Pine Ridge Uranium Project Delivers Excellent Initial Drill Results

Snow Lake Resources Ltd., dba Snow Lake Energy (NASDAQ: LITM) ("Snow Lake"), a uranium exploration and development company, announces excellent initial drill results on its Pine Ridge Uranium Project ("Pine Ridge"), located in the prolific Powder River Basin in Wyoming, a 5050 joint venture (the "Joint Venture") with Global Uranium and Enrichment Limited ("GUE").

The Joint Venture has completed a total of 33 holes on Pine Ridge, for a total of 12,540m (41,140 ft) of drilling. The drilling has delivered encouraging intercepts including 1.1m at 780 ppm U3O8 within a broader interval of 3.5m at 540 ppm U3O8, and including 1.2m at 1,320 ppm U3O8 within a broader interval of 2.0m at 920 ppm U3O8.

Highlights

  • Drill results from the first 33 drill holes confirm the strong potential of Pine Ridge
  • Wide-spaced drilling focused on aggressively exploring near-surface roll front mineralisation, returned encouraging results, including:
    • 2.0m at 0.092% (920 ppm) U3O8 from 314.8m in PR25-017, including
      • 1.2m at 0.132% (1,320 ppm) U3O8 from 315.0m
    • 2.3m at 0.071% (710 ppm) U3O8 from 411.6m in PR25-008 including
      • 1.7m at 0.085% (850 ppm) U3O8 from 411.9m
    • 1.4m at 0.035% (350 ppm) U3O8 from 237.3m in PR25-004
    • 1.1m at 0.031% (310 ppm) U3O8 from 334.0m in PR25-005
    • 2.1m at 0.034% (340 ppm) U3O8 from 348.1m in PR25-007
    • 1.8m at 0.042% (420 ppm) U3O8 from 388.0 in PR25-009
    • 3.5m at 0.054% (540 ppm) U3O8 from 321.3m in PR25-031, including
      • 1.1m at 0.078% (780 ppm) U3O8 from 321.4m
    • 1.8m at 0.060% (600 ppm) U3O8 from 350.4m in PR25-023 including
      • 1.2m at 0.073% (730 ppm) U3O8 from 350.5m
    • 4.0m at 0.035% (350 ppm) U3O8 from 315.3m in PR25-027
    • 2.1m at 0.048% (480 ppm) U3O8 from 276.1m in PR25-033
    • 1.4m at 0.046% (460 ppm) U3O8 from 378.6m in PR25-020
  • Drilling is ongoing and is expected to continue through to the end of November 2025

CEO Remarks

"We are very pleased and encouraged with the initial drill results from our Pine Ridge uranium project in the Powder River Basin, Wyoming. The wide spaced drilling, designed to target roll-front uranium deposits, has confirmed the presence of redox boundaries and uranium mineralization, and continues to demonstrate the strong development potential of Pine Ridge. Our drill program will continue through the second half of 2025 as we target a maiden mineral resource estimate by year end," said Frank Wheatley, CEO of Snow Lake.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/9547/266678_3c46f297e4ab295b_001.jpg

Figure 1
Drilling at the Pine Ridge Uranium Project in the Powder River Basin of Wyoming, USA.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/9547/266678_3c46f297e4ab295b_001full.jpg

Drill Program

Ongoing results are very encouraging as they have confirmed and further defined the original concept of multiple redox boundaries that are hosted by numerous sand horizons. The drill program was designed to test high-priority areas that were outlined by historical drilling with drill centers of approximately 150m (500 ft.). Drill results will continue to be evaluated, and infill drilling will take place to further outline roll front deposits and develop an inferred mineral resource estimate.

Details of drill results and drill collars are set out in Schedule A.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/9547/266678_3c46f297e4ab295b_002.jpg

Figure 2
Detailed map showing the locations and results of the first and second series of holes drilled at the Pine Ridge Project. Intervals reported at a cutoff of 200 ppm and a thickness of >0.3m.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/9547/266678_3c46f297e4ab295b_002full.jpg

Pine Ridge Uranium Project - Overview

Pine Ridge is an In-Situ Recovery (ISR) uranium exploration project located in the southwestern Powder River Basin of Wyoming, the premier U.S. uranium basin. Pine Ridge is surrounded by existing uranium projects held by UEC and Cameco and is also located only ~15km from Cameco's Smith Ranch Mill, which has a licensed capacity of 5.5Mlbs U3O8 p.a. The Smith Ranch mill is one of the largest uranium production facilities in the U.S.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/9547/266678_3c46f297e4ab295b_003.jpg

Figure 3
Pine Ridge Uranium Project and Adjacent Properties

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/9547/266678_3c46f297e4ab295b_003full.jpg

Qualified Person

Technical information in this news release has been reviewed and approved by Ron Scott PhD, PGeo, who is a Qualified Person as defined by the Securities and Exchange Commission's Regulation S-K 1300.

