Dakota Gold Corp. (NYSE American: DC) ("Dakota Gold" or the "Company") is pleased to provide an update on its 2025 drill campaign including progress on metallurgical testwork for the Richmond Hill Oxide Heap Leach Gold Project ("Richmond Hill" or the "Project"). Dakota Gold currently has three drills operating at Richmond Hill and the Company expects to drill 27,500 meters (~90,000 feet) for the 2025 campaign using a combination of Reverse Circulation and Core drilling.

Highlights from this update include:

  • Metallurgical drill holes intercept higher gold grade than the average resource grade including drill hole RH25C-171 with 1.50 grams per tonne gold (g/t Au) over 62.1 meters (93 gram meters). RH25C-171 is one of many metallurgical drill holes reported from the north central Project area (Figure 1) that intercepted significantly higher-grade than the average measured and indicated resource grade of 0.463 g/t Au (0.0135 ounces per ton Au).
  • The Company is now active with two Core drills in the northeast Project area where we expect assay results from expansion and infill of higher-grade zones before the end of the year. Figure 2 and 3 illustrate the target area where previously reported drill hole RH24C-142 intercepted 2.22 g/t Au over 50.0 meters. The proposed infill and expansion drilling surrounding the intercept has the potential to add to the Measured, Indicated and Inferred resources based on prior drilling and current resources in the area. The mineralization in the northeast, including the Chism Gulch area is only limited by drilling and remains open. The area is expected to be mined at the beginning of the mine plan as outlined in the July 7, 2025 Initial Assessment with Cash Flow.
  • Acceleration of metallurgical testwork to refine phase two metallurgical program and strengthening of in-house capabilities. An initial two composite samples totaling 1,500 pounds for the purpose of conducting column testing of material from the initial phases of mining at the north end of the Project area have been sent to Forte Dynamics. The test results are expected before year-end and will inform the follow-up metallurgical drilling and testwork for 2026, that will then inform our Feasibility Study in progress. The Company also welcomes Mike Eiselein as Vice President Project Development to the Dakota Gold team to oversee the metallurgical program. Mr. Eiselein has extensive operational experience applicable to our Richmond Hill Gold Project.

"We are pleased with the progress of the 2025 drill campaign and look forward to releasing additional results from the drilling in the northeast Project area as they are received," said Jack Henris, President and COO of Dakota Gold. "Dakota Gold remains focused on advancing the Project through disciplined exploration and technical rigor with the results from the current drill campaign contributing to the Feasibility Study, which is expected to be completed in early 2027."

Dakota Gold is conducting Core drilling at the northern portion of the Project area for the purposes of completing a Feasibility Study. The Core drilling is designed to collect metallurgical samples for column testing, condemnation drilling beneath proposed site infrastructure for mine planning, infill drilling to upgrade the existing resource, and expansion drilling where the resource remains open. The drill core from all holes is systematically assayed for gold due to the significant halo of low-grade gold mineralization underlying much of the Project area. In addition, the Company is also active with a Reverse Circulation drill to install monitor wells in support of environmental baseline data collection for permitting.

The group of assay results reported today in Figure 1 are primarily from metallurgical and condemnation drilling in the north central Project area. The drill results will refine the modelled oxide and sulfide boundaries and improve the precision of the geo-metallurgical model for the Feasibility and mine planning. In addition, the holes were designed to acquire samples for metallurgical tests ranging from low to high grade, various rock types and oxidation states so that composites can be made for heap leach column tests.

The condemnation drill holes under historical leach pads show potential for pit expansion and conversion of waste to mineralized material. Drill hole RH25C-183 intersected 1.82 g/t Au over 10.8 meters outside of the Measured and Indicated Initial Assessment with Cash Flow mine plan announced on July 7, 2025. Follow-up drilling in 2026 is planned and has the potential to add material to the mine plan.

Metallurgical testwork update:

Metallurgical drilling at the Project for 2025 is near completion, and the Company is preparing for the next phase of studies. To support this effort, the Company has appointed Mike Eiselein as Vice President Project Development to oversee the metallurgical program.

Mike Eiselein joined the Company on August 18, 2025 and brings over 34 years' experience in process operations, engineering, design, and maintenance across a broad-spectrum of operations ranging from refractory and double refractory gold processing, oxide heap leach, base metals flotation, and industrial minerals. Prior to joining the Company, Mr. Eiselein held senior operations positions with many established mining companies such as Barrick Gold Corporation, Newmont Mining Corporation, McEwen Mining Inc., Teck Cominco, and Bunker Hill Mining. Mr. Eiselein holds a BSc in Metallurgical Engineering/Mineral Processing from Montana College of Mineral Science and Technology.

