Argentina Lithium Completes Initial Drill Campaign at Rincon West, Announces Positive Results from Ninth Exploration Well

Argentina Lithium Completes Initial Drill Campaign at Rincon West, Announces Positive Results from Ninth Exploration Well

TSX Venture Exchange (TSX-V): LIT  
Frankfurt Stock Exchange (FSE): OAY3
OTCQB Venture Market (OTC): PNXLF

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTC: PNXLF), ("Argentina Lithium" or the "Company") reports the completion of the ninth exploration hole at its Rincon West Project in Salta Province Argentina returning a 258 m interval ranging from 287 to 402 mgl lithium . Two portions of this interval were not sampled, one length of 42 m and a second length of 33 m .

Argentina Lithium & Energy Logo (CNW Group/Argentina Lithium & Energy Corp.)

"Our ninth exploration hole has returned the highest peak lithium value and longest concentrated brine interval reported to date on the Rincon West project. This rich brine zone remains open to the north, clearly demonstrating the requirement to expand drilling in this direction in a future campaign. These nine holes have overall produced the results we anticipated when we began exploration a year ago, demonstrating that the concentrated brines from the neighboring salt flat extend through the western basin." stated Miles Rideout , V.P. of Exploration.

Nikolaos Cacos , CEO of Argentina Lithium added "Thus far, the Rincon West project has been a great success. We acquired our initial property at Salar de Rincon only 20 months ago. We have since added two new property blocks on the salar. With the initial drilling completed on the Villanoveño II block, our team is now working with external consultants to assess all of the data collected and to build a 3D model to support future resource estimation. Additionally, our drill contractor is scheduled to begin drilling five holes on the adjacent Rinconcita II block shortly, which should wrap up near the end of this year. We will then move our exploration focus to the Company's third property in the Rincon Salar, the Paso de Sico block further north. Recent developments have shown the Rincon Salar to be one of the standout basins in the Lithium Triangle, with two neighboring projects now entering production."

The results of the brine analyses, type of sample collected, and the respective intervals from which the brine was recovered are shown in Table 1. Drill collar information is presented in Table 2.

Table 3 presents a brief summary of the results of the initial nine-hole drill program executed over the Villanoveño II block at Rincon West over the last 12 months.

The Rincon West Project is located west and north of Rio Tinto's adjacent Rincon Project, and covers 3742.8 hectares of the salar basin. Figure 1 presents a map of the Rincon West property showing the positions of all nine completed exploration holes (see News Releases dated July 13, 2022 , October 3, 2022 , October 25, 2022 , January 26, 2023 and April 24, 2023 ). The map in Figure 1 displays the drill locations overlaid on the conductive zones delineated with TEM geophysics (see May 2, 2022 News Release ; Note: the easternmost property extension, the Rinconcita II block, was acquired after the completion of the TEM survey and therefore shows no geophysics results).

Table 1: Interval data and results of brines analyses for lithium, potassium,
  and magnesium   for drill hole RW-DDH-009

Sample interval (m)

Sample
Method

Li

K

Mg

Density

From

To

Thickness


(mg/litre)

(g/ml)

RW-DDH-009




59

71

12

Single packer

1.001

71

83

12

Single packer

31

554

305

1.019

83

95

12

Single packer

287

5256

2588

1.165

95

107

12

Single packer

323

6066

2857

1.183

107

119

12

Single packer

339

6390

2988

1.189

119

131

12

Single packer

304

5783

2685

1.172

173

194

21

Single packer

386

7116

3636

1.211

194

218

24

Single packer

375

6971

3439

1.204

218

242

24

Single packer

384

7376

3350

1.206

242

266

24

Single packer

402

7711

3495

1.215

299

341

42

Single packer

331

6292

2905

1.18

75

78

3

Double packer

15

295

167

1.009

* The drill hole was inclined vertically; the brine hosting strata are believed to be flat lying resulting in reported intervals approximating true thickness.

Technical Details

RW-DDH-009 was executed with diamond drilling (HQ-diameter), permitting the extraction of core samples of the salar basin formations and recovery of brine samples where possible. Drilling was executed between February 28 and March 23, 2023 stopping at 341.0 metres depth in altered volcanics. Geophysical profiling and lining the hole with 2" diameter PVC filters and tubing were completed on March 28, 2023 .

Drilling was carried out by Salta-based AGV Falcon Drilling SRL, under the supervision of Argentina Lithium's geologists.

