Argentina Lithium Announces Positive Lithium Values in the 12th Exploration Well at the Rincon West Project

Argentina Lithium Announces Positive Lithium Values in the 12th Exploration Well at the Rincon West Project

 
 
TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF  
 

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQX: LILIF) ("Argentina Lithium" or the "Company") reports positive results from the twelfth exploration hole at its Rincon West Project in Salta Province Argentina . Brine samples collected over a 165 metre interval of RW-DDH-012 ranged from 322 to 371 mgl lithium.

 
 

  Argentina Lithium & Energy Logo (CNW Group/Argentina Lithium & Energy Corp.) 

 
 

  "Our ongoing drilling continues to evaluate the Rinconcita II concession that extends from our original claims, eastwards over the salt flat towards the neighboring Rio Tinto concessions. Our twelfth hole demonstrates a long interval of impressive lithium values in porous host lithologies. Thus far, our drilling at Rincon West demonstrates a continuous aquifer of concentrated lithium brines over an extensive basin." stated Miles Rideout , V.P. of Exploration.

 

The results including sampling method, the sample interval data, and the brine analyses for RW-DDH-012 are shown in Table 1. Drill collar information is presented in Table 2. An extensive selection of core samples has been sent to an independent laboratory for brine recovery testing; results are pending.

 

The Rincon West Project covers 5198.8 hectares of the salar basin, consisting of three property blocks adjacent to Rio Tinto's Rincon Project. Drill hole RW-DDH-012 represents the third exploration hole of the 6-hole program planned for the Rinconcita II property, announced in the Company's   October 19, 2023   News Release. The Company is currently completing the access to the next drill platform (RW-DDH-013), representing a further 1000 m step towards the northeast corner of the property block.

 

  Figure 1 presents a map of the western (main) block of the Rincon West project showing the positions of the twelve completed exploration holes (see News Releases dated   July 13, 2022   ,   October 3, 2022   ,   October 25, 2022   ,   January 26, 2023   ,   April 24, 2023   ,   May 31, 2023   and   January 22, 2024   ). The drill locations are overlain on the conductive zones (shaded yellow) delineated by two geophysics campaigns (see News Releases dated   May 2, 2022   and   October 19, 2023   ).

 

  Table 1: Interval data and results of brine analyses for lithium, potassium, and magnesium   for drill hole RW-DDH-01   2*  

 
 
                                                                                                                                                                                                         
 

   Sample Interval (m)  

 
 

   Sample
Method
 
 

 
 

   Li   

 
 

   K   

 
 

   Mg   

 
 

   Density   

 
 

  From  

 
 

  To  

 
 

  Thickness  

 
 

  (mg/litre)  

 
 

  (g/ml)  

 
 

   RW-DDH-012   

 
 
 
 
 
 
 

  48.5  

 
 

  51.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  337  

 
 

  6284  

 
 

  3062  

 
 

  1.201  

 
 

  54.5  

 
 

  57.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  345  

 
 

  6667  

 
 

  3116  

 
 

  1.204  

 
 

  60.5  

 
 

  63.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  355  

 
 

  6884  

 
 

  3143  

 
 

  1.207  

 
 

  66.5  

 
 

  69.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  365  

 
 

  7230  

 
 

  3169  

 
 

  1.212  

 
 

  78.5  

 
 

  81.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  363  

 
 

  7210  

 
 

  3208  

 
 

  1.216  

 
 

  96.5  

 
 

  99.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  329  

 
 

  7087  

 
 

  2764  

 
 

  1.218  

 
 

  102.5  

 
 

  105.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  339  

 
 

  7262  

 
 

  2867  

 
 

  1.218  

 
 

  108.5  

 
 

  111.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  356  

 
 

  7483  

 
 

  3034  

 
 

  1.216  

 
 

  120.5  

 
 

  123.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  347  

 
 

  7202  

 
 

  2971  

 
 

  1.215  

 
 

  126.5  

 
 

  129.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  366  

 
 

  7260  

 
 

  3184  

 
 

  1.212  

 
 

  132.5  

 
 

  135.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  352  

 
 

  7152  

 
 

  3067  

 
 

  1.213  

 
 

  138.5  

 
 

  141.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  371  

 
 

  7451  

 
 

  3298  

 
 

  1.214  

 
 

  144.5  

 
 

  147.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  356  

 
 

  7192  

 
 

  3157  

 
 

  1.216  

 
 

  156.5  

 
 

  159.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  345  

 
 

  7054  

 
 

  3091  

 
 

  1.219  

 
 

  162.5  

 
 

  165.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  335  

 
 

  6858  

 
 

  2998  

 
 

  1.219  

 
 

  168.5  

 
 

  171.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  315  

 
 

  6679  

 
 

  2827  

 
 