The metallurgical testwork cadence will focus on finalizing geo-metallurgical domains and performing trade-off studies to establish processing optimization to minimize capital and operating expenditures, while maximizing recoveries and cash flow in the Feasibility Study.

  • Finalize geo-metallurgical domains (Q3 2025)

  • Sample preparation and shipment (Q3 / Q4 2025)

  • Metallurgical sample preparation for testing (Q4 2025)

  • Material testing and column tests (Q4 2025 / Q2 2026)

  • Final test report (Q2 2026)

Figure 1. Plan Map of Dakota Gold Corp. Richmond Hill 2025 Drill Campaign Highlighted Drill Results in North Central Project Area

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8218/265613_6084aadea4c269bb_002.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8218/265613_6084aadea4c269bb_002full.jpg

Figure 2. Plan Map of Dakota Gold Corp. Richmond Hill 2025 Drill Campaign in Northeast Expansion and Infill Project Area

Plan map showing the S-K 1300 Initial Assessment resource block model of the 5,600, 5,500, 5,400 and 5,300 bench levels in the northeast Project area including the Chism Gulch area projected to the surface with select historical drill hole information that informed the block model, and the location of current and future drill holes designed for the metallurgical, infill and step-out drilling to define and expand a future resource estimation.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8218/265613_6084aadea4c269bb_003.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8218/265613_6084aadea4c269bb_003full.jpg

Figure 3. Cross Section of Dakota Gold Corp. Richmond Hill 2025 Drill Campaign in Northeast Expansion and Infill Project Area

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8218/265613_6084aadea4c269bb_004.jpg

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8218/265613_6084aadea4c269bb_004full.jpg

Table 1. Richmond Hill Drill Results (Metric / Imperial)1,2,3,4

Hole # From
(m)
To
(m)
Interval (m) Grade
(g/t)
g x m From
(ft)
To
(ft)
Interval
(ft)
Grade
(oz/ton)
Program
RH25C-171 16.5 78.6 62.1 1.50 93 54.2 258.0 203.8 0.044 Metallurgical
RH25C-172 90.2 92.9 2.7 2.51 7 296.0 304.9 8.9 0.073 Metallurgical

97.7 100.4 2.7 0.58 2 320.6 329.4 8.8 0.017

157.0 160.3 3.3 1.01 3 515.2 526.0 10.8 0.029
RH25C-173 38.3 53.5 15.1 0.83 13 125.7 175.4 49.7 0.024 Metallurgical

57.8 60.3 2.5 1.09 3 189.7 197.9 8.2 0.032
RH25C-174 163.4 171.0 7.6 1.24 9 536.0 561.0 25.0 0.036 Metallurgical
RH25C-175 28.3 64.7 36.3 0.83 30 93.0 212.2 119.2 0.024 Metallurgical
RH25C-176 9.4 14.5 5.0 0.67 3 31.0 47.5 16.5 0.020 Condemnation
RH25C-177 0.0 6.5 6.5 1.02 7 0.0 21.2 21.2 0.030 Condemnation

192.7 213.4 20.7 0.68 14 632.3 700.2 67.9 0.020
RH25C-178 69.5 74.1 4.6 0.54 2 228.1 243.2 15.1 0.016 Condemnation

170.5 180.0 9.5 0.58 6 559.5 590.7 31.2 0.017
RH25C-179 0.0 6.3 6.3 0.55 3 0.0 20.8 20.8 0.016 Condemnation

28.6 32.5 4.0 1.32 5 93.7 106.7 13.00 0.038

85.0 87.9 2.8 0.81 2 279.0 288.3 9.3 0.024

144.6 151.1 6.5 0.72 5 474.4 495.6 21.2 0.021

154.8 158.6 3.8 0.97 4 507.9 520.3 12.4 0.028

178.9 182.9 4.1 0.85 3 586.8 600.1 13.3 0.025
RH25C-180 22.3 35.1 12.7 1.17 15 73.3 115.0 41.7 0.034 Condemnation
RH25C-181 60.0 73.0 13.0 1.07 14 196.8 239.4 42.6 0.031 Metallurgical

