Altiplano Confirms Continuity in Farellon Vein System at Depth with Ongoing Exploration Drill Program

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to announce that 8 drill holes from Phase 1 of its ongoing 6,200 m underground exploration drilling program have been completed at the Farellon copper-gold (Cu-Au) mine located near La Serena, Chile.

Highlights

  • Eight underground drill holes from Drill Pad 1 (Figure 1) have been completed for a total of 1,857 metres.
  • Continuity of the Farellon Vein System at depth has been confirmed with all holes intersecting the Farellon Vein System up to 28 metres below the current 360 m development level (198 m below surface).
  • Drilling has confirmed the strike extent of the vein system over 230 metres where mineralized sections vary in (true) width from 2.5 m to 5 m and averaging 3.68 m.
  • Logging of the drill core has confirmed the presence of copper sulphide and magnetite mineralization typical of the upper parts of the working developments.
  • The drill has been moved to the second location at Drill Pad 2 (on surface) to begin the next planned series of holes.

CEO Alastair McIntyre comments, "We are pleased with the initial results from the first eight holes in the ongoing drill program. Visual inspection of the core has confirmed copper sulphide and magnetite mineralization in the Farellon vein at depth and we look forward to the completion of the program and releasing assay results in the coming weeks."

The intent of the 6,200 m drilling program is to further delineate the iron oxide copper gold vein system at depth and to outline additional tonnage available to support the planned 5,000 tonnes/month extraction rate at Farellon. In addition, the drilling is expected to aid in grade control and optimize development.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4303/99377_c8324de304431872_001.jpg

Figure 1: Plan map of Farellon underground development and drill plan

To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/4303/99377_c8324de304431872_001full.jpg

Altiplano has generated over US$6,600,000 from the recovery and sale of approximately 3.375 million pounds of copper with an average grade of 1.77% Cu (2018 Q1-2021 Q2). Cash flow has been re-invested into equipment, underground drilling, expanding underground development, enhancing ventilation to increase productivity and capacity, and the commencement of the permitted El Peñón fit-for-purpose mill and flotation plant located 15 km from the Farellon site.

About Altiplano

Altiplano Metals is a growing gold, silver, and copper company focused on the Americas. The Company has a diversified portfolio of assets that include an operating copper/gold/iron mine, development near term producing gold/copper projects, and exploration land packages with district-scale potential. Altiplano is focused on creating long-term stakeholder value through developing safe and sustainable production, reinvesting into exploration, and pursuing acquisition opportunities to complement its existing portfolio. Management has a substantial record of success in capitalizing on opportunity, overcoming challenges and building shareholder value. Altiplano trades on the Toronto Venture Exchange trading under the symbol APN and the Frankfurt Exchange under the symbol A2JNFG.

John Williamson, B.Sc., P.Geol., a Qualified Person as defined by NI 43-101, has reviewed, and approved the technical contents of this document.

Altiplano is part of the Metals Group of companies, managed by an award-winning team of professionals who stand for technical excellence, painstaking project selection and uncompromising corporate governance, with a proven ability to capitalize on investment opportunities and deliver shareholder returns.

ON BEHALF OF THE BOARD 

/s/ "John Williamson"
Chairman

For further information, please contact:
Alastair McIntyre, President and CEO

alastairm@apnmetals.com
Tel: (416) 434-3799

For further information, please contact:
Jeremy Yaseniuk, Director

jeremyy@apnmetals.com
Tel: (604) 773-1467

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the (TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. A qualified person has not done sufficient work to classify any historical estimates as current mineral resources or mineral reserves and the issuer is not treating the historical estimates as current mineral resources or mineral reserves. The Farellon mine was previously in production dating back to the 1970's with a reported historical production (to a depth of 70 m) yielding approximately 300,000 tonnes at an average grade of 2.5% copper and 0.5g/t gold. This material was processed locally and sold to ENAMI. Altiplano is relying upon past production records, underground sampling and related activities and current diamond drilling to estimate grade and widths of the mineralization to reactivate production. The decision to commence production on the Farellon deposit is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty and economic and technical risks of failure associated with any production decision. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continuity of mineralization, uncertainties related to the ability to obtain necessary permits, licenses and title and delays due to third party opposition, changes in government policies regarding mining and natural resource exploration and exploitation, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, investors should review the Company's continuous disclosure filings that are available at www.sedar.com.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/99377

News Provided by Newsfile via QuoteMedia

The Conversation (0)
Canoe on the shore of Boundary Lake, Minnesota, with "Weekly Editor's Picks" text overlay.