  1.22  

 
 

  174.5  

 
 

  177.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  324  

 
 

  6696  

 
 

  2893  

 
 

  1.219  

 
 

  180.5  

 
 

  183.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  327  

 
 

  6694  

 
 

  2914  

 
 

  1.218  

 
 

  186.5  

 
 

  189.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  323  

 
 

  6685  

 
 

  2874  

 
 

  1.217  

 
 

  192.5  

 
 

  195.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  324  

 
 

  6744  

 
 

  2897  

 
 

  1.218  

 
 

  198.5  

 
 

  201.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  324  

 
 

  6718  

 
 

  2860  

 
 

  1.217  

 
 

  204.5  

 
 

  207.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  322  

 
 

  6697  

 
 

  2827  

 
 

  1.217  

 
 

  210.5  

 
 

  213.5  

 
 

  3.0  

 
 

  Single packer  

 
 

  324  

 
 

  6717  

 
 

  2834  

 
 

  1.217  

 
 
 
 
 
 

  *The drill hole was inclined vertically; the brine hosting strata are believed to be flat lying resulting in reported intervals approximating true thickness.  

 
 
 

  Drilling Methodology  

 

RW-DDH-012 was executed with HQ-diameter diamond drilling, permitting the extraction of core samples of the salar basin formations and the recovery of brine samples where possible.

 

Drilling was carried out by Salta-based AGV Falcon Drilling SRL, under the supervision of Argentina Lithium's geologists.

 
 
                     
 

   Table 2: Collar and maximum depth information for RW-DDH-012   

 
 

   Hole ID   

 
 

   East   

 
 

   North   

 
 

   Elevation   

 
 

   Azimuth   

 
 

   Dip   

 
 

   Depth   

 
 
 

  UTM Zone 19S (WGS84)  

 
 

  (m)  

 
 

  (deg.)  

 
 

  (deg.)  

 
 

  (m)  

 
 

  RW-DDH-012  

 
 

  684144  

 
 

  7337989  

 
 

  3722  

 
 

  n/a  

 
 

  90  

 
 

  339.0  

 
 
 

LIT's preferred method for brine sampling deploys a 'single packer' sampling unit during drilling. The packer sampling method allows the recovery of brine samples at specific depths while sealing the hole at the top and bottom of the interval. For single packer sampling, an inflatable seal closes the top of the interval; the lower limit of drilling represents the bottom of the interval.

 

Geophysical profiling and lining the hole with 2" diameter PVC filters have been completed. All core samples recovered in drilling were retained for geologic logging.

 
  Observations regarding   RW-DDH-012  
 

RW-DDH-012 extends drilling eastwards from previous holes over the Rincon salt flat. The hole was completed to 339.5 m depth and a total 23 brine samples extracted using the single packer method were submitted for analysis.

 

Samples collected between 48.5 m depth and 213.5 m depth (the deepest sample) ranged from 322 to 371 mg/l lithium. Over this 165 m interval, 23 single packer brine samples were collected from discrete 3 m intervals, totalling 69.0 m of sampling, which represents 41.8% of the total interval.

 

From surface to 20 m depth, gravels with a sandy-clayey matrix were drilled. Dacite was recovered from 20.0 to 22.9 m , whereupon the drill crossed coarse gray-brown sand, to 52.3 m . Fine black sands were then sampled to 106.5 m depth, followed by reddish clayey sand to 122 m . The drill sampled fine black sands to 129.5, followed by coarse red sand to 135.5 m , then medium brown sand to 144.5 m . Breccia with grey sandy matrix was crossed to 151.0, with clasts of andesite and other compositions. Fine reddish and gray sands were then drilled to 177.4 m , where sulphates were encountered, extending to 178.2 m . Brown, medium-grained sand was then drilled to 180.5, followed by breccia to 185.5 m . Between 185.5 m and 201.4 m , the drill sampled andesitic porphyry with veinlets. From 201.4 to 339.5 m , the drill sampled a sequence of volcanic units (porphyries, breccias and ignimbrites, among others) characterised by the presence of fractures and carbonate or quartz veinlets. Brine sampling in these relatively competent basement units proved unproductive below the initial weathered zone.

 
  Analyses and QA/QC  
 

Samples of brine were submitted for analysis to Alex Stewart International Argentina S.A. ("Alex Stewart"), the local subsidiary of Alex Stewart International, an ISO 9001:2017 certified laboratory, with ISO 17025:2017 certification for the analysis of lithium, potassium and other elements. Alex Stewart employed Inductively Coupled Plasma Optical Emission Spectrometry ("ICP-OES") as the analytical technique for the primary constituents of interest, including boron, calcium, potassium, lithium, and magnesium. Measurements in the field included pH, electrical conductivity, temperature and density.