About Snow Lake Resources Ltd.

Snow Lake Resources Ltd. is a Canadian nuclear fuel cycle and critical minerals company listed on (NASDAQ: LITM), with a portfolio of American focused uranium projects, together with interests in next-generation uranium enrichment and advanced reactor technology. The Pine Ridge Uranium project is an exploration stage project located in Wyoming, United States. Snow Lake also holds a portfolio of additional exploration stage critical minerals projects located in Manitoba and Namibia, as well as investments in a number of public companies with critical minerals assets, including antimony, rare earths, and lithium in North America. Learn more at www.snowlakeenergy.com.

Forward-Looking Statements: This press release contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, Section 21E of the Securities Exchange Act of 1934 and the "safe harbor" provisions under the Private Securities Litigation Reform Act of 1995 that are subject to substantial risks and uncertainties. All statements, other than statements of historical fact, contained in this press release are forward-looking statements, including without limitation statements with regard to Snow Lake Resources Ltd. We base these forward-looking statements on our expectations and projections about future events, which we derive from the information currently available to us. Forward-looking statements contained in this press release may be identified by the use of words such as "anticipate," "believe," "contemplate," "could," "estimate," "expect," "intend," "seek," "may," "might," "plan," "potential," "predict," "project," "target," "aim," "should," "will," "would," or the negative of these words or other similar expressions, although not all forward-looking statements contain these words. Forward-looking statements are based on Snow Lake Resources Ltd.'s current expectations and are subject to inherent uncertainties, risks and assumptions that are difficult to predict. Further, certain forward-looking statements are based on assumptions as to future events that may not prove to be accurate. Some of these risks and uncertainties are described more fully in the section titled "Risk Factors" in our registration statements and annual reports filed with the Securities and Exchange Commission. Forward-looking statements contained in this announcement are made as of this date, and Snow Lake Resources Ltd. undertakes no duty to update such information except as required under applicable law.

Contact and Information
Frank Wheatley, CEO
Investor Relations

Investors:
ir@snowlakelithium.com

Website:
www.snowlakeenergy.com
Follow us on Social Media

Twitter:
www.twitter.com/SnowLakeEnergy

LinkedIn:
www.linkedin.com/company/snow-lake-energy

 

Schedule A

Drill results for the first 17 holes are shown in Table 1 below and the collar details are shown in Table 2.

Hole-ID From (m) To (m) Thickness (m) Avg eU3O8% U3O8 (ppm) GxT (m%)
PR25-004 225.8 226.3 0.5 0.026 260 0.01
and 233.8 234.1 0.3 0.024 240 0.01
and 237.3 238.6 1.4 0.035 350 0.05
PR25-005 331.8 332.1 0.3 0.021 210 0.01
and 334.0 335.1 1.1 0.031 310 0.03
PR25-007 343.5 344.1 0.6 0.032 320 0.02
and 348.1 350.2 2.1 0.034 340 0.07
and 356.0 357.1 1.1 0.027 270 0.03
and 363.9 364.5 0.6 0.024 240 0.01
PR25-008 411.6 413.9 2.3 0.071 710 0.16
including 411.9 413.6 1.7 0.085 850 0.14
PR25-009 388.0 389.8 1.8 0.042 420 0.08
PR25-013 397.6 398.0 0.5 0.024 240 0.01
PR25-016 315.6 316.8 1.2 0.038 380 0.05
and 325.1 325.8 0.8 0.042 420 0.03
PR25-017 311.3 311.6 0.3 0.024 240 0.01
and 314.8 316.8 2.0 0.092 920 0.18
including 315.0 316.2 1.2 0.132 1,320 0.16

 

Table 1: Uranium intercepts from the first seventeen completed holes. Minimum reported thicknesses are >0.3m and grade 0.02% U3O8. "Including" intervals are compiled at a cutoff of 0.05% U3O8.

