and costly. F/O is highly effective in further concentration to the required lithium grade for carbonation, in this case 18,000mg Li/L (or 1.8% Lithium). The F/O unit is provided by Forward Water Technology, another Canadian company based in Ontario. F/O achieves a high concentration factor with much lower energy use than the alternative of using a mechanical evaporator, while being highly suitable for utilising solar thermal as the energy source to power the F/O process.

Parameter

Unit

Concentrated Eluate

R/O Concentrate

F/O Concentrate

Lithium (Li)

mg/L

2,194

5,700

18,000

Chloride (Cl)

mg/L

11,039

37,000

110,000

Boron (B)

mg/L

411

850

1,700

Calcium (Ca)

mg/L

7

29

85

Magnesium (Mg)

mg/L

14

50

150

Sodium (Na)

mg/L

134

400

1,400

Sulphate (SO4)

mg/L

103

120

330

Total Dissolve Solids (TDS)

mg/L

19,260

62,000

190,000

Volume

L

215.5

66.3

13.9

Reduction in Volume

%

69.3%

93.5%

Laboratory

ALS Chile

Lambton.Scientific

Lambton.Scientific

Table 2: Results from concentration of Laguna Verde eluate through R/O followed by F/O

Ion Exchange to Remove Impurities

Ion exchange (IX) was used for removal of calcium and magnesium, which achieved 85% and 87% reductions respectively. While feed concentrations were low, 100% of barium and manganese were also removed in the same process. Additional optimization is possible with potential for further calcium removal. Lithium loss was low at 3%.

Conductive then applied its optimised IX for removal of boron. This was highly effective achieving >99.5% removal of boron. However, there was a 22% loss of lithium to the regeneration fluid. This would be recaptured by recycling the regeneration fluid to the F/O feed which was not implemented for this small-scale test-work. The lithium loss from the boron IX is expected to be reduced (recovered) to a steady state loss rate of about 3%.

Carbonation and Battery Grade Lithium Sample

The carbonation test-work achieved an exceptional yield of 96% of the theoretical maximum. The final product, after the wash procedure, was 99.75% lithium carbonate purity as shown in Table 3. Further optimisation of the washing stage is planned in order to reduce impurities to the greatest extent possible and therefore maximise the value of the battery grade product.

Table 3: Process test-work lithium carbonate sample purity Fig. 6: Test-work sample

Additional Operations

Laguna Verde Reserve Report Update

The next stage of resource evaluation at the Laguna Verde project is to produce an updated JORC compliant resource and a reserve report based on converting a portion of resources into reserves. The management of the resource evaluation programme and reserve report is led by Montgomery and Associates, a leading hydrogeology consultant with extensive experience in resource evaluation of lithium brine projects in Chile and Argentina. Reserve estimation will feed directly into the Pre-Feasibility Study which is targeted for later this year.

The reserve calculation requires the completion of pumping tests and a re-injection well at the project which is scheduled for September 2024, when drilling equipment can be re-mobilised after the current winter break in operations. Subject to the completion of the re-injection well in September, the reserve report is scheduled to be completed by Montgomery and Associates in October 2024.

Competent Persons

The following professional acts as qualified person, as defined in the AIM Note for Mining, Oil and Gas Companies (June 2009) and JORC Code (2012):

Marcelo Bravo: Chemical Engineer (Universidad Católica del Norte), has a Master's Degree in Engineering Sciences major in Mineral Processing, Universidad de Antofagasta. He currently works as a Senior Process Consulting Engineer at the Ad-Infinitum company. Mr Bravo has relevant experience in researching and developing potassium, lithium carbonate, and solar evapo-concentration design processes in Chile, Argentina, and Bolivia. Mr Bravo, who has reviewed and approved the information contained in the chapters relevant to his expertise contained in this announcement, is registered with No. 412 in the public registry of Competent Persons in Mining Resources and Reserves per the Law of Persons Competent and its Regulations in force in Chile. Mr Bravo has sufficient experience relevant to the metallurgical tests and the type of subsequent processing of the extracted brines under consideration and to the activity being carried out to qualify as a competent person, as defined in the JORC Code. Mr Bravo consents to the inclusion in the press release of the matters based on his information in the form and context in which it appears.

The information communicated within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulations (EU) No 596/2014 which is part of UK law by virtue of the European Union (Withdrawal) Act 2018. Upon publication of this announcement, this inside information is now considered to be in the public domain. The person who arranged for the release of this announcement on behalf of the Company was Gordon Stein, Director and CFO.


Source

Click here to connect with CleanTech Lithium PLC (AIM:CTL, OTCQX:CTLHF, Frankfurt:T2N), to receive an Investor Presentation

CTLHF
CleanTech Lithium

CleanTech Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
CleanTech Lithium

CleanTech Lithium


Keep reading...Show less
CleanTech Lithium PLC Announces PFS Plant Location Study Results

CleanTech Lithium PLC Announces PFS Plant Location Study Results

PFS Plant Location Study Results in Decision to Locate Carbonation Plant in Mining Centre of Copiapó

CleanTech Lithium PLC (AIM:CTL)(Frankfurt:T2N)(OTCQX:CTLHF), an exploration and development company advancing sustainable lithium projects in Chile, announces the results of a plant location study completed as part of the ongoing pre-feasibility study (PFS) for the Laguna Verde Project, which is due to complete later this year. The PFS is being led by Worley, a global professional services company of energy, chemicals and resources experts, from its Santiago office which has high-level experience in the lithium sector. Xi´an Lanshen New Material Technology Company ("Lanshen") has been selected to provide the lithium processing plant design and equipment, and Worley to design the balance of plant and infrastructure

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
CleanTech Lithium to Present at Metals & Mining Virtual Investor Conference May 1st

CleanTech Lithium to Present at Metals & Mining Virtual Investor Conference May 1st

CleanTech Lithium (OTCQX:CTLHF, AIM:CTL), an exploration and development company advancing sustainable lithium projects in Chile, today announced that Steve Kesler, Executive Chairman, will present live at the Metals & Mining Virtual Investor Conference hosted by VirtualInvestorConferences.com, on May 1 st .

