Lithium Universe

Apollo Lithium Project - Summer/Fall Exploration Completed

Lithium Universe Limited (“Lithium Universe”, the “Company” or ASX: “LU7”) is pleased to announce the completion of its 2023 summer/fall exploration work programme at the Apollo Lithium Project. The Company was able to expediently complete its on-ground operations during the summer/fall season maximizing productivity. An exploration crew flew in to commence fieldwork campaign at Apollo in August and September 2023. The Company has now received all the final soil laboratory analysis and has devised a drilling strategy for 2024 along a major east-west trending fault shear corridor feature that extends from the Apollo project to Winsome Resources Limited’s Adina Lithium project to the east. Some potential targets have been generated that may be incorporated into a future maiden drilling program in 2024 (see Figure 10).


Highlights

  • Completion of summer/fall exploration campaign
  • An intensive field program comprising geological mapping and sampling
  • Final soil laboratory analysis received
  • Drilling strategy for 2024 along a major east-west trending fault shear corridor feature
  • Feature extends from Apollo project to Winsome Resources Limited’s Adina Lithium project to the east
  • Priority drill targets generated for 2024 drilling campaign

As previously referenced, the Company partnered with Laurentia Exploration Inc, (Laurentia) a highly reputable exploration company based in Québec, Canada encompassing all aspects of the exploration work, including site geological assessments, drilling operations, permitting, helicopter access, and overall logistics management. Laurentia mobilised and commenced field work on the Apollo project in August and September 2023 with personnel accommodation, lodging, and logistics seamlessly managed from Otish Camp located approximately 73 km to the southeast of the Apollo project (see Figure 1). Personnel and equipment mobilisation between Otish Camp and the Apollo Project was undertaken daily by a Bell 212 helicopter (see Figures 1 and 2) operated by Panorama Helicopters providing Heli-Supported operations. The work program was successfully completed on the 9th of September, with demobilisation occurring shortly thereafter.

Figure 1: Location map depicting Apollo Project, Otish Camp location and notable peers within the region.

Figure 2: Laurentia Exploration field team with Bell 212 Helicopter at Otish Camp, James Bay, Quebec.

Prospection, Mapping and Sampling Campaign

A highly focussed summer/fall field mapping and sampling campaign was completed concentrating on high- potential areas highlighted by previous KorrAI satellite and airborne magnetic litho-structural interpretations (Figures 3 and 4). A total of 666 km of traverses and 209 rock chip samples were collected covering a majority of the 240 km2 Apollo permit to evaluate the potential for rare element LCT pegmatite, spodumene mineralisation, and geochemical pathfinders, attempting to identify as follows:

  • Late-stage, large granite intrusions;
  • Greenstone metamorphic rocks;
  • Extensional fault structures and host rock porosity to accommodate the emplacement of late stage, LCT pegmatite dykes.


Click here for the full ASX Release

This article includes content from Lithium Universe Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

LU7:AU
Lithium Universe

Lithium Universe Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Lithium Universe (ASX:LU7)

Lithium Universe


Keep reading...Show less
Lithium Universe

Analyst Firm Targets Share Price Upside for Lithium Universe as Refinery Plans Ramp Up

Description:

Australian investment research firm East Coast Research is estimating a more than 150 percent upside in the share price of Lithium Universe (ASX:LU7) over 12 months, from its current price of $0.21 per share to about $0.53 per share.

Keep reading...Show less
Chariot Corporation

Quarterly Activities Report – March 2024

Chariot Corporation Limited (“Chariot”, “CC9” or the “Company”) is pleased to present our Activities Report and Appendix 5B for the period ending 31 March 2024. In the first quarter of 2024, the Company announced its first hard rock lithium discovery, which was made during the first phase of its diamond core drilling program at Black Mountain, Wyoming USA (“Phase 1 Drilling Program”). Details of the Phase 1 Drilling Program results are set forth below. Chariot is well-positioned for 2024 with adequate liquidity to support further exploration activities across its lithium portfolio and to continue to deliver shareholder value.

Keep reading...Show less
Lithium Universe

Lithium Universe Limited (ASX: LU7) – Trading Halt

Description

The securities of Lithium Universe Limited (‘LU7’) will be placed in trading halt at the request of LU7, pending it releasing an announcement. Unless ASX decides otherwise, the securities will remain in trading halt until the earlier of the commencement of normal trading on Monday, 29 April 2024 or when the announcement is released to the market.

Keep reading...Show less
Quarterly Activities and Cash Flow Report for the Quarter Ended 31 March 2024

Quarterly Activities and Cash Flow Report for the Quarter Ended 31 March 2024

Atlantic Lithium looks ahead to major near-term value-drivers as it advances the Ewoyaa Lithium Project towards shovel-readiness

The Board of Atlantic Lithium Limited (AIM: ALL, ASX: A11, OTCQX: ALLIF, “Atlantic Lithium” or the “Company”), the African-focused lithium exploration and development company targeting to deliver Ghana’s first lithium mine, is pleased to announce its Quarterly Activities and Cash Flow Report for the period ended 31 March 2024.

Keep reading...Show less
White Cliff Minerals

Board Changes

White Cliff Minerals Limited (White Cliff or the Company) is pleased to announce the appointment of Mr. EricSondergaard (“Eric”) as Executive Director, effective immediately.
Keep reading...Show less
Oceana Lithium

Quarterly Activities Report for the Period Ended 31 March 2024

Oceana Lithium Limited (ASX: OCN, “Oceana” or “the Company”) is pleased to present its activities report for the March 2024 quarter.

Keep reading...Show less
Lithium Universe

Lithium Universe Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×