HoleID Easting
(83_13)
Northing
(83_13)
Elev
(m)
Azimuth
(top of hole)
Dip
(top of hole)
TD
(m)
PR25-001 436976 4783201 1616 0 -90 384
PR25-002 436580 4783386 1625 0 -90 219
PR25-003 436586 4783544 1625 0 -90 244
PR25-004 436929 4783715 1624 0 -90 378
PR25-005 436943 4783573 1620 0 -90 378
PR25-006 437090 4783559 1625 0 -90 378
PR25-007 437091 4783711 1633 0 -90 378
PR25-008 437344 4784949 1673 0 -90 427
PR25-009 437357 4785097 1695 0 -90 427
PR25-010 437341 4785411 1687 0 -90 427
PR25-011 437486 4785544 1692 0 -90 427
PR25-012 437487 4785406 1693 0 -90 427
PR25-013 437490 4785110 1691 0 -90 427
PR25-014 437491 4784957 1672 0 -90 445
PR25-015 437638 4785107 1677 0 -90 445
PR25-016 437646 4785405 1697 0 -90 445
PR25-017 437646 4785548 1685 0 -90 445

 

Table 2: Drill collar details for drillholes.

Drill results for the next 16 holes are shown in Table 3 below and the collar details are shown in Table 4.

Hole ID From
(m)
To
(m)
Thickness
(m)
Avg eU3O8
(%)
U3O8
(ppm)
GxT
(m%)
PR25-019 367.0 367.7 0.8 0.038 380 0.03
PR25-020
including
378.6 379.9 1.4 0.046 460 0.06
378.9 379.6 0.8 0.055 550 0.04
PR25-021 394.9 396.7 1.8 0.027 270 0.05
PR25-023
including
350.4 352.2 1.8 0.060 600 0.11
350.5 351.7 1.2 0.073 730 0.09
PR25-024
and
including
318.1 319.1 1.1 0.050 500 0.05
330.6 332.4 1.8 0.049 490 0.09
331.0 331.9 0.9 0.065 650 0.06
PR25-027 315.3 319.3 4.0 0.035 350 0.14
PR25-029
and
347.2 348.2 1.1 0.039 390 0.04
351.9 352.3 0.5 0.037 370 0.02
PR25-031
including
including
321.3 324.8 3.5 0.054 540 0.19
321.4 322.5 1.1 0.078 780 0.08
323.5 324.2 0.6 0.055 550 0.03
PR25-033
and
including
267.0 268.2 1.2 0.035 350 0.04
276.1 278.3 2.1 0.048 480 0.10
277.4 278.0 0.6 0.054 540 0.03

 

Table 3: Uranium intercepts from the recently completed holes. Minimum reported thicknesses are >0.3m and grade 0.02% U3O8. "Including" intervals are compiled at a cutoff of 0.05% U3O8.

Hole ID Easting
(83_13)
Northing (83_13) Elev
(m)
Azimuth
(top of hole)
Dip
(top of hole)
TD
(m)
PR25-018 437651 4785689 1677 0 -90 445
PR25-019 437487 4785476 1699 0 -90 445
PR25-020 437354 4785171 1688 0 -90 445
PR25-021 437324 4784817 1658 0 -90 427
PR25-022 437259 4783872 1649 0 -90 396
PR25-023 437027 4783631 1633 0 -90 378
PR25-024 436973 4783413 1618 0 -90 378
PR25-025 436903 4783304 1618 0 -90 360
PR25-026 436903 4783194 1618 0 -90 360
PR25-027 436988 4783411 1618 0 -90 360
PR25-028 436576 4783237 1628 0 -90 250
PR25-029 437260 4784022 1648 0 -90 396
PR25-030 437325 4784660 1656 0 -90 415
PR25-031 436668 4782622 1657 0 -90 384
PR25-032 436670 4782773 1641 0 -90 37
PR25-033 436974 4783042 1617 0 -90 366

 

Table 4: Drill collar details for drillholes

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/266678

News Provided by Newsfile via QuoteMedia

LITM
The Conversation (0)
Foremost Lithium Identifies Multiple New High Priority Pegmatite Targets on Its 100% Owned Jean Lake Lithium Project in Snow Lake, Manitoba

Foremost Lithium Identifies Multiple New High Priority Pegmatite Targets on Its 100% Owned Jean Lake Lithium Project in Snow Lake, Manitoba

Foremost Lithium Resource & Technology Ltd. (CSE: FAT) (OTCQB: FRRSF) (FSE: F0R0) (WKN: A3DCC8) ("Foremost" or the "Company") (www.foremostlithium.com), is pleased to announce final interpreted results from the Unmanned Aerial Vehicle, ("UAV") magnetic survey over the Jean Lake property first disclosed on March 1st, 2022 (see press release of same date). Jean Lake is Foremost's 100% owned 1,002-hectare (2,476-acre) property situated in Snow Lake, Manitoba, Canada. The North-East sector of Foremost' s Jean Lake property (claim JOL 9419) directly abuts with Snow Lake Lithium's Sherritt Gordon ("SG") and Grass River ("GRP") pegmatites exposed on Snow Lake Lithium's ADD3203 claim.