Editor's Picks: Trump to Lift Minnesota Mining Ban, Dundee Buys Adriatic, China Tightens Rare Earth Grip

Here's a quick recap of some of the most impactful resource sector news items for the week.

The period saw the Trump administration move to reverse a Biden-era ban on copper and nickel mining near Minnesota’s Boundary Waters, while Dundee Precious Metals (TSX:DPM,OTC Pink:DPMLF) penned a deal for assets in Bosnia and Herzegovina and Serbia, and China exerted control over rare earth mines in Myanmar.

Keep reading...Show less
Juggernaut Exploration (TSXV:JUGR)

Juggernaut Files for Approval of Private Placement Financing

Juggernaut Exploration Ltd. (TSX-V: JUGR) (OTCQB: JUGRF) (FSE: 4JE) (the “Company” or “Juggernaut the Company is pleased to announce that it has filed documents with theTSX Venture Exchange (the “Exchange”) seeking conditional approval of its $0.64 unit (“Unit”) private placement financing (the “Financing”) for aggregate gross proceeds of $1.1 million.

The Financing consists of 1,718,731 Units, each Unit consisting of 1 common share of the Company and 1 common share purchase warrant, each warrant being exercisable at $0.84 for 5 years, subject to the right of the Company to accelerate the exercise period to 30 days if, after the 4-month hold has expired, shares of the Company close at or above $1.50 for 10 consecutive trading days. Proceeds of the Financing will be used for general corporate and operating purposes.

Keep reading...Show less
Empire Metals

Empire Metals Limited Announces Warrant Exercise

Empire Metals Limited ("Empire" or "the Company") (LON:EEE)(OTCQB:EPMLF), the AIM-quoted resource exploration and development company, announces that it has received notification from SP Angel Corporate Finance LLP, Nominated Adviser and Broker to the Company, of the exercise of a warrant over 70,000 new ordinary shares of no par value in the share capital of the Company (the 'New Ordinary Shares') at a price of £0.06 per share. Accordingly, the Company has today issued the New Ordinary Shares to the warrant holder for an aggregate cash value of £4,200. The Company has also received notification from Shard Capital Stockbrokers, Broker to the Company, of the exercise of a warrant over 689,988 new ordinary shares of no-par value in the share capital of the Company (the 'New Ordinary Shares') at a price of £0.105 per share. Accordingly, the Company has today issued the New Ordinary Shares to the warrant holder for an aggregate cash value of £72,448.74.

Keep reading...Show less
Aston Bay (TSXV:BAY)

Aston Bay and American West Metals Announce Drilling Preparations Underway at the Storm Project, Nunavut, Canada

Camp opening and logistics have commenced with geophysics and drilling to follow in the coming weeks

Aston Bay Holdings Ltd. (TSXV:BAY)(OTCQB:ATBHF) ("Aston Bay" or the "Company") is pleased to announce the commencement of activities at the Storm Copper Project ("Storm" or the "Project") on Somerset Island, Nunavut. American West Metals Limited ("American West"), the Project operator, is conducting the exploration program. Aston Bay and American West have formed a 20/80 unincorporated joint venture with respect to the Storm Project property, with Aston Bay maintaining a free carried interest until a decision to mine is made upon completion of a bankable feasibility study.

Keep reading...Show less
Osisko Metals (TSXV:OM)

Osisko Metals Intersects 0.33% Cu Over 258 Metres at Gaspé

Includes 15.6 Metres Averaging 1.47% Cu and 8.5 g/t Ag

E Zone Skarn Returns 29.7 Metres Averaging 1.92% Cu and 15.2 g/t Ag

Keep reading...Show less
Small sack full of Australian money.

FireFly Metals to Add AU$95 Million to Coffers With Equity Raising

FireFly Metals (ASX:FFM,TSX:FFM,OTC Pink:MNXMF) has attained firm commitments to raise up to about AU$95 million, giving it a total of AU$135 million for its multi-pronged growth strategy.

The company highlighted on Tuesday (June 10) that the equity financing will be completed via the issuance of approximately 94.7 million fully paid ordinary shares; it will receive around AU$1 per new share.

The funds will be raised via three transactions, with the first being an AU$11.2 million charity flow-through placement to Canadian investors. This will be followed by a AU$54.9 million two-tranche institutional placement, as well as a AU$28.8 million fully underwritten Canadian bought-deal offering with BMO Capital Markets.

Keep reading...Show less

Latest Press Releases

Related News

×