World Copper Files Amended Resource Estimate and Technical Report for Updated Resource Estimate for the Zonia Project

World Copper Files Amended Resource Estimate and Technical Report for Updated Resource Estimate for the Zonia Project

 

Provides ATM Quarterly Report

 

This news release constitutes a "designated news release" for the purposes of the Company's prospectus supplement dated July 17, 2024 to its short form base shelf prospectus and amended and restated short form base shelf prospectus dated June 7, 2024

 

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE:7LY0) ("World Copper" or the "Company") announces an amended mineral resource estimate (the "Amended Resource Estimate") for the Zonia copper-oxide deposit in Arizona, USA ("Zonia" or the "Project"), and has filed an amended copy of its National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") technical report on SEDAR+. A calculation error in the block model used in the resource estimate necessitated a restating of the estimate.

 

The amended NI 43-101 technical report is entitled "Resource Estimate for The Zonia Project 2024 Update" (the "Technical Report") and is dated November 8, 2024 and dated effective August 27, 2024. The Technical Report was prepared pursuant to NI 43-101 by Sue Bird, P.Eng., of Moose Mountain Technical Services ("MMTS"), an independent qualified person as defined by NI 43-101 (the "QP"). The Technical Report is available on World Copper's SEDAR+ profile at www.sedarplus.ca and is available on World Copper's website at www.worldcopperltd.com.

 

Amended Resource Estimate for Zonia

 

The amended resource estimate contains Indicated Resources of 112.2 million short tons grading 0.297% total-copper (TCu) containing 668 million pounds of copper, and Inferred Resources of 62.9 million short tons grading 0.255 % total-copper containing 320 million pounds of copper. These numbers differ slightly from those in the October 25, 2024 news release https://worldcopperltd.com/2024/10/25/world-copper-files-technical-report-for-updated-resource-estimate-for-the-zonia-project/ , with nominal increases (3%) to tonnage and total contained copper, and a small decrease (0.5%) in grade for only the Indicated class.

 

The classified resources are outlined in detail in Table 1 at the base case cut-off grade of 0.18% and at a range of cut-off grades in Table 2. The Resource Estimate was completed for World Copper as part of the Company's overall exploration plan for Zonia (see news release dated May 22, 2022).

 

Table 1. Zonia Mineral Resource Estimate at the Base Case Cutoff Grade

 
                                   
Classification (Oxidation State)Copper Cut-off grade (%)Short Tons (Million)Grade (TCu%)Cu Lbs. (Million)
Indicated (Oxide)0.18101.20.300608
Indicated (Mixed)0.1811.00.27160
Total Indicated0.18112.20.297668
Inferred (Oxide)0.1846.40.257239
Inferred (Mixed)0.1816.50.24882
Total Inferred0.1862.90.255320
 

 

 

Notes to the Resource Estimate Tables:

 
  1. The effective date of the Resource Estimate is August 27, 2024.
  2.  
  3. Resources are reported using the 2014 CIM Definition Standards and were estimated using the 2019 CIM Best Practices Guidelines, as required by NI43-101
  4.  
  5.  The base case Mineral Resource has been confined by "reasonable prospects of eventual economic extraction" shape using the following assumptions:
    1. Metal price of US$4.00/lb of Cu
    2.  
    3. Metallurgical recovery of 75% in oxides and 70% in the transitional zone
    4.  
    5. Offsite costs of US$0.05/lb of Cu
    6.  
    7. Processing Costs of US$4/ton milled and General & Administrative (G&A) costs of US$ 2.00/ton milled
    8.  
    9. Mining cost of US$2.00/ton mined
    10.  
    11. 48-degree pit slopes
    12.  
    13. The 150% price case pit shell is used for the resource confining shape
    14.  
  6.  
  7. The resulting NSR = Cu*US$3.95/lb *0.75 for oxides and NSR = Cu*US$3.95/lb *0.70 in the transitional zone.
  8.  
  9. It is reasonably expected, though not guaranteed, that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration (see "Cautionary Note to United States Investors").
  10.  
  11. Numbers may not add due to rounding.
  12.  