Final images from EarthEx Geophysical Solutions Inc. ("EarthEx") magnetic data identified fourteen (14) high priority structural targets for further exploration work in the northern portion of the Jean Lake property. Fourteen sets of independently colored lines are final interpretations of the magnetic low lineaments from a Centre for Exploration Targeting ("CET") analysis and overlay the magnetic "low" picks layer. The coincidence of the magnetic lows with the Beryl Pegmatites and their extension along a trend recognized for its association with Snow Lake Lithium's high-grade SG and GRP spodumene pegmatites is highly encouraging. Of particular importance, Target 11 (BLUE) and Target 10 (GREEN) directly match the previously identified Beryl Pegmatite dykes (B-1 and B-2) which assayed between 3.89% and 5.17% Li2O, respectively. The locations of the B-1 and B-2 Beryl Pegmatite dykes are annotated with the magnetic data in Figure 1.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4689/120836_foremostfigure1_550.jpg

Figure 1 - Magnetic image covering the Jean Lake property. The gap in the image is due to the location of Hydroelectric power lines crossing the property. Location B-1 assayed 3.89% Li2O connects with target 11; and Location B2 (red circle) assayed 5.17% Li2O and connects with target 10.

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/4689/120836_foremostfigure1.jpg

Figure 2 builds upon Figure 1 now showing Snow Lake Lithium's SG and GRP spodumene pegmatites as per their disclosed interim drilling results from March 10th, 2022[1]. There are multiple features which appear to connect the known pegmatite dykes and interpreted lineaments on both properties.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4689/120836_foremostfigure2_550.jpg

Figure 2 - Foremost Lithium's Jean Lake magnetic survey results with overlays of Snow Lake Lithium's SG and GRC pegmatites.

To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/4689/120836_foremostfigure2.jpg

Lindsay Bottomer, Co-founder, and Geoscience Advisor of Foremost states: "The Jean Lake results are very encouraging with regards to the clarity and abundance of the trends of magnetic lows identified from the EarthEx magnetic data. Targets 10 and 11 correspond with the locations of the B-1 and B-2 Beryl Pegmatites on Jean Lake and Targets 5, 6, and 7 are on trend with the SG and GRP on Snow Lake Lithium's ground. On March 10th, 2022, Snow Lake Lithium announced results from exploration hole GRP-001, an exploration hole previously undrilled, returned 2 pegmatite intercepts grading 30% spodumene from 34.8 m to 40.48 m, and 41.86 m to 44.22 m for a total intersection of 8.04 m[1]. It is noteworthy that Snow Lake Lithium's GRP structure appears to directly connect to one of the imaged magnetic low features present on Jean Lake. We have prioritized the top 10 drill targets for an immediate drill program based upon all available data."

Scott Taylor, President and CEO of Foremost Lithium states: "The final magnetic data interpretation, together with the 3.89% Li2O assayed on the B-1 Beryl pegmatite outcrop and the 5.17% Li2O on the B-2 Beryl pegmatite outcrop, and the March 10th disclosure of Snow Lake Lithium's interim drilling results hitting intercepts of 30% spodumene on GRP-001 have imparted a sense of urgency and enthusiasm to extend and expedite our exploration work and drilling campaign throughout the spring and summer on Jean Lake."

Scott Taylor continues: "In recent news, Canada's mining sector is set to receive an unprecedented tranche of Federal incentives to accelerate and scale up production of raw materials used in EV batteries[2]. One example is the new Critical Mineral Exploration Tax Credit (CMETC) which specifically incentivizes capital deployed to support hard rock Canadian lithium exploration and development activities. Stellantis and LG Energy Solution recently announced a new $4.9 Billion-dollar Ontario based Gigafactory scheduled to come online in 2024. American automakers General Motors & Ford Motor Co. have both announced plans to make electric vehicles at Ontario based factories. These long-term macroeconomic catalysts all support the Company's strategic focus and enhance the value of our Snow Lake lithium assets which are situated nearby these massive long-term Canadian EV investments."