 

The quality of sample analytical results was controlled and assessed with a protocol of blank, duplicate and reference standard samples included within the sample sequences. For hole RW-DDH-012 the lot contained one blank and two duplicate samples, which all reported within the acceptable range. Single low-grade, medium-grade and high-grade reference standard samples (3 standards in total) were included within the submitted sample suite. The low-grade reference standard analysed higher than 3 standard deviations (SD) of best value, with 8.6 relative percent difference (RPD); the medium-grade reference standard analysed below 3 SD of best value, with 4.9 RPD; the high-grade reference standard analysed below 3 SD of the best value; with 2.9 RPD.

 
  Qualified Person  
 

  Frits Reidel , CPG is a Qualified Person as defined in National Instrument 43-101, is the Principal of Atacama Water Consultants, and is independent of Argentina Lithium. Mr. Reidel has reviewed the work carried out by the Company's exploration team at the early-stage Rincon West property. The disclosure in this news release has been reviewed and approved by Mr. Reidel.

 
  About Argentina Lithium  
 

 Argentina Lithium & Energy Corp is focused on acquiring high quality lithium projects in Argentina and advancing them towards production in order to meet the growing global demand from the battery sector. The Company's recent strategic investment by Peugeot Citroen Argentina S.A., a subsidiary of Stellantis N.V., one of the world's leading automakers, places Argentina Lithium in a unique position to explore, develop and advance its four key projects covering over 67,000 hectares in the Lithium Triangle of Argentina . Management has a long history of success in the resource sector of Argentina and has assembled some of the most prospective lithium properties in the world renowned "Lithium Triangle". The Company is a member of the Grosso Group, a resource management group that has pioneered exploration in Argentina since 1993.

 

ON BEHALF OF THE BOARD

 

"Nikolaos Cacos"

 

_______________________________
Nikolaos Cacos , President, CEO and Director

 
 
 
 

   www.argentinalithium.com     

 
 
 

  Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

 

  This news release contains forward-looking statements. Generally, forward-looking statements can be identified by the use of terminology such as "anticipate", "will", "expect", "may", "continue", "could", "estimate", "forecast", "plan", "potential" and similar expressions. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. All statements, other than statements of historical fact, that address activities, events or developments management of the Company believes, expects or anticipates will or may occur in the future, including, without limitation, statements about the Company's plans for its mineral properties; the Company's business strategy, plans and outlooks; the future financial or operating performance of the Company; and future exploration and operating plans are forward-looking statements.  

 

  Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company. Accordingly, readers should not place undue reliance on the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things: risks and uncertainties related to the ability to obtain, amend, or maintain licenses, permits, or surface rights; risks associated with technical difficulties in connection with mining activities; the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; the state of financial markets in Canada and other jurisdictions; the Company's ability to meet its working capital needs; fluctuations in metal prices; operations in foreign countries and the compliance with foreign laws; environmental regulations or hazards and compliance with regulations associated with mining activities; climate change and climate change regulations; fluctuations in foreign currency exchange rates; failure to obtain or delays in obtaining necessary governmental and regulatory approvals; labour disputes and other risks generally in the mining industry. There may be other factors that cause results or events to not be as anticipated. Actual results may differ materially from those currently anticipated in such statements. Readers are encouraged to refer to the Company's Management's Discussion and Analysis for a more detailed discussion of factors that may impact expected future results. The forward-looking statements contained in this press release are made as of the date hereof or the dates specifically referenced in this press release, where applicable. The Company undertakes no obligation to publicly update or revise any forward-looking statements, unless required pursuant to applicable laws. All forward-looking statements contained in this press release are expressly qualified by this cautionary statement.  

 

  We advise U.S. investors that the SEC's mining guidelines strictly prohibit information of this type in documents filed with the SEC. U.S. investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on our properties.  

 

 Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/argentina-lithium-announces-positive-lithium-values-in-the-12th-exploration-well-at-the-rincon-west-project-302125564.html  

 

SOURCE Argentina Lithium & Energy Corp.

 

 

 

 Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2024/24/c3920.html  

 
 

News Provided by Canada Newswire via QuoteMedia

LIT:CA
The Conversation (0)
Argentina Lithium and Energy Exhibiting at Booth 2924, PDAC 2025 Convention in Toronto, March 2-5

Argentina Lithium and Energy Exhibiting at Booth 2924, PDAC 2025 Convention in Toronto, March 2-5

Visit Argentina Lithium and Energy (TSXV: LIT) (OTCQB: LILIF) at Booth #2924 at the Prospectors & Developers Association of Canada's (PDAC) Convention at the Metro Toronto Convention Centre (MTCC) from Sunday, March 2 to Wednesday, March 5, 2025.