76.4 87.3 10.9 1.56 17 250.7 286.4 35.7 0.045

108.4 136.4 28.0 1.32 37 355.8 447.5 91.7 0.038

142.6 145.8 3.2 1.01 3 467.9 478.4 10.5 0.029
RH25C-182 101.3 112.1 10.8 0.66 7 332.5 367.8 35.3 0.019 Metallurgical

121.1 129.1 8.1 0.63 5 397.2 423.7 26.5 0.018

147.5 152.9 5.4 1.22 7 483.9 501.5 17.6 0.036
RH25C-183 3.5 11.1 7.7 0.58 4 11.4 36.5 25.1 0.017 Condemnation

140.3 146.3 6.0 0.53 3 460.2 479.9 19.7 0.015

155.6 166.4 10.8 1.82 20 510.5 546.0 35.5 0.053

217.2 221.2 4.0 0.64 3 712.6 725.7 13.1 0.019
RH25C-184 No Significant Values Metallurgical
RH25C-185 213.1 221.7 8.6 0.58 5 699.2 727.3 28.1 0.017 Condemnation
RH25C-186 17.5 40.0 22.5 0.67 15 57.3 131.1 73.8 0.020 Metallurgical

66.0 71.2 5.2 0.93 5 216.6 233.7 17.1 0.027

79.9 100.0 20.1 0.84 17 262.0 328.0 66.0 0.025
RH25C-187 35.9 65.0 29.1 0.74 22 117.7 213.2 95.5 0.022 Metallurgical
RH25C-188 22.6 26.1 3.5 0.55 2 74.3 85.7 11.4 0.016 Metallurgical

29.3 35.9 6.6 0.62 4 96.0 117.7 21.7 0.018

58.1 66.7 8.6 1.06 9 190.5 218.7 28.2 0.031

122.5 125.6 3.0 0.58 2 402.0 412.0 10.0 0.017

129.7 139.8 10.1 0.82 8 425.6 458.7 33.1 0.024
RH25C-189 52.0 59.3 7.3 0.68 5 170.5 194.4 23.9 0.020 Metallurgical

67.2 90.1 22.9 1.02 23 220.5 295.7 75.2 0.030

94.0 96.3 2.3 7.90 18 308.5 316.0 7.5 0.230
RH25C-190 0.0 4.4 4.4 0.68 3 0.0 14.5 14.5 0.020 Metallurgical

8.8 26.7 17.9 1.51 27 28.9 87.5 58.6 0.044

29.9 59.7 29.8 0.85 25 98.0 195.9 97.9 0.025

65.8 68.9 3.0 0.81 2 215.9 225.9 10.0 0.024

140.7 155.2 14.5 2.96 43 461.5 509.1 47.6 0.086

186.4 199.0 12.7 1.12 14 611.4 653.0 41.6 0.033
RH25C-192 0.0 4.9 4.9 0.55 3 0.0 16.0 16.0 0.016 Metallurgical

11.2 25.4 14.2 0.89 13 36.6 83.3 46.7 0.026
RH25C-193 4.4 20.6 16.2 1.03 17 14.5 67.6 53.1 0.030 Metallurgical
RH25C-194 60.1 63.4 3.3 1.46 5 197.2 207.9 10.7 0.042 Infill

84.6 89.2 4.6 0.58 3 277.5 292.5 15.0 0.017

129.0 134.1 5.2 0.71 4 423.1 440.0 16.9 0.021

159.8 165.4 5.6 0.64 4 524.2 542.6 18.4 0.019

182.4 186.5 4.1 0.59 2 598.4 611.8 13.4 0.017

 

The table may contain rounding errors.

  1. Abbreviations in the table include ounces per ton ("oz/ton"); grams per tonne ("g/t"); feet ("ft"); meter ("m"); and gram meters ("g x m").
  2. True thickness unknown.
  3. Intervals calculated based on 0.5 g/t Au cut-off and maximum dilution of 3.05 meters.
  4. The July 7, 2025 Initial Assessment with Cash Flow has an open pit designed with 12.2m (40 ft) benches. The average grade for the Measured and Indicated mine plan is 0.566 g/t Au (0.017 oz/ton). A gram meter of 7 and above has been highlighted in the Table 1 based on the bench height and average grade.

About Dakota Gold Corp.

Dakota Gold is expanding the legacy of the 145-year-old Homestake Gold Mining District by advancing the Richmond Hill Oxide Heap Leach Gold Project to commercial production as soon as 2029, and outlining a high-grade underground gold resource at the Maitland Gold Project, both located on private land in South Dakota.

Subscribe to Dakota Gold's e-mail list at www.dakotagoldcorp.com to receive the latest news and other Company updates.