Table 2: Collar and maximum depth information for RW-DDH-009

Hole ID

East

North

Elevation

Azimuth

Dip

Depth


UTM Zone 19S (WGS84)

(m)

(deg.)

(deg.)

(m)

RW-DDH-009

680579

7339278

3771

n/a

90

341.0

Argentina Lithium's preferred method for brine sampling deploys a 'single packer' sampling unit during drilling. The packer sampling method allows the recovery of brine samples at specific depths while sealing the hole at the top and bottom of the interval. For single packer sampling, an inflatable seal closes the top of the interval; the lower limit of drilling represents the bottom of the interval. In certain instances, double packer sampling is conducted following the completion of drilling. In this case, inflatable seals are employed to close both the top and bottom of the sample interval. The maximum span of double packer sampling is limited to less than 4 m by the height of the drill mast and other equipment limitations.

Observations regarding RW-DDH-009

RW-DDH-009 extends drilling northwards from previous holes. From near surface to 39 m depth, gravel and sand units were crossed, with rock clasts observed in the sandy sediments below 24 m depth. Sandy beds, and also minor gravel laminations were observed from 39 m to 59 m . Below this followed 2 m of silt and then 2 m of black sands. Medium-to-fine gravels were tested between 63 m and 110 m depths, followed by ignimbrites to 155 m . From 155 m to 238 m , a medium to coarse breccia was tested containing ignimbrite clasts. This unit exhibited fracturing and alteration at several levels. Ignimbrite, certain levels with fracturing, were tested between 238 m and 266 m depths, followed by a 2 m thick altered fault zone. An auto breccia of ignimbrite containing igneous clasts was logged to 316 m . Copper oxide streaks were observed within this unit at 289.6 m . Volcanic units with increased fracturing, and also fracture filled with a green mineral, were recovered from 316 m to the bottom of the hole at 341 m .

All core samples recovered in drilling were retained for geologic logging. An extensive selection of samples has been sent for brine recovery testing at an independent laboratory. This analysis remains pending.

Table 3: Summary of key results from initial Villanoveño II drill program

East

North

Elevation

Sample interval (m)

Lithium

News release

UTM Zone19S WGS84

(m)

From

To

Thickness

Range
(mg/litre)

date

RW-DDH-001

3747

73.3

156

82.7

241 to 380

13 July, 2022

681437E

7339184N







RW-DDH-002

3761

182

305

123

337 to 367

3 Oct., 2022

682198E

7337700N







RW-DDH-003

3799

299

353

54

152

25 Oct., 2022

682231E

7335900N







RW-DDH-004

3744

95

227

132

334 to 393

25 Oct., 2022

682086E

7338774N







RW-DDH-005

3808

194

260

66

168 to 209

26 Jan., 2023

680426E

7336767N







RW-DDH-006

3764

167

320

153

329 to 393

26 Jan., 2023

681291E

7338205N







RW-DDH-007

3775

143

321

178

241 to 340

23 Apr., 2023

681453E

7337379N


-30 m of interval not sampled



RW-DDH-008

3781

140

212

72

228 to 355

23 Apr., 2023

680688E

7337736N


-27 m of interval not sampled



RW-DDH-009

3771

83

341

258

287 to 402

Current

680579E

7339278N


-2 lengths (33 and 44 m) of


release




interval not sampled



*All drilling was inclined vertically; the brine hosting strata are believed to be flat lying resulting in reported intervals approximating true thickness.

Analyses and QA/QC

Samples of brine were submitted for analysis to Alex Stewart International Argentina S.A. ("Alex Stewart"), the local subsidiary of Alex Stewart International, an ISO 9001:2008 certified laboratory, with ISO 17025:2005 certification for the analysis of lithium, potassium and other elements. Alex Stewart employed Inductively Coupled Plasma Optical Emission Spectrometry ("ICP-OES") as the analytical technique for the primary constituents of interest, including boron, calcium, potassium, lithium, and magnesium. Measurements in the field included pH, electrical conductivity, temperature and density. The quality of sample analytical results was controlled and assessed with a protocol of blank, duplicate and reference standard samples included within the sample sequence. For the hole RW-DDH-009, one blank and one duplicate sample reported within the acceptable range. A single medium-grade and a single high-grade reference standard sample were included within the submitted sample suite. The medium-grade reference standard analyses within 2 standard deviations (SD) with less than 0.25 relative percent difference (RPD); the high-grade reference standard returned less than 3 SD of the best value; with low RPD (2.90).

