Global Atomic Corporation ("Global Atomic" or the "Company"), (TSX: GLO)  (OTCQX: GLATF) (Frankfurt: G12) is pleased to announce the Company's fourth update on the completed 16,000-meter drill program at the Dasa Project in the Republic of Niger including an interim result of chemical assays completed to date.

HIGHLIGHTS
  • Hole ASDH 609 returned 43.6m @ 30,581 ppm eU3O8 from 549.2m
    • Incl. 3.40m @ 74,854 ppm eU3O8 (7.48% eU3O8) from 550.3m and 0.70m @ 136,307 ppm eU3O8 (13.63% eU3O8) from 551.3m
    • Incl. 4.48m @ 63,790 ppm eU3O8 (6.38% eU3O8) from 559.9m
    • Incl. 11m @ 58,879 ppm eU3O8 (5.89% eU3O8) from 578.2m and 1.5m @ 110,563 ppm eU3O8 (11.48% eU3O8) from 586.3m
  • Assay results are returning U3O8 grades averaging 10% above the initial published probe intersects

Global Atomic President and CEO, Stephen G. Roman stated, "Our recent drill program was very successful and will add to the Dasa Project mineral resource as well as result in a significant conversion of Inferred resources to the Measured and Indicated categories."

"The probe results were excellent, and it is noteworthy that assay results show even higher grades. Once all the assays are complete, a revised Mineral Resource Estimate will be calculated in Q1 2023 and Dasa's revised mine plan will follow. The exploration team under the guidance of Mr. Christophe Din, the Company's Exploration Manager in Niger, is to be congratulated for their strategic planning and completion of this very successful infill and exploration drill program."

"Underground development is progressing at Dasa since the initial portal blast on November 5 th . Project financing discussions are progressing to fund the construction of the mill. The camp has been significantly modernized and expanded to accommodate 150 mining crew and support staff, comprised of experienced Nigerien miners from the recently closed COMINAK operation and young local, unskilled labourers who will benefit from our training and apprenticeship programs. We remain on schedule to produce yellowcake for delivery to utilities in early 2025."

The additional 1,000 meters of drilling extended westward by 150 meters (see Figure 1) the high- grade envelope from hole ASDH608 announced in the third update of the 15,000-meter drill program ( August 31 st , 2022 release ).

Figure 1 (CNW Group/Global Atomic Corporation)

Figure 1.

The drilling confirmed the continuity of the graben mineralization and the connectivity of Zone 4 and Zone 5 to the northern down dip of Zone 3. Hole ASDH611, was drilled on an azimuth of north 330 degrees to crosscut the mineralized body. Other holes in this trend were drilled vertically to fully define the sedimentary package and determine the stratigraphy of the mineralization. The next drill program will be designed to determine the northern extension of this high-grade mineralization and to convert the resource categories in this area from Inferred to Measured and Indicated.

The significant intersections of the last three holes of the program are outlined in Table 1.

Hole ID

Zone

From (meters)

To (meters)

nterval (meters

eU3O8 (ppm)

eU3O8 (%)

ASDH609

1

481.9

513.7

31.8

587

0.06


Incl.

506.9

509.6

2.7

2,029

0.20


2

537.4

539.6

2.2

333

0.03


3

549.2

592.8

43.6

30,581

3.06


Incl.

550.3

553.7

3.4

74,854

7.49


Incl.

551.3

552.0

0.7

136,307

13.63


Incl.

559.9

564.3

4.4

63,790

6.38


Incl.

563.0

563.6

0.6

117,423

11.74


Incl.

578.2

589.2

11.0

58,879

5.89


Incl.

586.3

587.8

1.5

110,563

11.06


Incl.