Shareholder and Investor Inquiries

For more information, please contact:

Jack Henris
President and COO
Tel: +1 605-717-2540

Shawn Campbell
Chief Financial Officer
Tel: +1 778-655-9638

Carling Gaze
VP of Investor Relations and Corporate Communications
Tel: +1 605-679-7429
Email: info@dakotagoldcorp.com

Qualified Person and S-K 1300 Disclosure

James M. Berry, a Registered Member of SME and Vice President of Exploration of Dakota Gold Corp., is the Company's designated qualified person (as defined in Subpart 1300 of Regulation S-K) for this news release and has reviewed and approved its scientific and technical content.

Quality Assurance/Quality Control consists of regular insertion of certified reference materials, duplicate samples, and blanks into the sample stream. Samples are submitted to the ALS Geochemistry sample preparation facility in Winnipeg, Manitoba. Gold and multi-element analyses are performed at the ALS Geochemistry laboratory in Vancouver, British Columbia. ALS Minerals is an ISO/IEC 17025:2017 accredited lab. Check samples are submitted to Bureau Veritas, Vancouver B.C. as an umpire laboratory. Assay results are reviewed, and discrepancies are investigated prior to incorporation into the Company database.

Forward-Looking Statements

This communication contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. When used in this communication, the words "plan," "target," "anticipate," "believe," "estimate," "intend," "potential," "will" and "expect" and similar expressions are intended to identify such forward-looking statements. Any express or implied statements contained in this communication that are not statements of historical fact may be deemed to be forward-looking statements, including, without limitation: our expectations regarding additional drilling, metallurgy and modeling; our expectations for the improvement and growth of the mineral resources and potential for conversion of mineral resources into reserves; completion of a feasibility study, and/or permitting; our expectations regarding free cash flow and future financing, and our overall expectation for the possibility of near-term production at the Richmond Hill project. These forward-looking statements are based on assumptions and expectations that may not be realized and are inherently subject to numerous risks and uncertainties, which could cause actual results to differ materially from these statements. These risks and uncertainties include, among others: the execution and timing of our planned exploration activities; our use and evaluation of historic data; our ability to achieve our strategic goals; the state of the economy and financial markets generally and the effect on our industry; and the market for our common stock. The foregoing list is not exhaustive. For additional information regarding factors that may cause actual results to differ materially from those indicated in our forward-looking statements, we refer you to the risk factors included in Item 1A of the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2024, as updated by annual, quarterly and current reports that we file with the SEC, which are available at www.sec.gov. We caution investors not to place undue reliance on the forward-looking statements contained in this communication. These statements speak only as of the date of this communication, and we undertake no obligation to update or revise these statements, whether as a result of new information, future events or otherwise, except as may be required by law. We do not give any assurance that we will achieve our expectations.

All references to "$" in this communication are to U.S. dollars unless otherwise stated.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/265613

News Provided by Newsfile via QuoteMedia

DC
The Conversation (0)

Dakota Gold Corp.

Dakota Gold Corp is a gold exploration and development company with a specific focus on revitalizing the Homestake District in Lead, South Dakota. Dakota Gold has high-caliber gold mineral properties covering over 40 thousand acres surrounding the historic Homestake Mine.

Skyharbour's JV Partner Orano Commences 6-7,000m Summer Drilling Program at the Preston Uranium Project

Skyharbour's JV Partner Orano Commences 6-7,000m Summer Drilling Program at the Preston Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner, Orano Canada Inc. ("Orano"), recently commenced a large-scale diamond drilling program at the 49,635-hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The drilling program will consist of approximately 6,000 to 7,000 metres of drilling during the summer of 2025. Orano is the majority owner and operator at the project with Skyharbour owning a minority interest of approximately 25.6%.

Location Map of Preston Project:
https://www.skyharbourltd.com/_resources/images/Sky_Preston.jpg

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano to Commence Extensive Summer 2025 Drilling Program at Preston Uranium Project

Skyharbour and JV Partner Orano to Commence Extensive Summer 2025 Drilling Program at Preston Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner, Orano Canada Inc. ("Orano"), will commence a large-scale diamond drilling program at the 49,635-hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The drilling program will consist of approximately 6,000 to 7,000 metres of drilling during the summer of 2025. Orano is the majority owner and operator at the project with Skyharbour owning a minority interest of approximately 25.6%.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Grid Battery Closes Acquisition of Copper Property with AC/DC Battery Metals Inc.