DATE : May 1 st
TIME: 10:00AM
LINK: https://bit.ly/3ISIVUN
Available for 1x1 meetings: May 1 st /May 2 nd

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
CleanTech Lithium (OTCQB:CTLHF)

CleanTech Lithium - CEOL Applications

CleanTech Lithium PLC (AIM:CTL, Frankfurt: T2N, OTCQX: CTLHF), an exploration and development company advancing lithium projects in Chile, following a meeting with representatives of Chile´s Mining Ministry last week, will be resubmitting the applications for Special Lithium Operating Contracts (CEOLs) for Laguna Verde and Francisco Basin updating them in line with the latest requirements. The resubmission process has no impact on the expected project timeline. This follows the recent announcement made by the Chilean Government which outlined the new approach for private companies to "express interest" in non-strategic salars.

Highlights:

Keep reading...Show less
Comment on Chilean Government's Announcement

Comment on Chilean Government's Announcement

CleanTech Lithium PLC (AIM:CTL, Frankfurt: T2N, OTCQX: CTLHF), an exploration and development company advancing lithium projects in Chile, today commented on the announcement by the Government of Chile regarding the designation of strategic salars and the creation of a Protected Salars Network under the current administration's National Lithium Strategy.

Keep reading...Show less
Pilot Plant Producing First Lithium Chloride

Pilot Plant Producing First Lithium Chloride

CleanTech Lithium PLC ("CleanTech Lithium" or the "Company")

Pilot Plant Commences Operation with First Lithium Chloride Eluate Produced


Keep reading...Show less
White Cliff Minerals

Appointment of Strategic Advisor

White Cliff Minerals Limited (“WCN” or the “Company”) is pleased to announce the appointment of John Hancock (“John”) as a Strategic Advisor to the Board of White Cliff Minerals Ltd. The Company expects significant growth with its current and future portfolio of projects in the coming 12 months and is working now to secure appropriate personnel to assist with this.

Keep reading...Show less
Neon battery and lightning shapes.

Top 3 ASX Lithium Stocks of 2024

Global demand for lithium-based power presents a significant opportunity for Australia, the top lithium-producing nation. As countries and companies establish their positions in the battery value chain, Australia has the ability to leverage its strong output and vast reserves to shape the industry landscape into the 2030s.

The future of lithium demand relies heavily on the growth of the electric vehicle (EV) market, and in recent years its rapid expansion has led to much higher mining of the commodity — so much so that the market has entered a surplus.

This oversupply kept lithium prices subdued in the first half of 2024, but experts continue to forecast a bright long-term outlook for the essential battery material as countries around the world pursue net-zero goals.

Keep reading...Show less
White Cliff Minerals

Further IOCG, Copper and Epithermal Mineralisation Discovered at Great Bear Lake U-Cu-Ag-Au Project

Works commence at Nunavut Cu-Ag-Au Project

White Cliff Minerals Limited (“WCN” or the “Company”) is pleased to announce that further widespread, IOCG-U polymetallic, mineralisation has been visually observed during the maiden fieldwork program at the 100% owned Great Bear Lake U-Cu- Au-Ag Project in northern Canada and that works have now commenced at the 100% owned Nunavut Cu-Ag-Au Project.

Keep reading...Show less
Lithium periodic symbol leaning against lithium ore and blue batteries.

Top 6 Lithium Stocks of 2024

Now that Q2 has come to a close, it's time to look at the year's best-performing lithium stocks on Canadian, US and Australian exchanges.

While oversupply and weak prices kept some companies from registering big gains during the first half of 2024, others like those below still saw share price grow.Unlike the fluctuations observed in 2023, the lithium market has exhibited greater stability during the first half of 2024.

However, influenced by weak prices in China, the lithium hydroxide market has seen prices remain lower than anticipated.

Market oversupply prompted some lithium producers to trim 2024 output targets in hopes that some of the excess would be absorbed in the market.

Keep reading...Show less
Lithium periodic symbol and Canadian flag.

Top 5 Canadian Lithium Stocks of 2024

Continued surpluses in the lithium market have weighed down prices and impeded the sector’s growth during the second quarter of 2024. The excess has been attributed to heightened production in 2021 and 2022 amid higher lithium prices.

According to a July Fastmarkets report, increased lithium demand is fully priced into the market. China's lithium carbonate equivalent production from lepidolite rose by 126 percent year-over-year in April, while spodumene production increased by 109 percent. The accumulation of inventory suggests that there is no immediate supply shortage, but time is needed for demand to absorb the surplus.

With so much excess in the market, many lithium producers and explorers have struggled to see positive share price activity. However, several Canadian-listed lithium companies were able to see some growth during the first half of the year.

Keep reading...Show less
Galan Lithium

At-The-Market Raise

Galan Lithium Limited (ASX: GLN) (Galan or the Company) is pleased to announce that it has utilised its At-the-Market Subscription Agreement (“ATM”) with Acuity Capital (see announcements on 12 April 2024 and 14 May 2024) to raise $1,100,000 (inclusive of costs) by agreeing to issue 7,050,000 fully paid ordinary GLN.ASX shares to Acuity Capital at an issue price of $0.156 per share.
Keep reading...Show less
CleanTech Lithium

CleanTech Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×