Table 2. Zonia Mineral Resources Over a Range of Cut-off Grades

 
                                                          
 Cut-off
Grade TCu
(%) 
IndicatedInferred
Tonnage (ktons)Grade (TCu%)Cu Metal Content (Mlbs)Tonnage (ktons)Grade (TCu%)Cu Metal Content (Mlbs)
0.15 133,301 0.276 737 81,328 0.234 381
0.16 126,405 0.283 716 75,277 0.241 363
0.17 119,505 0.290 693 69,253 0.248 343
0.18 112,231 0.297 668 62,864 0.255 320
0.20 97,655 0.314 613 50,006 0.272 272
0.21 90,660 0.322 584 43,860 0.281 247
0.22 83,608 0.331 554 38,799 0.290 225
 

 
Mineral resources that are not mineral reserves do not have demonstrated economic viability; however, a reasonable prospect of eventual economic extraction pit has been used to confine the Resource Estimate using parameters detailed in the table notes. The QP for the Resource Estimate is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Resource Estimate. Factors that may affect the estimate include: metal price assumptions, changes in interpretations of mineralization geometry and continuity of mineralization zones, changes to kriging assumptions, metallurgical recovery assumptions, operating cost assumptions, confidence in the modifying factors, including assumptions that surface rights to allow mining infrastructure to be constructed will be forthcoming, delays or other issues in reaching agreements with local or regulatory authorities and stakeholders, and changes in land tenure requirements or in permitting requirement.

 

Zonia Resource Modeling

 

Data verification efforts for the Resource Estimate carried out by MMTS included discussions with World Copper personnel, personal inspection of the Project area with the collection and submission of check samples to an external laboratory, an audit of the exploration drillhole database, and a detailed review of additional information obtained from historical reports and information provided by the Company. MMTS also completed checks on the geologic information as compared to the paper logs, and checks of the assay values contained in the exploration database as compared to assay certificates provided by World Copper.

 

At-The-Market Quarterly Report

 

The Company also reports that, in accordance with the policies of the TSX Venture Exchange, and further to the at-the-market ("ATM") offering of shares made pursuant to the Prospectus Supplement dated July 17, 2024, World Copper issued 8,816,500 common shares and raised gross proceeds of $690,882 pursuant to ATM distributions during the period July 17, 2024 to September 30, 2024. Bank of Montreal ("BMO") received fees of $20,727 during the period.

 

QUALIFIED PERSONS

 

Sue Bird, P.Eng., of MMTS, an independent qualified person as defined by NI 43-101, has reviewed the scientific and technical information that forms the basis for this news release and has approved the disclosure herein.

 

ABOUT World Copper Ltd.

 

World Copper Ltd., headquartered in Vancouver, BC, is a Canadian resource company focused on the exploration and development of its copper porphyry projects: Zonia in Arizona and Escalones in Chile. Both projects have estimated resources with significant soluble copper mineralization, and they boast exciting potential to expand the resource base. The Company is dedicated to sustainable practices and leveraging technology to develop safe and productive mining operations in stable, mining-friendly jurisdictions.

 

Detailed information is available at World Copper's website at https://worldcopperltd.com, and for general Company updates you may follow us on our social media pages via Facebook, Twitter & LinkedIn.

 

On Behalf of the Board of Directors of

 

World Copper Ltd.