 

About Argentina Lithium and Energy

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces 225-metre Lithium Brine Interval at the 14th Exploration Well on the Rincon West Project

Argentina Lithium Announces 225-metre Lithium Brine Interval at the 14th Exploration Well on the Rincon West Project

 
 

TSX Venture Exchange (TSX-V): LIT  
Frankfurt Stock Exchange (FSE): OAY3
OTCQB Venture Market: LILIF  

 

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQB: LILIF), ("Argentina Lithium" or the "Company") reports positive results from the fourteenth exploration well at its Rincon West Project in Salta Province Argentina . Sixteen representative 2.5 or 3 m brine samples collected over a 225-metre interval of RW-DDH-14 ranged from 277 to 379 mgl lithium.

 

 

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

 
 

  /NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/  

 

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF  

 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Amendment to the Terms of the Non-Brokered Private Placement Using The Listed Issuer Financing Exemption

Argentina Lithium Announces Amendment to the Terms of the Non-Brokered Private Placement Using The Listed Issuer Financing Exemption

 
 

TSX Venture Exchange (TSX-V): LIT  
Frankfurt Stock Exchange (FSE): OAY3  

 

  /NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/  

 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Argentina Lithium Applies to Extend Warrants November 06, 2024

Argentina Lithium Applies to Extend Warrants November 06, 2024

 
 

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FRA): OAY3
OTCQX Venture Market (OTC): PNXLF  

 

Argentina Lithium & Energy Corp. (TSXV: LIT) (FSE: OAY3) (OTCQX: LILIF) ("Argentina Lithium" or the "Company") announces that the Company has made an application to the TSX Venture Exchange to extend the term of the outstanding warrants as follows:

 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Brunswick Exploration Has Now Identified Four Major New Dykes in 2025 at Mirage

Brunswick Exploration Has Now Identified Four Major New Dykes in 2025 at Mirage

 

Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; " BRW " or the " Company ") is pleased to report the final set of results obtained as part of the 2025 Winter drill campaign conducted on its Mirage Project. The Mirage Project is located in the Eeyou Istchee–James Bay region of Quebec, approximately 40 kilometers south of the Trans-Taiga Road. This press release primarily focuses on the drilling work carried out in the eastern extension of the MR-6 dyke and the "Stacked Dyke" zone.

 

  Highlights include:  

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
SAGA Metals Confirms Significant Oxide Layering in the Northwest of the 100% owned Radar Titanium Project in Labrador, Canada

SAGA Metals Confirms Significant Oxide Layering in the Northwest of the 100% owned Radar Titanium Project in Labrador, Canada

 

Saga Metals Corp. ("SAGA" or the "Company") (TSXV: SAGA) (OTCQB: SAGMF) (FSE: 20H) a North American exploration company focused on critical mineral discovery, is pleased to announce SAGA's geophysics team has confirmed significant oxide mineralization in the northwest section of the 100% owned Radar Titanium Property (the "Property) over the site previously drilled back in 1996.

 

  Northwest Zone, Radar Property  

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Lithium Universe Ltd  Interview with Executive Chairman

Lithium Universe Ltd Interview with Executive Chairman

Melbourne, Australia (ABN Newswire) - Lithium Universe Limited (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF) is pleased to announce an interview with Executive Chairman, Iggy Tan at the recent Lithium Supply & Battery Raw Materials Conference in Las Vegas. The interview was conducted by The Rock Stock Channel.

Interview Highlights

- Discussions with potential spodumene feedstock offtakers ongoing

- Further talks with potential OEMs on battery grade lithium carbonate offtake

- All work completed on Becancour Lithium Project - waiting for lithium market recovery

- Acquisition of global rights photovoltaic (PV) solar panel recycling technology

- "Microwave Joule Heating Technology" (MJHT) from Macquarie University

- Utilizes microwave technology to selectively heat and delaminate PV cells

- Today only 15% of waste solar cells are recycled, rest end up in land fill

- Difficult to recycle, high temperature furnace, toxic chemicals, low recovery

- To investigate further recovery of silver, silicon, gallium and indium

To Watch the Interview, please visit:
https://www.abnnewswire.net/lnk/S0S4T95N

 

About Lithium Universe Ltd:  

Lithium Universe Ltd (ASX:LU7) (FRA:KU00) (OTCMKTS:LUVSF), headed by industry trail blazer, Iggy Tan, and the Lithium Universe team has a proven track record of fast-tracking lithium projects, demonstrated by the successful development of the Mt Cattlin spodumene project for Galaxy Resources Limited.

Instead of exploring for the sake of exploration, Lithium Universe's mission is to quickly obtain a resource and construct a spodumene-producing mine in Quebec, Canada. Unlike many other Lithium exploration companies, Lithium Universe possesses the essential expertise and skills to develop and construct profitable projects.

 

 

Source:
Lithium Universe Ltd

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×