11 a.m et

Purepoint Uranium to Webcast Live at VirtualInvestorConferences.com December 9th, 2021 at 11 am ET

Purepoint Uranium Group Inc. (TSXV: PTUOTCQB: PTUUF) ("Purepoint" or the "Company"), a company actively operating an exploration pipeline of 12 advanced uranium projects in Canada's Athabasca Basin today announced that Chris Frostad President and CEO, will present live at VirtualInvestorConferences.com on December 9 2021.

DATE: December 9, 2021
TIME: 11 am ET
LINK: https://bit.ly/3d42UQf

This will be a live, interactive online event where investors are invited to ask the company questions in real-time. If attendees are not able to join the event live on the day of the conference, an archived webcast will also be made available after the event.

It is recommended that investors pre-register and run the online system check to expedite participation and receive event updates.

Learn more about the event at www.virtualinvestorconferences.com .

Recent Company Highlights:

The Company recently released its upcoming exploration plans that includes:

  • In 2022, the Hook Lake JV is turning its attention to the Carter Corridor;
    • 25km band of graphitic conductors running parallel to the Patterson trend, where initial drilling has shown significant opportunity for discovery.
  • Winter drilling will focus on the Company's 100% owned Red Willow project;
    • Red Willow drilling will include the expansion of the Osprey discovery (RW-40 with 0.47% U 3 O 8 over 1.5m ) and the Geneva discovery (RDW14-08 with 0.68% U 3 O 8 over 0.3m ).
  • Summer/Fall drilling will cover the 100% owned Turnor Lake project;
    • Turnor drilling will include the Serin Zone that lies along the La Rocque conductive corridor, host to IsoEnergy's Hurricane Deposit.
  • In addition to this year's drilling, geophysical programs have been planned for the Tabbernor Block and Russell South projects.
  • Details on each specific exploration program will be released prior to their commencement.
  • Drilling is currently underway at Henday Lake through December.
  • The Q4 video update is available at: https://purepoint.ca/news/exploration-2022-lighting-up-the-basin .

About Purepoint
Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) actively operates an exploration pipeline of 12 advanced projects in Canada's Athabasca Basin. In addition to its flagship joint venture project at Hook Lake with partners Cameco and Orano and a second joint venture with Cameco at Smart Lake, Purepoint also holds ten, 100% owned projects with proven uranium rich targets. With an aggressive exploration program underway on multiple projects, Purepoint is emerging as the preeminent uranium explorer in the world's richest uranium district.

About Virtual Investor Conferences ®
Virtual Investor Conferences (VIC) is the leading proprietary investor conference series that provides an interactive forum for publicly-traded companies to meet and present directly with investors.

A real-time solution for investor engagement, Virtual Investor Conferences is part of OTC Market Group's suite of investor relations services specifically designed for more efficient Investor Access.  Replicating the look and feel of on-site investor conferences, Virtual Investor Conferences combine leading-edge conferencing and investor communications capabilities with a comprehensive global investor audience network.

View original content to download multimedia: https://www.prnewswire.com/news-releases/purepoint-uranium-to-webcast-live-at-virtualinvestorconferencescom-december-9th-2021-at-11-am-et-301437831.html

SOURCE VirtualInvestorConferences.com

News Provided by PR Newswire via QuoteMedia

The Conversation (0)
A road sign displaying the Colorado flag and an arrow, set against a blue sky with white clouds.

Frontier Nuclear Inks Royalty Deal for Colorado Mine Waste Recovery

Frontier Nuclear and Minerals (NASDAQ:FNUC) has signed an agreement with DISA Technologies to extract uranium and critical minerals from historical waste dumps at the Maybell uranium project in Colorado.Under the terms of the transaction, DISA will fully fund and operate the remediation program.... Keep Reading...
Map of Saskatchewan marked with a red pin.

Denison Secures Indigenous Backing for Wheeler River

Denison Mines (TSX:DML,NYSEAMERICAN:DNN) announced that it has secured formal indigenous backing for its flagship Wheeler River uranium project after the Peter Ballantyne Cree Nation (PBCN) withdrew a lawsuit challenging the development.The First Nation filed the legal challenge in November last... Keep Reading...
Map with red pin over Regina, Saskatchewan.

IsoEnergy and Cameco Pause Operations Due to Wildfires and Mill Repairs

Ongoing wildfires and processing equipment failures have forced temporary shutdowns at two uranium operations in Northern Saskatchewan's prolific Athabasca Basin region.Uranium explorer IsoEnergy (TSX:ISO,NYSEAMERICAN:ISOU) has halted exploration and evacuated the majority of its field personnel... Keep Reading...
Metals.io

Metals.io Opens Cobalt and Nickel Investment to Market

Blockchain-powered platform Metals.io has purchased and tokenized cobalt and nickel as of June 2026, allowing investors to own the metals through xCo and xNi tokens.In an article by Mining.com, it was stated that this move expands the company’s offerings, such as tokenized uranium through xU3O8,... Keep Reading...
Wooden blocks with "M&A" on a table over documents, plant in background.

IsoEnergy Finalizes Toro Energy Acquisition

IsoEnergy (TSX:ISO,NYSEAMERICAN:ISOU) has finalized its acquisition of Australia's Toro Energy, consolidating its North American asset base with advanced Western Australian deposits.First announced in October 2025, the transaction transfers full ownership of Toro’s scoping-stage Wiluna uranium... Keep Reading...
Two large cooling towers against a cloudy sky with sunlight filtering through, surrounded by fences and lampposts.

US Backs Westinghouse with US$17.5 Billion for New Nuclear Reactors

The US Department of Energy has issued a US$17.5 billion conditional loan commitment to finance bulk orders of long-lead components for the construction of 10 new large-scale reactors across the country.The goal is to place 10 new large reactors with finalized designs under construction by... Keep Reading...

Interactive Chart

Latest Press Releases

Related News