 

"Gordon Neal"

 

Gordon Neal
President & Chief Executive Officer

 
 

For further information, or to schedule a Zoom meeting with Management, please contact:
Gordon Neal or Michael Pound
Phone: 604-638-3287
Email: info@worldcopperltd.com 

 

For all Investor Relations inquiries, please contact:
John Liviakis
Liviakis Financial Communications Inc.
Phone: 415-389-4670

 

For all Public Relations inquiries, please contact:
Nancy Thompson
Vorticom, Inc.
Office: 212-532-2208 | Mobile: 917-371-4053

 
 

Follow us:

 

Twitter: https://twitter.com/WorldCopperLtd 
Facebook: https://www.facebook.com/WorldCopperLtd 
LinkedIn: https://www.linkedin.com/company/worldcopperltd 

 

Neither TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

 

Cautionary Note Regarding Forward-Looking Statements

 

This news release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and U.S. securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements with respect to anticipated exploration program results from exploration activities, and the discovery and delineation of mineral deposits/resources/reserves, are forward-looking statements. Although World Copper believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: "believes", "expects", "anticipates", "intends", "estimates", "plans", "may", "should", "would", "will", "potential", "scheduled" or variations of such words and phrases and similar expressions, which, by their nature, refer to future events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this news release, World Copper has applied several material assumptions, including without limitation, market fundamentals will result in sustained copper demand and prices, the receipt of any necessary permits, licences and regulatory approvals in connection with the future development of Zonia in a timely manner, the availability of financing on suitable terms for the development, construction and continued operation of World Copper's projects and its ability to comply with environmental, health and safety laws.

 

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of World Copper to differ materially from any future results, performance or achievements expressed or implied by the forward-looking information. Such risks and other factors include, among others, operating and technical difficulties in connection with mineral exploration and development activities, actual results of exploration activities, including on Zonia, the estimation or realization of mineral reserves and mineral resources, the timing and amount of estimated future production, the costs of production, capital expenditures, the costs and timing of the development of new deposits, requirements for additional capital, future prices of copper, changes in general economic conditions, changes in the financial markets and in the demand and market price for commodities, lack of investor interest in future financings, accidents, labour disputes and other risks of the mining industry, delays in obtaining governmental approvals, permits or financing or in the completion of development or construction activities, risks relating to epidemics or pandemics, including the impact on World Copper's business, financial condition and results of operations, changes in laws, regulations and policies affecting mining operations, the inability of World Copper to obtain any necessary permits, consents, approvals or authorizations, the timing and possible outcome of any pending litigation, environmental issues and liabilities, and risks related to joint venture operations, and other risks and uncertainties disclosed in World Copper's continuous disclosure documents. All of World Copper's Canadian public disclosure filings may be accessed via www.sedarplus.ca and readers are urged to review these materials.

 

Readers are cautioned not to place undue reliance on forward-looking statements. World Copper does not undertake any obligation to update any of the forward-looking statements in this news release or incorporated by reference herein, except as otherwise required by law.

 

Cautionary Note to United States Investors

 

World Copper prepares its disclosure in accordance with the requirements of securities laws in effect in Canada, which differ from the requirements of U.S. securities laws. Terms relating to mineral resources in this news release are defined in accordance with NI 43-101 under the guidelines set out in CIM Standards. The U.S. Securities and Exchange Commission (the "SEC") has adopted amendments effective February 25, 2019 (the "SEC Modernization Rules") to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the U.S. Securities Exchange Act of 1934.

 

As a result of the adoption of the SEC Modernization Rules, the SEC will now recognize estimates of "measured mineral resources", "indicated mineral resources" and "inferred mineral resources", which are defined in substantially similar terms to the corresponding CIM Standards. In addition, the SEC has amended its definitions of "proven mineral reserves" and "probable mineral reserves" to be substantially similar to the corresponding CIM Standards.

 

U.S. investors are cautioned that while the foregoing terms are "substantially similar" to corresponding definitions under the CIM Standards, there are differences in the definitions under the SEC Modernization Rules and the CIM Standards. Accordingly, there is no assurance any mineral resources that World Copper may report as "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had World Copper prepared the resource estimates under the standards adopted under the SEC Modernization Rules.

 

In accordance with Canadian securities laws, estimates of "inferred mineral resources" cannot form the basis of feasibility or other economic studies, except in limited circumstances where permitted under NI 43-101.

