UEX Repays Loan From Denison

(TheNewswire)



Saskatoon, Saskatchewan TheNewswire - September 17, 2021 UEX Corporation (TSX:UEX ) ( OTC:UEXCF) (" UEX " or the " Company ") is pleased to announce that the Company has repaid its outstanding term loan (the " Term Loan ") from Denison Mines Corp. (" Denison ").  The Term Loan was used by UEX to purchase JCU (Canada) Exploration Company, Limited (" JCU "), as more particularly described in UEX's news release dated August 3, 2021.

UEX repaid the outstanding balance of C$20.45 million to Denison on September 17, 2021.   Previously, C$20.5 million of the Term Loan was repaid upon UEX transferring 50% of the JCU shares to Denison immediately following the closing of the JCU acquisition (see UEX's news release dated August 3, 2021).  The shares of JCU owned by UEX that were pledged as security to Denison have been released to UEX.

About UEX

UEX is a Canadian uranium and cobalt exploration and development company involved in an exceptional portfolio of uranium projects.

UEX's directly-owned portfolio of projects is located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt which in 2020 accounted for approximately 8.1% of the global primary uranium production.  In addition to advancing its uranium development projects through its ownership interest in JCU,  UEX is currently advancing several other uranium deposits in the Athabasca Basin which include the Paul Bay, Ken Pen and Ōrora deposits at the Christie Lake Project , the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project, the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Development Project and the West Bear Uranium Deposit located at its 100%-owned West Bear Project.

UEX is also 50:50 co-owner of JCU with Denison.  JCU's portfolio of projects includes interests in some of Canada's key future uranium development projects, notably a 30.099% interest in Cameco's Millennium Uranium Development Project, a 10% interest in Denison Mines Wheeler River Project, and a 33.8123% interest in Orano Canada's Kiggavik Project, located in the Thelon Basin in Nunavut, as well as minority interests in nine other grassroots uranium projects in the Athabasca Basin.

UEX is also leading the discovery of cobalt in Canada, with three cobalt-nickel exploration projects located in the Athabasca Basin of northern Saskatchewan, including the only primary cobalt deposit in Canada.  The 100% owned West Bear Project hosts the West Bear Cobalt-Nickel Deposit, the newly discovered Michael Lake Co-Ni Zone, and the West Bear Uranium Deposit.  UEX also owns 100% of two early-stage cobalt exploration projects, the Axis Lake and Key West Projects.

FOR FURTHER INFORMATION PLEASE CONTACT

Roger Lemaitre

President & CEO

(306) 979-3849

Forward-Looking Information

This news release contains statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such forward-looking information is based on a number of assumptions, which may prove to be incorrect. The actual results could differ materially from those anticipated in such forward-looking information as a result of the risk factors including: the timing and content of work programs; results of exploration activities of mineral properties; the interpretation of drilling results and other geological data; and general market and industry conditions. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Copyright (c) 2021 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

The Conversation (0)
Hydrogeological Testing Underway at Lo Herma

Hydrogeological Testing Underway at Lo Herma

Hydrogeological testing has commenced at AMU’s flagship Lo Herma ISR Project in Wyoming’s Powder River Basin to validate aquifer performance concurrent with Phase 1 drilling which aims expand the 8.57Mlb resource at Lo Herma.

American Uranium Limited (ASX:AMU, OTC:AMUIF) (American Uranium, AMU or the Company) is pleased to advise that hydrogeological testing at its Lo Herma ISR uranium project in Wyoming’s Powder River Basin has commenced. Testing is being undertaken by Petrotek Corporation, a leading injection well... Keep Reading...
Drilling Commenced for Sybella-Barkly Uranium and Rare Earth

Drilling Commenced for Sybella-Barkly Uranium and Rare Earth

Basin Energy (BSN:AU) has announced Drilling commenced for Sybella-Barkly uranium and rare earthDownload the PDF here. Keep Reading...
Chris Huggins, CEO of Generation Uranium.

Generation Uranium Eyes Discovery Near 43 Million Pound Lac 50 Uranium Deposit

At the 51st annual New Orleans Investment Conference, Chris Huggins, CEO of Generation Uranium (TSXV:GEN,OTCQB:GENRF), shared how the company is positioning itself in one of Canada’s most promising uranium belts. “We have a property called the Yath. It's a uranium grassroots project that is in... Keep Reading...
Parliment Hill, Ottawa, Ontario.

Powering North America’s Critical Minerals Future

Lithium. Uranium. Vanadium. Titanium. Iron.These are the essential building blocks of the clean energy era — powering electric vehicles, renewable energy storage, defense technologies and advanced manufacturing. They’re also at the heart of a new industrial race that’s reshaping investment,... Keep Reading...

Latest Press Releases

Related News