586.4

587.6

1.2

114,835

11.48

ASDH610

1

462.1

491.8

29.7

1,384

0.14


Incl

484.3

485.4

1.1

7,319

0.73


Incl

489.1

490.9

1.8

5,159

0.52


2

509.0

521.7

12.7

2,809

0.28


Incl

515.6

520.8

5.2

5,161

0.52


3

540.2

560.2

20.0

1,412

0.14


Incl

540.7

541.8

1.1

10,467

1.05


Incl

557.2

559.6

2.4

2,883

0.29


4

568.8

604.3

35.5

1,233

0.12


Incl

569.7

577.2

7.5

2,911

0.29


Incl

585.4

587.3

1.9

2,541

0.25


Incl

588.9

591.5

2.6

3,355

0.34


5

612.1

633.4

21.3

2,068

0.21


Incl

613.2

615.0

1.8

2,636

0.26


Incl

627.5

632.5

5.0

5,042

0.50

ASDH611

3

598.2

631.3

33.1

1,003

0.10


Incl.

618.7

620.7

2.0

4,193

0.42


4

635.9

641.6

5.7

2,250

0.22


Incl.

638.4

638.9

0.5

12,847

1.28

Table 2.

Note: As announced in the August 31, 2022, news release, the U 3 O 8 equivalent values were derived using a Gamma
Probe. As common practice, the drill cores are being assayed to accurately derive the contained eU
3 O 8 .

The drilling campaign generated a total of 5,312 mineralized core samples, including approximately 10% relating to control samples such as standards, duplicates, and blanks using certified reference material. This is standard practice in the industry.

The samples are mechanically prepared in an accredited laboratory in Niger and assaying is done on pulps at ALS Labs in North Vancouver , Canada. Approximately 58% of the samples have been assayed to date by ALS Vancouver and results are above expectation: the assays are returning values averaging 10% above the probe equivalent U3O8 (Figure 2).

Figure 2 - ASDH599 (CNW Group/Global Atomic Corporation)

Figure 2. ASDH599: U 3 O 8 assay results for this hole are as high as 25% greater than eU 3 O 8 probe results. eU 3 O 8 are equivalent U 3 O 8 as measured by Gamma probe results.

Based on this positive correlation, an increase in the equivalent U3O8 is expected to be derived from the Gamma Probe prior to the calculation of an updated Mineral Resource Estimate ("MRE").

The remaining core samples are being assayed with final results expected by end of 2022. The resource update will be reflected in a new MRE and the Company will subsequently revise the Phase 1 Mine Plan.

QP Statement

This news release has been reviewed and approved by Mr. A. Christophe Din , MSc, MAusIMM, Exploration Manager at Global Atomic's subsidiary, SOMIDA, in the Republic of Niger , who is a "qualified person" under National Instrument 43-101 – Standards of Disclosure for Mineral Properties. Mr. Din holds a Diplôme de Formation Spécialisée from École Nationale Supérieure des Mines de Paris and is a member of the Australian Institute of Geoscientists.

About Global Atomic

Global Atomic Corporation ( www.globalatomiccorp.com ) is a publicly listed company that provides a unique combination of high-grade uranium mine development and cash-flowing zinc concentrate production.

The Company's Uranium Division includes four deposits with the flagship project being the large, high-grade Dasa Project, discovered in 2010 by Global Atomic geologists through grassroots field exploration. With the issuance of the Dasa Mining Permit and an Environmental Compliance

Certificate by the Republic of Niger , the Dasa Project is fully permitted for commercial production. The Phase 1 Feasibility Study for Dasa was filed in December 2021 and estimates yellowcake delivery to utilities to commence in 2025. Mine excavation began in Q1 2022.

Global Atomic's Base Metals Division holds a 49% interest in the Befesa Silvermet Turkey, S.L. (BST) Joint Venture, which operates a modern zinc production plant, located in Iskenderun, Turkey. The plant recovers zinc from Electric Arc Furnace Dust (EAFD) to produce a high-grade zinc oxide concentrate which is sold to zinc smelters around the world. The Company's joint venture partner, Befesa Zinc S.A.U. (Befesa) holds a 51% interest in and is the operator of the BST Joint Venture. Befesa is a market leader in EAFD recycling, with approximately 50% of the European EAFD market and facilities located throughout Europe , Asia and the United States of America .