Grid Battery Closes Acquisition of Copper Property with AC/DC Battery Metals Inc.

(TheNewswire)

Coquitlam, BC TheNewswire - March 17, 2025 - Grid Battery Metals Inc. (the "Company" or "Grid Battery") (TSXV: CELL, OTCQB: EVKRF FRA: NMK2) announces that further to its news release dated August 29, 2024, and the TSX Venture Exchange's ("Exchange") conditional acceptance letter dated October 9, 2024, the Company has now closed the "related party" transaction subject to final Exchange approval.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Global Nickel Mining Market Size Forecasted to Reach $100 Billion By 2034 as Demand for Electric Vehicles Rises

Global Nickel Mining Market Size Forecasted to Reach $100 Billion By 2034 as Demand for Electric Vehicles Rises

FN Media Group News Commentary - The mining industry's increasing focus on sustainability and responsible practices is influencing nickel mining. Companies are adopting environmentally friendly processes to meet regulatory standards and consumer expectations. According to a recent report from Precedence Research said: "The global nickel mining market size is calculated at USD 56.42 billion in 2025 and is forecasted to reach around USD 100.29 billion by 2034, accelerating at a CAGR of 6.56% from 2025 to 2034. The Asia Pacific market size surpassed USD 30.81 billion in 2024 and is expanding at a CAGR of 6.65% during the forecast period. The market sizing and forecasts are revenue-based (USD MillionBillion), with 2024 as the base year. The global nickel mining market size accounted for USD 53.12 billion in 2024 and is predicted to increase from USD 56.42 billion in 2025 to approximately USD 100.29 billion by 2034, expanding at a CAGR of 6.56% from 2025 to 2034." It continued: "North America is set for swift expansion in the nickel mining market owing to a heightened need for nickel in electric vehicle (EV) manufacturing and renewable energy applications. The region's commitment to clean energy initiatives and carbon reduction fuels the demand for nickel, essential in EV battery production. Supported by favorable government policies, investments in sustainable mining methods, and advancements in mining technologies, North America stands as a pivotal player in the growing nickel mining sector on the global stage. The rapid expansion of the electric vehicle (EV) market stands as a pivotal catalyst, driving a surge in nickel demand. Nickel's indispensable role in electric vehicle batteries positions it as a cornerstone element in this burgeoning market. Projections from the International Energy Agency (IEA) indicate a noteworthy 41% increase in global electric car sales, surpassing 3 million units in 2020, underscoring the heightened nickel consumption associated with the EV boom."   Active Companies mentioned in the article includes: First Atlantic Nickel Corp. (OTCQB: FANCF) (TSX-V: FAN), TMC the metals company Inc. (NASDAQ: TMC), Tesla, Inc. (NASDAQ: TSLA), FPX Nickel Corp. (OTCQB: FPOCF) (TSX-V: FPX), Power Metallic Mines Inc. (OTCBB: PNPNF) (TSX-V: PNPN).

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Silver47 Announces $3 Million Private Placement

Silver47 Announces $3 Million Private Placement

Silver47 Exploration Corp. (TSXV: AGA) ("Silver47" or the "Company") is pleased to announce that it intends to complete a non-brokered private placement of units of the Company (the "Units"), at a price of $0.50 per Unit, for aggregate gross proceeds of up to $3 million (the "Private Placement").

Each Unit will consist of one common share in the capital of the Company (each, a "Common Share") and one-half of one Common Share purchase warrant of the Company (each whole warrant, a "Warrant"). Each Warrant will entitle the holder thereof to purchase one Common Share (each a "Warrant Share") at a price of $0.75 per Warrant Share for a period of 36 months after the closing date of the Private Placement.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
High-Grade Gold Confirmed at Bronzewing South

High-Grade Gold Confirmed at Bronzewing South

Initial assays returned for visible gold zone logged in diamond drill core~40m south of the Bronzewing Mining Lease, with drilling continuing

Hammer Metals Ltd (ASX: HMX) (“Hammer” or the “Company”) is pleased to provide an update on recent exploration progress at its 100%-owned Yandal Gold Project in Western Australia. Diamond drilling continues with the first batch of assays now received for the zone of visible gold reported to the ASX on 2 September 2025. Drilling of the diamond tail to drill-hole BWSRCD081 was completed a depth of 561.7m.

The diamond drilling program has continued with two diamond tails completed at the Bronzewing Central Target, located approximately 1.7km to the south of the Eastern Target Zone. A follow-up diamond tail will commence shortly at the Eastern Target, with drilling anticipated to conclude towards the end of September. Results from this program will continue to be submitted to the laboratory in batches, with results anticipated to be received throughout September and into mid-October.

