Augustus Minerals

Further High-Grade Gold to 50g/t Au at Music Well

Augustus Minerals (ASX: AUG; Augustus or the Company) is pleased to announce the results of rock chips collected during a field trip to the Clifton East prospect within the Companies Music Well project.


Assays have been received from rock chips collected in December 2024 at the Clifton East Prospect.

  • 21 rock chips were collected at Clifton East, assays include:
    • 50.3g/t Au, 45g/t Ag (ARK000064),
    • 9.73g/t Au, 1g/t Ag (ARK000066),
    • 8.95g/t Au, 0.12g/t Ag (ARK000076),
    • 4.57g/t Au, 3g/t Ag (ARK000074),
    • 1.67g/t Au, 0.1g/t Ag (ARK000123).
  • The new rock chips support the previous rock chips which included1:
    • 20.1g/t Au (110657),
    • 7.86g/t Au (110658),
    • 7.86g/t Au (FSMWR085),
    • 1.71g/t Au (FSMWR139).
  • The rock chips have defined a 500m long east-northeast trend of gold anomalism that is coincident with a linear zone of demagnetization within the host granitoids.
  • Several rock chips were collected during the field trip from other areas with a high of 3.59g/t Au (ARK000108) from the Bulls Head target.
  • Next Steps at Clifton East:
    • Geological mapping and sampling have re-commenced, and AC/RC drilling is being planned.
    • An artificial intelligence/machine learning (AI) enhanced targeting study is in progress. Results of this study are expected in Q1 2025.

Andrew Ford, GM Exploration

“The new rock chips from the Clifton East prospect, combined with the recent assays from St Patrick’s Well and other regional targets continue to illustrate the potential of this under- explored portion of the Leonora-Laverton District. The Augustus geology team returned to site on the 20th of January to continue the mapping and sampling program.”

Figure 1: Regional Tenement Packages and Gold Projects

Background

Augustus Minerals Limited (ASX: AUG) holds the exploration licenses and applications comprising the Music Well Gold Project (“Project”) located 35km north of Leonora in the Leonora/Laverton Greenstone Belt of Western Australia.

Comprising ten granted exploration licences covering an area of 1,345km2, making the Project one of the largest exploration packages in the region (Figures 1 and 2).


Click here for the full ASX Release

This article includes content from Augustus Minerals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

AUG:AU
Augustus Minerals

Augustus Minerals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Augustus Minerals

Augustus Minerals


Keep reading...Show less

Vast Land Package for Critical and Precious Metals Exploration in Australia

John Kaiser, mine site.

John Kaiser: Gold Price Outlook and Drivers, Plus 7 Stocks I'm Watching

John Kaiser of Kaiser Research shares his outlook for the gold price, also mentioning several junior mining stocks that he's watching right now.

"I think we're in a very special moment," he said.

Keep reading...Show less
Element79 Gold CEO and Director James C. Tworek.

Element79 Gold CEO Highlights Strategic Pivot Toward Nevada Projects

Element79 Gold (CSE:ELEM,OTCQB:ELMGF,FWB:7YS) is providing more details on recent developments at its Lucero project in Peru, after the company invoked the force majeure clause under its agreement with Condor Resources (TSXV:CN).

“When you're working outside of … a de-risked jurisdiction like North America, you can run into these delays. And while we have been working diligently with the community for over two and a half years since acquiring this project at Lucero, there's ebbs and flows, both on a federal level as well as at local level, inside the community,” said James C. Tworek, the company’s CEO and director.

Invoking the force majeure clause allowed Element79 to pause payment obligations with regards to the Lucero project for a maximum of two years.

Keep reading...Show less
Two people in suits shaking hands in a warmly lit setting.

Alkane Completes Merger with Mandalay Resources, Begins Trading on TSX

Alkane Resources (ASX:ALK,TSX:ALK) said on August 5 that it has closed its merger with gold- and antimony-focused Mandalay Resources. The all-share transaction was valued at AU$559.1 million.

First announced in April, the deal creates a combined company that is projected to produce about 160,000 gold equivalent ounces in the 2025 fiscal year, with the potential to rise to 180,000 ounces the following year.

Alkane has acquired all of Mandalay's issued and outstanding common shares, with former Mandalay shareholders and existing Alkane shareholders respectively owning approximately 55 percent and 45 percent of the new entity.

Keep reading...Show less
Underground Production Commences Reward Gold Mine Project

Underground Production Commences Reward Gold Mine Project

Vertex Minerals (VTX:AU) has announced Underground Production Commences Reward Gold Mine Project

Download the PDF here.

Augustus Minerals

Augustus Minerals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×