The information in this release may contain forward-looking information under applicable securities laws. Forward-looking information includes, but is not limited to, statements with respect to completion of any financings; Global Atomics' development potential and timetable of its operations, development and exploration assets; Global Atomics' ability to raise additional funds necessary; the future price of uranium; the estimation of mineral reserves and resources; conclusions of economic evaluation; the realization of mineral reserve estimates; the timing and amount of estimated future production, development and exploration; cost of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental and permitting risks. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "is expected", "estimates", variations of such words and phrases or statements that certain actions, events or results "could", "would", "might", "will be taken", "will begin", "will include", "are expected", "occur" or "be achieved". All information contained in this news release, other than statements of current or historical fact, is forward-looking information. Statements of forward-looking information are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Global Atomic to be materially different from those expressed or implied by such forward-looking statements, including but not limited to those risks described in the annual information form of Global Atomic and in its public documents filed on SEDAR from time to time.

Forward-looking statements are based on the opinions and estimates of management at the date such statements are made. Although management of Global Atomic has attempted to identify important factors that could cause actual results to be materially different from those forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance upon forward-looking statements. Global Atomic does not undertake to update any forward-looking statements, except in accordance with applicable securities law. Readers should also review the risks and uncertainties sections of Global Atomics' annual and interim MD&As.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy and accuracy of this news release.

Global Atomic Corporation (CNW Group/Global Atomic Corporation)

SOURCE Global Atomic Corporation

Cision View original content to download multimedia: https://www.newswire.ca/en/releases/archive/November2022/28/c4558.html

News Provided by Canada Newswire via QuoteMedia

GLO:CA,GLATF
The Conversation (0)
GLOBAL ATOMIC PROVIDES DASA PROJECT UPDATE

GLOBAL ATOMIC PROVIDES DASA PROJECT UPDATE

Global Atomic Corporation ("Global Atomic" or the "Company"), (TSX: GLO) (FRANKFURT: G12) (OTCQX: GLATF) is pleased to report on the continuing development of its Dasa Uranium Project in the Republic of Niger .

Stephen G. Roman , President & CEO, stated, " The primary question investors ask is regarding the timing of a term sheet for our banking syndicate's Dasa Project loan facility. While this has been a much longer process than expected, the financing terms are in the final stage of completion, which, upon agreement, will then go to the banks' Boards for approval prior to announcement to our shareholders."

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Global Atomic Announces Q1 2023 Results

Global Atomic Announces Q1 2023 Results

Dasa Uranium Project On Schedule to Produce Yellowcake in Q1 2025

Global Atomic Corporation ("Global Atomic" or the "Company"), (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) announced today its operating and financial results for the quarter ended March 31, 2023 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Global Atomic Completes a Second Definitive Agreement to Supply Uranium to a Major North American Utility

Global Atomic Completes a Second Definitive Agreement to Supply Uranium to a Major North American Utility

Global Atomic Corporation ("Global Atomic" or the "Company"), (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) announced today that the Company has formalized its June 2022 Letter of Intent by signing a Definitive Agreement with a major North American utility for their procurement of uranium from the Dasa Project. The agreement represents the supply of up to 2.1 million pounds U 3 O 8 within a multi-year delivery window beginning in 2025, representing about 7% of Dasa's annual production over the period with a revenue potential valued in excess of US$110 million in real terms.