Technical information contained in the press release has been approved by the Company's Co-Founder and Geoscience Advisor, Lindsay Bottomer, P. Geo, who is a "Qualified Person" within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects.

About EarthEx Geophysical Solutions Inc.
EarthEx Geophysical Solutions Inc is a Manitoba company, founded in 2014 in Selkirk, Manitoba. The President and Chief Geophysicist, Daniel Card, P. Geo, RPGeo, holds a BSc. Hons degree from the University of Manitoba (2007). EarthEx is highly specialized in geophysical prospecting for hard rock minerals and works with cutting edge technologies and data analysis methodology. Since its inception in 2014, EarthEx has quickly become a household name in the Canadian mineral exploration industry, with rapid and continued growth expected in the coming years.

About Foremost Lithium Resource & Technology Ltd.
Foremost Lithium is an energy technology company focused and committed to become one of the first North American Companies to produce high quality battery-grade lithium hydroxide. Lithium hydroxide is a strategic battery mineral mainly consumed in the production of cathode materials for lithium-ion batteries. Lithium based batteries power the daily use of consumer electronics, enable electrification of the transportation sector, and provide stationary grid storage, critical to developing a clean-energy economy. The Company is prudently and systematically exploring and building tonnage on its four lithium properties, Jean Lake, Grass River, and Zoro located in Snow Lake, Manitoba, and Hidden Lake in the Northwest Territories. Foremost Lithium also holds assets in precious commodities with its Winston Gold/Silver Project in New Mexico, USA.

For further information please contact:

Scott Taylor
President and CEO
Foremost Lithium Resource &Technology Ltd.
Email: scott.taylor@foremostlithium.com
Phone: +1 (604) 330-8067
Twitter: @lithiumlane

Follow us and contact us on social media:
Twitter: @foremostlithium
Linkedin: https://www.linkedin.com/company/foremost-lithium-resource-technology/mycompany
Facebook: https://www.facebook.com/ForemostLithium

Forward-Looking Statements

All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to Foremost within the meaning of applicable securities laws. Foremost provides forward-looking statements for the purpose of conveying information about current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be general or specific and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct, and that objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to market conditions, exploration findings, results, and recommendations, as well as those risks and uncertainties identified and reported in Foremost' s public filings under Foremost' s SEDAR profile at www.sedar.com. Although Foremost has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Foremost disclaims any intention or obligation to update or revise any forward-looking information, whether as lithium as result of new information, future events or otherwise unless required by law.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Aerial view of a brightly lit cityscape at night, with glowing street patterns and waterways.

Landsat Data Shapes Lithium Mining Plans at Nevada’s Thacker Pass

A Nevada lithium project central to US efforts to secure domestic mineral supply is leaning on a half-century-old satellite program for modern answers.

The Geological Survey’s Landsat program, managed with NASA, has provided continuous Earth observations since 1972. Its freely available images allow scientists and industry leaders to measure landscape changes with precision.

Keep reading...Show less
Livium Expands Clean Energy Waste Recycling Capabilities

Livium Expands Clean Energy Waste Recycling Capabilities

Livium (LIT:AU) has announced Livium Expands Clean Energy Waste Recycling Capabilities

Download the PDF here.

Green Technology Metals

Green Technology Metals


Keep reading...Show less
Livium Ltd

Livium Signs Binding Term Sheet with Iondrive related to DES Technology for Clean Energy Waste Recycling

Livium Ltd (ASX: LIT) ("Livium" or the "Company") is pleased to announce it has signed a binding term sheet (“Term Sheet”) with Iondrive Limited (ASX: ION) (“Iondrive”), an Australian company developing an innovative metal extraction process using Deep Eutectic Solvent technology (DES), via their subsidiary Iondrive AU Pty Ltd.

Keep reading...Show less
Glowing digital battery icon with particle connections on dark background.

CATL Mine Restart Pressures Australian Lithium Market

Australia’s lithium sector is facing pressure on the back of news that Chinese battery giant Contemporary Amperex Technology (CATL) (SZSE:300750,HKEX:3750) is expected to resume production at its Jianxiawo mine.

Operations were halted in August when the mine’s licence expired, with the suspension expected to last three months.

Located in Yichun, Jiangxi province, Jianxiawo produces about 65,000 tonnes of lithium carbonate equivalent annually, roughly 6 to 8 percent of global supply. It is the largest mine in Yichun, often referred to as China’s “lithium capital.”

Keep reading...Show less

Latest Press Releases

Related News