Cartier Metallurgical Testwork Program is Underway at Cadillac

Cartier Metallurgical Testwork Program is Underway at Cadillac

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce that metallurgical testwork program is underway on samples of the Main Sector from its Cadillac Project, located in Val-d'Or (Abitibi, Quebec). This work will be supervised by Soutex, a firm specializing in mineral processing and metallurgy, located in Quebec City (Quebec).

Methodology of the Metallurgical Testwork Program

A total of 388.7 kg of representative NZ-size half-drill core samples, which 92% of the samples come from holes drilled by Cartier between 2017 and 2023, has been collected from three gold deposits (Chimo, East Chimo and West Nordeau) of the Main Sector (Figure 1) and shipped to ALS Canada Ltd – Metallurgy Services in Kamloops, British Columbia; the details and process of which are provided below:

  • Chimo Deposit: 126.1 kg (composites 1 & 2).
  • East Chimo Deposit: 132.6 kg (composites 3 & 4).
  • West Nordeau Deposit: 130.0 kg (composites 5 & 6).

Figure 1 : Geographic Location of the Composites

Geographic Location of the Composites

The preparation and testing process of the composites of the three deposits will be subject to cyanidation tests at three different grind sizes. After these tests, gravimetric concentration separation followed by a cyanide destruction tests of the gravity tails will be done at the grind size showing the best results. In addition to the metallurgical program, comminution test, as well as chemical and mineralogical characterization, will also be performed to define the grindability of the mineralized material and predict his behaviour in the process (Figure 2).

Figure 2 : Material Preparation and Testing Flowchart of the Composites

Material Preparation and Testing Flowchart of the Composites

Key Objectives of the Program

  • Defining expected gold recovery rates and improving upon historical results from the Chimo deposit.
  • Establishing first-time metallurgical recovery data for the East Chimo and West Nordeau satellite deposits, where no previous data exists.
  • Supporting the development of an integrated process flowsheet .
  • Providing critical data for future trade-off studies to guide project development.

Results from the metallurgical testwork program are expected in Q1 2026 (Figure 3).

Figure 3 : Planned Test Schedule

Planned Test Schedule

Milestones of 2025-2027 Exploration Program

100,000 m Drilling Program (Q3 2025 to Q2 2027)

The ambitious 600-hole drilling program will both expand known gold zones and test new shallow surface high-potential targets. The objective is to unlock the camp-scale, high-grade gold potential along the 15 km Cadillac Fault Zone. It is important to note that Cartier's recent consolidation of this large land holding offers the unique opportunity in over 90 years for unrestricted exploration.

Environmental Baseline Studies & Economic Evaluation of Chimo mine tailings (Q3 2025 to Q3 2026)

The baseline studies will be divided into two distinct parts which include 1) environmental baseline desktop study and 2) preliminary environmental geochemical characterization. The initial baseline studies will provide a comprehensive understanding of the current environmental conditions and implement operations that minimize environmental impact while optimizing the economic potential of the project. These studies will be supplemented by an initial assessment of the economic potential of the past-producing Chimo mine tailings to determine whether a quantity of gold can be extracted economically.

Qualified Person

The scientific and technical content of this press release has been prepared, reviewed and approved by Mr. Ronan Déroff, P.Geo., M.Sc., Vice President Exploration, who is a ″Qualified Person″ as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (″NI 43-101″).

About Soutex

Soutex is a consulting firm in mineral processing and metallurgy that offers specialized services, from the initial stages of development on paper to the daily operations of the processing plant. Their designs stem from their solid experience in providing plant operations support. This support is based on their knowledge of fundamental ore processing principles and their in-plant experience. Founded in 2000 and having offices in Canada (Quebec and Longueuil) and Germany (Munich), Soutex comprises more than 40 metallurgists, process engineers, and technicians, making it one of the largest groupings of specialists in the field in Canada. Services have been offered to clients located across Canada and abroad (West Africa, United States, Finland, New Caledonia, Suriname, and Madagascar).

About Cadillac Project

The Cadillac Project, covering 14,000 hectares along a 15-kilometre stretch of the Cadillac Fault, is one of the largest consolidated land packages in the Val-d'Or mining camp. Cartier's flagship asset integrates the historic Chimo Mine and East Cadillac projects, creating a dominant position in a world class gold mining district. With excellent road access, year-round infrastructure and nearby milling capacity, the project is ideally positioned for rapid advancement and value creation.

