Cliffmont Intersects 15.35 g/t Siver over 2.40 metres at San Luis Project

Silver Investing

Cliffmont Resources Ltd. (TSXV:CMO) announced drill results from the 2012 Phase I drill program from their San Luis Project in Colombia.

Cliffmont Resources Ltd. (TSXV:CMO) announced drill results from the 2012 Phase I drill program from their San Luis Project in Colombia.

As quoted in the press release:

Drill hole SLD-19 intersected the mineralization at a depth of approximately 80 metres and approximately 50m north of SLD-01: •39.24  g/t gold & 15.35 g/t silver over 2.40 metres including 0.40 metres averaging 235 g/t gold and 90.70 g/t silver

The intersection, which is open, confirms the continuity of mineralization below the mine and to the north.

Cliffmont`s President and CEO, Jeff Tindale, said:

We are very pleased with the drill results from San Jorge and El Callao as they confirm the mineralization continues at depth and also confirm that the areas of high grade mineralization seen in historical underground sampling can potentially be mined in the future.

To view the whole press release, click here.

The Conversation (0)
×