Rincon West Project

The following summarizes the properties held within the Rincon West Project. Villanoveño II and Demasia Villanoveño II, totaling 2491 hectares, are held under an option whereby the Company can earn a 100% interest, as described in the Company's September 28, 2021 News Release . Argentina Lithium has also purchased the 460.5 hectare Rinconcita II property, adjacent to Villanoveño II (see August 25, 2022 News Release ). The Company entered into an option agreement to earn a 100% interest in four contiguous mine concessions, the "Paso de Sico" option, totalling 791.3 hectares in the northern part of the Salar de Rincon (see October 6 News Release ).

Qualified Person

Frits Reidel , CPG is a Qualified Person as defined in National Instrument 43-101, and the Principal of Atacama Water, and is independent of Argentina Lithium. Mr. Reidel has reviewed the work carried out by the Company's exploration team at the early-stage Rincon West property. The disclosure in this news release has been reviewed and approved by Mr. Reidel.

About Argentina Lithium

Argentina Lithium & Energy Corp is focused on acquiring high quality lithium projects in Argentina and advancing them toward production in order to meet the growing global demand from the battery sector. The management group has a long history of success in the resource sector of Argentina and has assembled a first-rate team of experts to acquire and advance the best lithium properties in the "Lithium Triangle". The Company is a member of the Grosso Group, a resource management group that has pioneered exploration in Argentina since 1993.

ON BEHALF OF THE BOARD

"Nikolaos Cacos"

_______________________________

Nikolaos Cacos , President, CEO and Director

www.argentinalithium.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain forward-looking statements. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. All statements, other than statements of historical fact, that address activities, events or developments the Company believes, expects or anticipates will or may occur in the future, including, without limitation, statements about the Company's plans for its mineral properties; the Company's business strategy, plans and outlooks; the future financial or operating performance of the Company; and future exploration and operating plans are forward-looking statements.

Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things: the impact of COVID-19; risks and uncertainties related to the ability to obtain, amend, or maintain licenses, permits, or surface rights; risks associated with technical difficulties in connection with mining activities; and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations.   Actual results may differ materially from those currently anticipated in such statements. Readers are encouraged to refer to the Company's public disclosure documents for a more detailed discussion of factors that may impact expected future results. The Company undertakes no obligation to publicly update or revise any forward-looking statements, unless required pursuant to applicable laws. We advise U.S. investors that the SEC's mining guidelines strictly prohibit information of this type in documents filed with the SEC. U.S. investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on our properties.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/argentina-lithium-completes-initial-drill-campaign-at-rincon-west-announces-positive-results-from-ninth-exploration-well-301838359.html

SOURCE Argentina Lithium & Energy Corp.

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/May2023/31/c1234.html

News Provided by Canada Newswire via QuoteMedia

LIT:CA
Argentina Lithium & Energy

Argentina Lithium & Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Argentina Lithium & Energy (TSXV:LIT)

Argentina Lithium & Energy


Keep reading...Show less

Discovery in the Lithium Triangle and Strategic Partnership with Global Automaker

Argentina Lithium and Energy Exhibiting at Booth 2924, PDAC 2025 Convention in Toronto, March 2-5

Argentina Lithium and Energy Exhibiting at Booth 2924, PDAC 2025 Convention in Toronto, March 2-5

Visit Argentina Lithium and Energy (TSXV: LIT) (OTCQB: LILIF) at Booth #2924 at the Prospectors & Developers Association of Canada's (PDAC) Convention at the Metro Toronto Convention Centre (MTCC) from Sunday, March 2 to Wednesday, March 5, 2025.

About Argentina Lithium and Energy

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces 225-metre Lithium Brine Interval at the 14th Exploration Well on the Rincon West Project

Argentina Lithium Announces 225-metre Lithium Brine Interval at the 14th Exploration Well on the Rincon West Project

TSX Venture Exchange (TSX-V): LIT  
Frankfurt Stock Exchange (FSE): OAY3
OTCQB Venture Market: LILIF

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQB: LILIF), ("Argentina Lithium" or the "Company") reports positive results from the fourteenth exploration well at its Rincon West Project in Salta Province Argentina . Sixteen representative 2.5 or 3 m brine samples collected over a 225-metre interval of RW-DDH-14 ranged from 277 to 379 mgl lithium.

