Wheeler River JV Completes Successful 2021 Phoenix ISR Field Testing Program

(TheNewswire)

UEX Corporation

Saskatoon, Saskatchewan TheNewswire - October 29, 2021 UEX Corporation (TSX:UEX ) ( OTC:UEXCF) (" UEX " or the " Company ") is pleased to announce that its 50% owned subsidiary, JCU (Canada) Exploration Company, Limited (" JCU ") and Denison Mines Corp. (" Denison ") have completed a successful 2021 In-Situ Recovery ("ISR") Field Test Program.  The program was completed within the commercial-scale ISR test pattern installed in the Phase 1 area of the high-grade Phoenix uranium deposit on the Wheeler River Project.

The Wheeler River Joint Venture is 10% owned by JCU and 90% by Denison, who is the operator of the WRJV.  JCU is 50% owned by UEX and 50% by Denison, and is operated by UEX.

The 2021 ISR test program was able to measure production flow-rates between drill holes, confirm hydraulic control of injected solution during the ion tracer tests, determine breakthrough times between wells, and demonstrate the ability to remediate the test well pattern.   The Test Program was undertaken to increase confidence in the potential application of the ISR mining method at the Phoenix Deposit and to support the recently announced Feasibility Study (see UEX News Release dated September 22, 2021).

Further details and results of the Phoenix ISR field test program can be found in Denison's news release dated October 28, 2021 and filed on Denison's profile on SEDAR.com

Qualified Persons

The technical information in this news release has been reviewed and approved by Roger Lemaitre, P.Eng., P.Geo., UEX's President and CEO, who is considered to be a Qualified Person as defined by National Instrument 43-101.

About UEX

UEX is a Canadian uranium and cobalt exploration and development company involved in an exceptional portfolio of uranium projects.

UEX's directly-owned portfolio of projects is located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt which in 2020 accounted for approximately 8.1% of the global primary uranium production.  In addition to advancing its uranium development projects through its ownership interest in JCU,  UEX is currently advancing several other uranium deposits in the Athabasca Basin which include the Paul Bay, Ken Pen and Ōrora deposits at the Christie Lake Project , the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project, the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Development Project and the West Bear Uranium Deposit located at its 100%-owned West Bear Project.

UEX is also 50:50 co-owner of JCU with Denison.  JCU's portfolio of projects includes interests in some of Canada's key future uranium development projects, notably a 30.099% interest in Cameco's Millennium Uranium Development Project, a 10% interest in Denison Mines Wheeler River Project, and a 33.8123% interest in Orano Canada's Kiggavik Project, located in the Thelon Basin in Nunavut, as well as minority interests in nine other grassroots uranium projects in the Athabasca Basin.

UEX is also leading the discovery of cobalt in Canada, with three cobalt-nickel exploration projects located in the Athabasca Basin of northern Saskatchewan, including the only primary cobalt deposit in Canada.  The 100% owned West Bear Project hosts the West Bear Cobalt-Nickel Deposit, the newly discovered Michael Lake Co-Ni Zone, and the West Bear Uranium Deposit.  UEX also owns 100% of two early-stage cobalt exploration projects, the Axis Lake and Key West Projects.

FOR FURTHER INFORMATION PLEASE CONTACT

Roger Lemaitre

President & CEO

(306) 979-3849

Forward-Looking Information

This news release contains statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such statements are based on UEX's current expectations, estimates, forecasts and projections. Such forward-looking information includes statements regarding the West Bear Co-Ni Property, the Christie Lake Property drill program, the Hidden Bay Property, the Shea Creek Property, UEX's drill hole results, uranium, cobalt and nickel prices, outlook for our future operations, plans and timing for exploration activities, and other expectations, intentions and plans that are not historical fact. Such forward-looking information is based on certain factors and assumptions and is subject to risks, uncertainties and other factors that could cause actual results to differ materially from future results expressed or implied by such forward-looking information. Important factors that could cause actual results to differ materially from UEX's expectations include uncertainties relating to the, interpretation of drill results and geology, assay confirmation, additional drilling results, continuity and grade of deposits, fluctuations in uranium, cobalt and nickel prices and currency exchange rates, changes in environmental and other laws affecting uranium, cobalt and nickel exploration and mining and other risks and uncertainties disclosed in UEX's Annual Information Form and other filings with the applicable Canadian securities commissions on SEDAR. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Copyright (c) 2021 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