Using a gold price of US$1,750/oz, a Preliminary Economic Assessment demonstrated the economic viability of a 2-km segment, compared to the 15 km that will be the subject of the 100,000 m drilling program, with an average annual gold production of 116,900 oz over a 9.7-year mine life. Indicated resources are estimated at 720,000 ounces (7.1 million tonnes at 3.1 g/t Au) and inferred resources at 1,633,000 ounces (18.5 million tonnes at 2.8 g/t Au). Please see the NI 43-101 ″Technical Report and Preliminary Economic Assessment for Chimo Mine and West Nordeau Gold Deposits, Chimo Mine and East Cadillac Properties, Quebec, Canada, Marc R. Beauvais, P.Eng., of InnovExplo Inc., Mr. Florent Baril of Bumigeme and Mr. Eric Sellars, P.Eng. of Responsible Mining Solutions″ effective May 29, 2023.

About Cartier Resources Inc.

Cartier Resources Inc., founded in 2006 and headquartered in Val-d'Or (Quebec) is a gold exploration company focused on building shareholder value through discovery and development in one of Canada's most prolific mining camps. The Company combines strong technical expertise, a track record of successful exploration, and a fully funded program to advance its flagship Cadillac Project. Cartier's strategy is clear: unlock the full potential of one of the largest undeveloped gold landholdings in Quebec.

For further information, contact:
Philippe Cloutier, P. Geo.
President and CEO
Telephone: 819-856-0512
philippe.cloutier@ressourcescartier.com
www.ressourcescartier.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/1858495b-72ed-4b77-a5bf-e47428aed8da

https://www.globenewswire.com/NewsRoom/AttachmentNg/a9b5fdb0-cf7f-4d4e-8362-bb70e1e27572

https://www.globenewswire.com/NewsRoom/AttachmentNg/ae6cbada-64f4-4610-ad98-fa90ea5bb903


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

ECR:CC
Cartier Resources

Cartier Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Cartier Resources

Cartier Resources

Advancing Cadillac Project: An emerging gold camp east of Val-d’Or in the prolific Abitibi Greenstone Belt

Advancing Cadillac Project: An emerging gold camp east of Val-d’Or in the prolific Abitibi Greenstone Belt Keep Reading...
Cartier Reports Significant Gold Resource Growth At Cadillac With 9,953,000 tonnes at a grade of 2.40g/t Au for 767,800 Ounces Measured and Indicated, a 7% Increase and 35,185,000 tonnes at a grade of 2.14g/t Au for 2,416,900 Ounces Inferred, a 48% Increase

Cartier Reports Significant Gold Resource Growth At Cadillac With 9,953,000 tonnes at a grade of 2.40g/t Au for 767,800 Ounces Measured and Indicated, a 7% Increase and 35,185,000 tonnes at a grade of 2.14g/t Au for 2,416,900 Ounces Inferred, a 48% Increase

Cartier Resources Inc. (″Cartier″ or the ″Company″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce the results of the Updated Mineral Resource Estimate ("MRE") on its 100% owned flagship Cadillac Project, located in Val-d'Or (Abitibi, Quebec). The updated estimates include approximately... Keep Reading...
Cartier Resources Grants Stock Options

Cartier Resources Grants Stock Options

Cartier Resources Inc. (TSX-V: ECR) (the " Company ") announces that the Board of Directors granted, on December 16, 2025, a total of 3,600,000 stock options to directors and officers and to one employee of the Company. Pursuant to the terms of the Company's stock option plan, each option... Keep Reading...
Cartier Cuts 16.2 g/t Au over 3.5 m included in 5.9 g/t Au over 11.0 m at Contact ; Extends Multiple High-Grade Gold Zones Near Surface

Cartier Cuts 16.2 g/t Au over 3.5 m included in 5.9 g/t Au over 11.0 m at Contact ; Extends Multiple High-Grade Gold Zones Near Surface