 

 

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/229725

 

 

 

News Provided by Newsfile via QuoteMedia

WCU:CA
The Conversation (0)
/C O R R E C T I O N from Source -- Canadian Investment Regulatory Organization  - Halts/Resumptions/

/C O R R E C T I O N from Source -- Canadian Investment Regulatory Organization - Halts/Resumptions/

 
 

HaltsResumptions over CNW, we are advised by the company that the resumption time should be "1:45 PM" rather than "12:30 PM" as originally issued inadvertently. The complete, corrected release follows:

 

Canadian Investment Regulatory Organization Trade Resumption - WCU

  

  VANCOUVER, BC ,   Feb. 19, 2025   /CNW/ - Trading resumes in:

 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Canadian Investment Regulatory Organization Trade Resumption - WCU

Canadian Investment Regulatory Organization Trade Resumption - WCU

 
 

Trading resumes in:

 

Company: World Copper Ltd. 

 

 

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
World Copper Enters into Letter Agreement to Sell Zonia Project

World Copper Enters into Letter Agreement to Sell Zonia Project

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE: 7LY0)  ("World Copper" or the "Company") announces that the Company has entered into a binding letter agreement made as of February 12, 2025 (the "Letter Agreement") to sell its interest in the Zonia copper project located in the Walnut Grove Mining District, Yavapai County, Arizona ("Zonia" or the "Project") to an arm's length third party (the "Purchaser") in consideration for CAD $26.0 million cash (the "Purchase Price"), payable in tranches (the "Proposed Transaction").

The Letter Agreement provides for a 90-day due diligence period and sets forth the proposed commercial terms for the Proposed Transaction. It is currently expected that the Proposed Transaction will be effected by way of a share purchase and sale transaction pursuant to which the Purchaser would acquire all of the issued and outstanding shares of the Company's Arizona subsidiary, Cardero Copper (USA) Ltd. ("Subco"). Following completion of due diligence to the satisfaction of the Purchaser, the parties will have 15 days to enter into a definitive agreement. The payment of the Purchase Price shall be payable as to CAD $8.0 million to World Copper at closing of the Proposed Transaction (the "Closing"), an additional instalment of CAD $8.0 million on or before the 15-month anniversary of Closing, and a final instalment of CAD $10.0 million on or before the 30-month anniversary of Closing, subject to the Purchaser's right to accelerate the additional instalments. Until the payment in full of the Purchase Price, it is proposed that the shares of Subco will be held in escrow, and the Purchaser will grant World Copper a security interest over such shares and the Project. If the Purchaser fails to make any instalment payment for the Purchase Price, the shares of Subco will be returned to World Copper and the Purchaser would retain no interest in the Subco shares or the Project.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
World Copper Arranges $1.5 Million Financing

World Copper Arranges $1.5 Million Financing

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE:7LY0) ("World Copper" or the "Company") announces a non-brokered private placement (the "Placement") of up to 18,750,000 units (the "Units") at a price of $0.08 per Unit (the "Offering") for gross proceeds of up to $1,500,000. Each Unit will consist of one common share of the Company (a "Share") and one common share purchase warrant (a "Warrant"). Each Warrant entitles the holder to acquire one additional share of the Company for a period of three years from the date of issuance at a price of $0.16 per share.

Insiders may participate and finders' fees may be payable to qualified arm's length parties that have introduced the Company to certain subscribers participating in the Offering. All securities issued in the Offering are subject to a four-month hold period, during which time the securities may not be traded. Closing of the Offering is subject to the approval of the TSXV.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
World Copper Initiates Strategic Review Process and Engages Advisor