Keep reading...Show less
Gold pan holding pieces of gold from creek placer deposit, with words "5 Top Canadian Mining Stocks This Week."

Top 5 Canadian Mining Stocks This Week: Guardian Exploration Gains 94 Percent

Welcome to the Investing News Network's weekly look at the best-performing Canadian mining stocks on the TSX, TSXV and CSE, starting with a round-up of Canadian and US news impacting the resource sector.

On Thursday (September 11), Canadian Prime Minister Mark Carney revealed the first tranche of projects selected by the newly created Major Projects Office. The goal of the office is to accelerate timelines for projects deemed to be in the national interest, which include infrastructure, natural resources and technology.

The projects include the Phase 2 expansion of LNG Canada’s Kitimat facility, the development of Foran Mining's (TSX:FOM,OTCQX:FMCXF) McIlvenna Bay copper-zinc mine in Saskatchewan, and an expansion of Newmont (TSX:NGT,NYSE:NEM,ASX:NEM) and Imperial Metals' (TSX:III) Red Chris copper-gold mine in Northern BC.

Keep reading...Show less
Gold bars with rising graph overlay and text "Weekly Editor's Picks."

Editor's Picks: Gold Knocks Out Inflation-Adjusted High, Silver Breaks US$42

Gold's record-setting price run continued this week, with yet another new all-time high in the books. Silver also fared well, breaking US$42 per ounce.

According to Bloomberg, gold has now also surpassed its inflation-adjusted all-time high of US$850 per ounce, which it set more than 45 years ago on January 21, 1980. The news outlet notes that at the time the US was dealing with currency issues, inflation and recession concerns.

These are problems that sound all too familiar today. This week brought the release of the latest US consumer price index (CPI) data, which shows a 0.4 percent month-on-month increase for the all-items index — that's ahead of estimates and the most since the start of 2025.

Keep reading...Show less
Hamak Gold

Admission to Trading on the OTCQB Market

Hamak Gold Limited (LSE: HAMA / OTCQB: HASTF), a company combining traditional gold exploration in West Africa with a Digital Asset Treasury Management strategy, is pleased to announce that the Company's shares have been admitted to trading on the OTC Venture Market ("OTCQB") in the United States, under the symbol "HASTF". No new Ordinary Shares have been issued by the Company for this parallel trading of its shares.

The purpose of the listing of shares on the OTCQB is to broaden the Company's exposure to the North American investor markets and to increase trading liquidity in a drive to deliver shareholder value.

Keep reading...Show less
Stock market display with "mergers and acquisitions" in green and white text.

Barrick’s Plan to Sell Hemlo Mine for US$1.09 Billion Marks Canadian Exit

Barrick Mining (TSX:ABX,NYSE:B) has agreed to sell its Hemlo gold mine in Ontario, Canada, for up to US$1.09 billion, continuing the company's shift away from non-core assets.

The company announced on Thursday (September 11) that Carcetti Capital (TSXV:CART.H), which will be renamed Hemlo Mining, will acquire the mine under terms that include US$875 million in cash, US$50 million in Hemlo Mining shares and as much as US$165 million in contingent payments tied to future gold prices and production.

Barrick President and Chief Executive Mark Bristow said the sale is part of the company’s ongoing capital allocation approach, noting that proceeds will help bolster the firm's balance sheet and fund returns to shareholders.

Keep reading...Show less
Gold nuggets beside text: "5 Top Australian Mining Stocks This Week."

Top 5 Australian Mining Stocks This Week: Zenith Minerals Strikes Gold at Red Mountain

Welcome to the Investing News Network's weekly round-up of the top-performing mining stocks listed on the ASX, starting with news in Australia's resource sector.

Companies focused on a mix of minerals and resources once again form this week’s top stocks list, including ones searching for gold, rutile, graphite, lithium and oil.

Significant news, including broad mineralisation discoveries and new acquisitions, drove the top performers this week, which you can learn more about in the list below.

Looking at the bigger picture, Australian lithium stocks took a hit this week following the announcement of Chinese battery giant Contemporary Amperex Technology's (SZSE:300750,HKEX:3750) reported production restart at its Jianxiawo lithium mine in Yichun. Lithium prices and mining companies had previously been lifted in mid-August after the mine was suspended.

Keep reading...Show less

Latest Press Releases

Related News

×