In January 2023 , the Company formalized a similar agreement with another major North American utility for the procurement of Dasa's uranium, representing the supply of 2.4 million pounds U 3 O 8 over a six-year period commencing in 2025, representing a revenue potential of US$140 million in real terms.  In total these two agreements represent revenue potential of over US$250 million .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Global Atomic Announces 2022 Results

Global Atomic Announces 2022 Results

Dasa Uranium Project On Schedule to Produce Yellowcake in Q1 2025

Global Atomic Corporation ("Global Atomic" or the "Company"), (TSX: GLO) (OTCQX: GLATF) (FRANKFURT: G12) announced today its operating and financial results for the year ended December 31, 2022 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Global Atomic Update and Outlook for 2023

Global Atomic Update and Outlook for 2023

Global Atomic Corporation ("Global Atomic" or the "Company"), (TSX: GLO) (OTC-QX: GLATF) (Frankfurt: G12) is pleased to report on operations at its Turkish zinc recycling joint venture and its Dasa Uranium Project in the Republic of Niger .

Turkish Zinc Recycling Joint Venture

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Ur-Energy Provides 2024 Q1 Operations and 2024 Production Guidance Updates

Ur-Energy Inc. (NYSE American:URG)(TSX:URE) ("Ur-Energy" or the "Company") provides the following updates on 2024 Q1 operations, adjustment to our production guidance for the year, and the early repayment of our State Bond Loan

John Cash, Ur-Energy Chairman and CEO, said of 2024 Q1, "This year has started with a great number of advances in the growth of Ur-Energy, demonstrating a focus on our future in a strengthening market for nuclear energy including our own uranium production at the front-end of the fuel cycle. We were pleased to announce our decision to build our second ISR uranium facility at Shirley Basin, the birthplace of ISR uranium in the 1960s, and related activities have commenced. We anticipate production at Shirley Basin to begin in 2026.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Tower of shipping drums with Australian flags on each.

Boss' Honeymoon Restart a Success, First Drum of Uranium Produced

Boss Energy (ASX:BOE,OTCQX:BQSSF) announced on Monday (April 22) that it has produced the first drum of uranium as part of the commissioning process at its Honeymoon project in South Australia.

“Processing the first drum of uranium is a major milestone,” said Managing Director Duncan Craib. “As well as marking the start of production and cashflow, it shows conclusively that our mining and processing strategy is highly effective.”

Boss said it's now looking to accelerate its plan to expand production and extend Honeymoon's life. According to the company, the current mine plan only uses 36 million pounds of the asset's total JORC resource of 71.6 million pounds.

Keep reading...Show less
  Boss Energy

Boss Produces First Drum of Uranium

Major milestone paves way for strong growth in production, cashflow and financial returns as Boss increases production rate by leveraging the infrastructure and extensive JORC Resource

Boss Energy Limited (Boss or the Company) is pleased to announce that it has produced the first drum of uranium at its 100 per cent-owned Honeymoon Uranium Project in South Australia.

Keep reading...Show less
Forum Energy Metals

Forum Energy Metals


Keep reading...Show less
ASX symbol with uranium ore.

Top 5 ASX Uranium Stocks of 2024

Uranium has broken out, with the spot price rising to a 16-year high of US$106 per pound in early 2024. Despite a pullback, uranium prices in April still remain 30 percent higher than last year's average.

Although the market's turnaround has taken time, experts are predicting a bright future as countries around the world pursue clean energy goals. Against that backdrop, some ASX-listed uranium companies have been making moves in 2024.

Below the Investing News Network has listed the top uranium stocks on the ASX by year-to-date gains. Data was gathered using TradingView's stock screener on April 10, 2024, and all companies included had market caps above AU$50 million at the time. Read on to learn more about these firms and what they've been up to so far this year.

Keep reading...Show less
Nuclear power plants.

Top 10 Uranium-producing Countries (Updated 2024)

Output from the top uranium-producing countries rose steadily for a decade, peaking at 63,207 metric tons (MT) in 2016. However, global uranium production has noticeably declined in the years since then.

Decreased numbers across the world are related to the persistently low spot prices the uranium market has experienced in the wake of the Fukushima disaster; COVID-19 and Russia's war against Ukraine have also had an impact on output.

Now uranium prices have begun to rebound significantly, buoyed by increasingly positive sentiment about the role of nuclear power in the energy transition, and investment demand via new uranium-based funds.

Keep reading...Show less