World Copper Initiates Strategic Review Process and Engages Advisor

World Copper Ltd. (TSXV: WCU) (OTCQB: WCUFF) (FSE: 7LY0) ("World Copper " or the "Company") announces that the Company has initiated a strategic review process and has engaged Origin Merchant Partners (the "Advisor") to assist it in its review. The Advisor will work with World Copper's management and Board to evaluate a range of strategic alternatives that may be available to the Company to grow and maximize value for all shareholders (the "Engagement"). There can be no assurance that this process will result in any specific strategic plan or financial transaction and no timetable has been set for its completion. The Company does not plan to provide updates on the status of the review unless there are material developments to report.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
FPX Nickel Announces Share-Based Compensation Grant

FPX Nickel Announces Share-Based Compensation Grant

 
 

FPX Nickel Corp. (TSXV: FPX) (OTCQB: FPOCF) (" FPX " or the " Company ") announces that the board of directors of the Company has approved the grant of 5,305,000 stock options (the " Options ") to directors, officers and employees of the Company pursuant to the Company's Share Compensation Plan. The Options have an exercise price of $0.30 per share, with a five-year term and are fully vested on the grant date, July 10, 2025 .

 
 

  FPX Nickel logo (CNW Group/FPX Nickel Corp.) 

 

The Company also granted an aggregate 750,000 restricted share units (the " RSUs ") to certain officers of the Company. The RSUs vest in three equal installments on the annual anniversaries of the grant date and each vested RSU will entitle the holder to receive one common share of the Company or the equivalent cash value upon settlement.

 

  About FPX Nickel Corp.  

 

 FPX Nickel Corp. is focused on the exploration and development of the Decar Nickel District, located in central British Columbia , and other occurrences of the same unique style of naturally occurring nickel-iron alloy mineralization known as awaruite. For more information, please view the Company's website at https://fpxnickel.com/ or contact Martin Turenne , President and CEO, at (604) 681-8600 or ceo@fpxnickel.com .

 

On behalf of FPX Nickel Corp.

 

"Martin Turenne"
Martin Turenne , President, CEO and Director

 

   Forward-Looking Statements   

 

  Certain of the statements made and information contained herein is considered "forward-looking information" within the meaning of applicable Canadian securities laws. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed in the Company's periodic filings with Canadian securities regulators. Actual results could differ from those currently projected. The Company does not assume the obligation to update any forward-looking statement.  

 

  Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.  

 

SOURCE FPX Nickel Corp.

 

 

 

 Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2025/11/c5569.html  

 
 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Cygnus Metals Limited: Issue of Performance Rights

Cygnus Metals Limited: Issue of Performance Rights

 

Cygnus Metals Limited ("Cygnus" or the "Company") advises that it has issued an aggregate of 67,050,000 performance rights ("Performance Rights") to directors, and key employees and consultants, under the Company's Omnibus Equity Incentive Plan ("Plan").

 

Shareholders approved the Plan and the issue of Performance Rights to directors at the Company's annual general meeting held on May 14, 2025. The Performance Rights to key personnel were issued on the same terms and conditions as the director Performance Rights, as set out in the notice of annual general meeting released to ASX on April 14, 2025.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Conducts Prospecting and Soil Geochemical Surveys at Its Adams Plateau SEDEX Silver-Zinc-Lead-Copper-Gold Project, BC, Canada

Silver47 Exploration Corp. (TSXV: AGA,OTC:AAGAF) (OTCQB: AAGAF) ("Silver47" or the "Company") is pleased to announce the 2025 exploration program is nearing completion at its wholly-owned Adams Plateau Project (the "Project") in southern British Columbia, a silver-zinc-copper-gold-lead SEDEX project.

Gary Thompson, CEO of Silver47, stated: "We are glad to continue our work on Adams Plateau toward defining drill targets on this road-accessible project. The abundance of surface mineralization on the Project is very encouraging for the potential of new and exciting discoveries. The Company has received a 5-year permit for drilling. This year is shaping up to be transformational for the Company with a full season of drilling at the flagship Red Mountain Project and the pending merger with Summa Silver."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

Osisko Metals Infill and Expansion Drilling Intersects New Wide Mineralization at Gaspé Copper

 

   New Expansion Hole Intersects    279    Metres Averaging    0.49    % Cu   

 

   Nine Drill Rigs Now Active on Site   

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Vertex Minerals Limited  Reward Gold Mine Project Update

Vertex Minerals Limited Reward Gold Mine Project Update

Perth, Australia (ABN Newswire) - Vertex Minerals Limited (ASX:VTX,VTXXF) (OTCMKTS:VTXXF) is pleased to announce that the underground mining operation is on track to be producing high grade gold feed to the recently commissioned gravity gold plant in the coming weeks.