The Conversation (0)
Nuclear Fuels

Nuclear Fuels


Keep reading...Show less
justin huhn, uranium periodic symbol

Justin Huhn: Uranium Summer Slump Paves Way for Fall Price Growth

Despite starting the year strong with prices trending above US$106 per pound, uranium values have spent much of the last six months contracting.

Justin Huhn, founder and publisher of Uranium Insider, spoke with the Investing News Network on October 4 about what has depressed prices in 2024 and where the energy fuel is likely to go in the months ahead.

“I've been following this market for about seven, pushing eight years,” Huhn said. "At this point, I've seen a lot of volatility, some screaming rallies, some extremely difficult to handle pullbacks and terrible sentiment on multiple occasions."

Keep reading...Show less
Uranium on periodic table of elements.

EnCore Energy and Boss Energy Launch Alta Mesa Uranium Plant

The Alta Mesa in-situ recovery uranium central processing plant (CPP) in South Texas is now open, enCore Energy (TSXV:EU,NASDAQ:EU) announced earlier this week.

A 70/30 joint venture between EnCore and Boss Energy (ASX:BOE,OTCQX:BQSSF), Alta Mesa began production from its wellfield in June. The companies are targeting full operational capacity by 2026 following a phased ramp up.

The operations are located 80 miles from enCore's Rosita central processing plant (CPP) and wellfield, and 75 miles from its Kingsville Dome CPP and wellfield. The company's Rosita uranium operations came online last November.

A grand opening was held at the Alta Mesa CPP and wellfield on October 3, with former US president George W. Bush among the event's 300 attendees.

Keep reading...Show less
Uranium ore with uranium periodic symbol.

Cosmos Reports Assays from Nut Lake South Uranium Project in Thelon Basin

Uranium-focused Cosmos Exploration (ASX:C1X) announced the assay results from its maiden rock sampling program at the Nut Lake South project in Thelon Basin, Nunavut, Canada.

A total of 16 rock chips returned uranium results above 0.3 percent U3O8 along with associated metals. The samples were gathered from three prospects: the new Gyrfalcon and Snow Goose prospects and Tundra Swan.

High-grade mineralisation was seen at Gyrfalcon, with grades up to 1.2 percent uranium, 1.0 percent molybdenum, 31 grams per tonne silver, 0.4 percent lead and 487 parts per million copper.

Snow Goose results also included high grades, assaying up to 1.1 percent uranium, 0.3 percent molybdenum, 4.8 grams per tonne silver, 0.4 percent lead and 509 parts per million copper.

Keep reading...Show less
Boss Energy (ASX:BOE)

Official Opening of Alta Mesa Uranium Project, Texas

Boss Energy Limited (ASX: BOE|OTCQX: BQSSF) is pleased to announce that its 30 per cent-owned Alta Mesa ISR Uranium Project in South Texas has been officially opened.

Keep reading...Show less
Elevate Uranium (ASX:EL8)

Resource Upgrade Marks New Phase of Growth for Koppies Uranium Project

Elevate Uranium Limited (“Elevate Uranium”, or the “Company”) (ASX:EL8) (OTC:ELVUF) is pleased to announce an upgrade of the Koppies Deposit JORC Mineral Resource Estimate (“MRE”) from Inferred to the Indicated status, with 78% of the resource now in the Indicated category. The Koppies deposit is part of the Koppies Uranium Project and is wholly owned by Elevate Uranium.

Keep reading...Show less

Latest Press Releases

Related News

×