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

/NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Amendment to the Terms of the Non-Brokered Private Placement Using The Listed Issuer Financing Exemption

Argentina Lithium Announces Amendment to the Terms of the Non-Brokered Private Placement Using The Listed Issuer Financing Exemption

TSX Venture Exchange (TSX-V): LIT  
Frankfurt Stock Exchange (FSE): OAY3

/NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Applies to Extend Warrants November 06, 2024

Argentina Lithium Applies to Extend Warrants November 06, 2024

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FRA): OAY3
OTCQX Venture Market (OTC): PNXLF

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQX: LILIF) ("Argentina Lithium" or the "Company") announces that the Company has made an application to the TSX Venture Exchange to extend the term of the outstanding warrants as follows:

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
ION Announces US$13.5M Joint Venture on Urgakh Naran, Corporate Updates and Update on Rare Earths Transaction

ION Announces US$13.5M Joint Venture on Urgakh Naran, Corporate Updates and Update on Rare Earths Transaction

Lithium ION Energy Limited (TSXV: ION) (FSE: ZA4) ("ION" or the "Company") is pleased to share that it has entered into a binding Joint Venture Agreement with SureFQ Ltd. ("SureFQ") for the advancement of the Urgakh Naran project in Mongolia, in which ION will continue to hold a 20% free carried interest through to commercial production.

Highlights:

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  Agreement to Secure EUR2.5M in Funding

Altech Batteries Ltd Agreement to Secure EUR2.5M in Funding

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to advise that it is in the process of selling its land in Johor to help fund the ongoing development of the CERENERGY(R) battery project and the Silumina Anodes(TM) battery materials project, as well as to support general working capital requirements.

Highlights

- Altech, subject to receipt of shareholder approval, will have the ability to drawdown up to EUR2.5M in cash funding

- Agreement reached with major shareholder Deutsche Balaton AG to provide funding

- Funding to be provided as Bearer Bonds with interest payable at 7.0% per annum

- Bearer Bonds secured by Altech's Malaysian land

- Repayment of the Bearer Bonds anticipated to be from sale of Altech's Malaysian land

- Shareholder meeting to approve facility anticipated for late April 2025

The Company has also entered into a binding Bond Note Subscription Deed with its major shareholder Deutsche Balaton AG, under which Altech can drawdown up to EUR2.5M in cash in the form of interest-bearing Bearer Bonds.

This funding will allow Altech to progress with its projects without the dilutionary impact to shareholders of a capital raise via a share issue. The repayment of the Bearer Bonds is secured by Altech's Malaysian land and requires Altech shareholder approval, and a General Meeting is anticipated to be convened in late April 2025.

Key terms of the Subscription Agreement are as follows:

- Total Bearer Bond facility of up to EUR2.5M to be drawdown in EUR500K amounts with interest payable at 7.0% per annum.

- Altech shareholders approving the grant of security to Deutsche Balaton AG over its Malaysian land in accordance with any requirement of the ASX, or the ASX granting a waiver from any requirement of the listing rules to obtain shareholder approval.

- a Security and Security Trust Agreement has been entered into under which Altech's 100% owned subsidiary Altech Chemicals Sdn Bhd has pledged security over its Malaysian land as well as a guarantee of repayment of the Bearer Bonds.

- Repayment of Bearer Bonds by maturity date of 31 October 2026.

- Default clauses applicable standard for Subscription Deeds of this nature.

Altech has placed its Malaysian land in Johor on the market for sale. Proceeds from the sale of the land are expected to provide sufficient funds to enable the Bearer Bonds to be repaid in full.



About Altech Batteries Ltd:  

Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
SAGA Metals Extends Claims at the Radar Project by 26% to Cover 20km Inferred Oxide Zone

SAGA Metals Extends Claims at the Radar Project by 26% to Cover 20km Inferred Oxide Zone

Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical mineral discovery, announces the addition of 180 claims spanning 4,500-hectares, increasing the total size of the Radar Titanium-Vanadium (Ti-V) project from 17,250-hecatres to 21,750-hectares. This addition now encompasses the 20km inferred oxide zone starting from the 2025 Hawkeye drill program area heading west towards the new claim boundary.

Michael Garagan, CGO & Director of SAGA comments: "Important information garnered from the combined field & drill programs suggests the oxide layer zone at Hawkeye may be contiguous to Trapper and possibly as far as SAGA's claim extension. These additional claims were strategic in an effort to ensure we've secured the full extent of mineralization. The team will look to apply magnetic geophysical continuity over the entire ‘inferred layering zone of the Dykes River' intrusion. The recently completed drill program over the prospective Hawkeye zone is our proof of concept to a much larger system."

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Argentina Lithium & Energy

Argentina Lithium & Energy Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×