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce the fifth batch of results from the fully funded 100,000-m drilling program (2 drill rigs), for the Contact Sector and more precisely, the North Contact Zone (″ NCZ ″), on its... Keep Reading...
Cartier Cuts 111.5 g/t Au over 2.0 m at Contact ; Confirms Multiple High-Grade Gold Zones; Extends Drilling at Surface

Cartier Cuts 111.5 g/t Au over 2.0 m at Contact ; Confirms Multiple High-Grade Gold Zones; Extends Drilling at Surface

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce the fourth batch of results from the fully funded 100,000-m drilling program (2 drill rigs) for the Contact Sector and more precisely, the North Contact Zone (NCZ), on its 100%-owned... Keep Reading...
Cartier Cuts 11.0 g/t Au over 9.0 m including 30.2 g/t Au over 2.5 at Contact ; Continues to Expand High-Grade Gold North Contact Zone near Surface

Cartier Cuts 11.0 g/t Au over 9.0 m including 30.2 g/t Au over 2.5 at Contact ; Continues to Expand High-Grade Gold North Contact Zone near Surface

Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR,OTC:ECRFF; FSE: 6CA) is pleased to announce the third batch of results from the fully funded 100,000-m drilling program (2 drill rigs) for the Contact Sector and more precisely, the North Contact Zone (NCZ), on its 100%-owned... Keep Reading...
Golconda Gold Announces Appointment of New General Manager for the Summit Mine

Golconda Gold Announces Appointment of New General Manager for the Summit Mine

Golconda Gold Ltd. ("Golconda Gold" or the "Company") (TSX-V: GG; OTCQB: GGGOF) is pleased to announce that Alan Linden has been appointed as the General Manager of the Corporation's Summit mine, located in New Mexico, United States. Alan Linden has over 35 years' experience as a Mining Engineer... Keep Reading...
Silverco Files Updated Mineral Resource Report on the Cusi Project

Silverco Files Updated Mineral Resource Report on the Cusi Project

Silverco Mining Ltd. (TSXV: SICO) ("Silverco" or the "Company") announces that the Company has filed an independent technical report entitled Mineral Resource Estimate for the Cusi Ag-Au-Pb-Zn Project, Chihuahua State, Mexico ("Technical Report") dated January 14, 2026 with an effective date of... Keep Reading...
Kobo Resources Advances Kossou Toward Resource Definition While Expanding Gold Mineralisation Beyond Known Structures

Kobo Resources Advances Kossou Toward Resource Definition While Expanding Gold Mineralisation Beyond Known Structures

Drilling confirms continued gold mineralisation within established Jagger and Road Cut Zone structures, including at depth with intersections of 8.0 m at 3.02 g/t Au at the Jagger Zone (KDD0129) and along the Contact Zone Fault with 6.0 m at 2.59 g/t Au at the Road Cut Zone (KDD0135) New... Keep Reading...
Quimbaya Gold Reports High-Grade Silver and Gold at Tahami South Segovia District

Quimbaya Gold Reports High-Grade Silver and Gold at Tahami South Segovia District

Assays return up to 9.8 g/t gold equivalent with high-grade silver (462.6-463.6m, 1.0m interval) of 17 oz/t in newly identified polymetallic vein systems Quimbaya Gold Inc. (CSE: QIM,OTC:QIMGF) (OTCQB: QIMGF) (FSE: K05) ("Quimbaya" or the "Company") reports assay results from its ongoing diamond... Keep Reading...
Mining Approvals Received for Lady Shenton Mine in Menzies

Mining Approvals Received for Lady Shenton Mine in Menzies

Brightstar Resources (BTR:AU) has announced Mining Approvals Received for Lady Shenton Mine in MenziesDownload the PDF here. Keep Reading...
Pinnacle Provides Progress Update for El Potrero Gold-Silver Project

Pinnacle Provides Progress Update for El Potrero Gold-Silver Project

(TheNewswire) VANCOUVER, BRITISH COLUMBIA, January 13, 2026 TheNewswire - (TSXV: PINN,OTC:PSGCF, OTC: PSGCF, Frankfurt: P9J) Pinnacle Silver and Gold Corp. ("Pinnacle" or the "Company") is pleased to provide an update on progress at the high-grade El Potrero gold-silver project in Durango,... Keep Reading...
Cartier Resources

Cartier Resources Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Interactive Chart

Latest Press Releases

Related News