aben resources ltd

Aben Resources Executes Agreement on Red Lake Area Gold Project, Finalizes Plan for 2021 Work Program at the Forrest Kerr Project

Aben Resources Ltd. (TSX-V: ABN ) (OTCQB: ABNAF ) (Frankfurt: E2L2 ) ("Aben" or "the Company") is pleased to announce that it has formalized an Option Agreement with an arms-length third party whereby the Company will hold the exclusive right to earn a 100% interest in the Pringle North Gold Project located north of the town of Red Lake in the Red Lake Mining District of Northwestern Ontario.

Pringle North Gold Project

The Property consists of 5 contiguous mining claims covering approximately 1,881 hectares. The property is 60km north of the town of Red Lake and is located 15km east of the all-weather Nungesser Road. This area has been recently identified by the "Ministry of Energy, Northern Development and Mines Recommendations for Exploration 2020-2021" for its deep-seated structural similarities that are associated with the Red Lake Gold Camp and Great Bear Resource's Dixie Gold Project. This deep-seated structure (named the "E-1 Extensional Fault") that occurs along this trend was delineated by seismic surveys and is considered a third deep-tapping structure that may have provided fluid pathways for gold mineralization to the mines and recent discoveries in the region. Age determination (by Sanborn et al, 2004) dates this sedimentary belt and assigns it to the Balmer Assemblage which is host to the gold mines in the Red Lake Camp.

Figure 1. Regional Location
https://abenresources.com/site/assets/files/4218/regional_location.png

Figure 2. Metal Occurrences
https://abenresources.com/site/assets/files/4218/metal_occurrences.png

Figure 3. Local Claim Fabric
https://abenresources.com/site/assets/files/4218/local_claim_fabric.png

Under the terms of the Agreement, the Company may acquire 100% right, title, and interest in and to the Property by paying to the Optionors a total of $97,000 and issuing to the Optionors a total of 320,000 common shares as follows:
(i)  $18,000 upon signing;
(ii) 120,000 Shares upon TSX Venture Exchange ("TSXV") approval;
(iii) $24,000 and 100,000 Shares on the first anniversary of TSXV approval; and
(iv) $55,000 and 100,000 Shares on the second anniversary of TSXV approval.
The Optionors shall retain a 1.5% Net Smelter Returns Royalty, of which the Company may purchase 0.5% at any time for $600,000.

Forrest Kerr Gold Project

Aben Resources would like to provide a corporate update on the Company's exploration plans for 2021 and going forward. First, the Company would like to thank the shareholders for their understanding and patience as we start the process of identifying new gold projects with great exploration upside and potential. It is the Company's desire to expand the project base to facilitate exploration on a year-round basis. This does not mean that Aben is abandoning the Forrest Kerr Gold Project. Given the Forrest Kerr Project's size, there remains significant exploration potential that the Company will consider for the future.

Currently, final planning is underway for a 30-day surface exploration program to be initiated in early August on Aben's fully permitted Forrest Kerr Project, located in the Golden Triangle region of British Columbia. 2021 fieldwork will consist of soil geochemical sampling, prospecting and geological mapping in specific areas of the property which have seen limited follow-up from earlier work.

The Forrest Kerr Property consists of 4 separate claim blocks comprised of 56 mineral claims (23,397 ha) owned 100% by Aben. Numerous areas of interest have been identified since Aben began systematic exploration in 2016, with a total of 72 drill holes (22,958m/75,302') completed. The Boundary Valley (3.5 km x 1.0 km) hosts significant surface gold mineralization and complex structural intersections, both of which are important indicators of the potential for discovery of more sub-surface high-grade gold mineralization. In 2018, Aben reported grades ranging from trace values to a high of 38.7 g/t Au over 10.0m from 114.0-124.0m including 331.0 g/t Au over 1.0m from in Hole FK18-10.

Forrest Kerr Gold Project, Golden Triangle, BC claims map:
https://abenresources.com/site/assets/files/4087/abn_forrest_kerr_project_map.pdf

Cornell McDowell, P.Geo., V.P. of Exploration for Aben Resources, has reviewed and approved the technical aspects of this news release and is the Qualified Person as defined by National Instrument 43-101.

About Aben Resources:

Aben Resources is a well-funded, gold-focused Canadian junior exploration company developing quality gold-focused projects in British Columbia, Saskatchewan, Ontario, and the Yukon Territory.

For further information on Aben Resources Ltd. (TSX-V: ABN ), visit our Company's web site at www.abenresources.com .

Aben Resources Ltd.

"Jim Pettit"
______________________
JAMES G. PETTIT
President & CEO

For further information contact:
Aben Resources Ltd.
Telephone: 604-416-2978
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@abenresources.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

The Conversation (0)
Aben Resources (TSXV:ABM)

Aben Resources

Exploration in Canada’s Pre-eminent Gold Camps and Graphite in the Kootenays

Exploration in Canada’s Pre-eminent Gold Camps and Graphite in the Kootenays Keep Reading...
Hand holding stylus near a gold bar, labeled "Weekly Editor's Picks."

Editor's Picks: Gold Price Recovers from Biggest One-Day Drop in 12 Years

The gold price declined from its recent all-time highs this week, sinking to nearly US$4,000 per ounce and recording its biggest one-day decline in more than 12 years.Silver took a similar hit, slipping back below the US$50 per ounce level.The drops have been attributed to factors like a... Keep Reading...
Golconda Gold (TSXV:GG)

Gold and Crypto: Redefining the Future of Finance

Click here to register for the webinarGold is making a powerful comeback as a cornerstone of the global financial system—but it’s not alone. Digital assets and cryptocurrencies are rapidly transforming how capital moves across markets. Instead of competing, gold and crypto are increasingly... Keep Reading...
Lahontan Gold (TSXV:LG)

Lahontan Closes Strategic York Claims Purchase at Santa Fe

Lahontan Gold Corp. (TSXV:LG)(OTCQB:LGCXF)(FSE:Y2F) (the "Company" or "Lahontan") is pleased to announce that the Company has completed the Purchase (the "Purchase") of 27 unpatented lode mining claims (the "York claims") from Emergent Metals Corp ("Emergent"). The York claims are contiguous... Keep Reading...
Finger flipping block from "RESTART" to "START" on orange background.

Barrick’s Mali Gold Mine Restarts Under State Control

Barrick Mining's (TSX:ABX,NYSE:B) Loulo-Gounkoto mine in Mali has resumed operations for the first time in over nine months, following a court-ordered takeover by the West African nation’s military-led government, according to a Bloomberg report.The Loulo-Gounkoto complex had been shuttered... Keep Reading...
Blackrock Silver Commences Phase 2 Hydrology Program, Geotechnical Evaluation and Seismic Survey on the Tonopah West Project

Blackrock Silver Commences Phase 2 Hydrology Program, Geotechnical Evaluation and Seismic Survey on the Tonopah West Project

These Programs Support the Advancement of Tonopah West Towards the Permitting of an Exploration Decline to Enable Test Mining and the Extraction of a Bulk SampleHIGHLIGHTS:The Phase 2 hydrology program will consist of placing 5 additional piezometers, a dewatering well and a groundwater... Keep Reading...
Augustus Minerals

High stakes and blue sky as Augustus lines up for PNG golden prize

There’s a big play happening up in PNG with a potentially huge prize and the $9m ASX listed Augustus Minerals is in the thick of it. After years of dispute, court cases and controversy, the gold-rich Mt Kare project, that sits about 600kms north-west of Port Moresby, is about to be awarded to... Keep Reading...

Latest Press Releases

Related News