HIGHLIGHTS:

- Operational Milestones

o VTX remains firmly on track to commence production of high-grade ore from the underground mine in the forthcoming weeks.

o Transformer and cabling for the installation of 11kV high voltage underground power system on site with installation commenced.

o Preparations for the underground mine startup up progressing as planned and stripping of the main access is completed.

o New Aramine L350D has departed France for the journey to Hill End. Arrival in Orange NSW expected in by 26th August where it will be fitted with an RCT remote control system for open stoping operations.

o Mining the Reward Gold Mine - Resource 225kozs at 16.7g/t (VTX ASX Announcement 21 June 2023).

o Weekly Gold production Oz's from Stockpiles improving with depth in the stockpiles, with coarser particle size and better process throughput experienced.

- Mine start up

o Fan chambers have been excavated to provide secondary ventilation for production activities, exploration drilling and the future southern access toward the Fosters' exploration target.

o Primary ventilation fan has been installed and bulkhead completed.

o High voltage surface substation has been installed.

o High voltage cabling installation commences next week, with power up of the system scheduled for 28 July 2025.

o Stripping of the main accessis completed with the final elements of ground support (approx. 30m) to be completed before power cable installation starts next week.

o Cable bolts installed for the intersection of Lady Belmore exploration drive with first cut drilled out and ready to charge.

o Development Jumbo #1 (Epiroc T1D) is exceeding performance expectations.

o Dewatered of declines well underway.

o Mine schedule for FY26 finalised.

o First airleg stope secondary vent installed and specialty equipment on site to start first air leg stope.

o First long hole stope planned for August. High grade from airleg and longhole stopes to complement larger tonnage from development ore headings.

- People that have been onboarded

o 2x Drill Fitters and Heavy diesel fitter.

o Process superintendent commences next week.

o Full Tech team started including mine surveyor this week.

o Have back-to-back airleg miners for stoping.

o Full underground and mill crews.

- Improvements to plant

o DSM screen installed to improve product delivery to Wilfley Table.

o Gemini table improvements with new tabletop and gearbox improving final concentrate grade to over 20% gold (suitable for direct smelting to Dore on site).

o Process water pump upgrade improving ore washing and Tomra performance.

- Revised mine plan and schedule completed and ready to implement

- Updated Reward Gold mine mining plan and mine schedule completed.

- Adding a high-grade long hole stope upfront to be mined concurrently with the high grade airleg stope.

Vertex Director Declan Franzmann commented: "It is great to see all the elements of re-developing the underground mine and processing facility coming together so rapidly. The most pleasing aspect is our success in employing an incredible team of people to run the operation and all credit to management for developing great "esprit de corps" and a single sense of purpose as we push to full production."

As previously announced, the startup mine schedule includes mining 2,075 tonnes at 17.8 g/t Au from a developed airleg stope block. The planned stope width is the same as the interpretation of the mineralisation. (Refer to Table 1 in Appendices 1) (VTX ASX announcement 26/06/23).

Given this stope will take some time to extract, the Vertex geology and Mining Team have additionally brought forward a very high-grade long hole stope to commence mining in August as well. Further optimisations to the mining schedule will continue to be made.

This stope can be exploited as soon as services have been established. The mining crews have done a great job in the access drive to make room for the services (11kV cable, water and air lines) while improving accessibility for the mobile mining equipment selected for the Project.

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/OUQP5Z21

 

About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX,VTXXF) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.

 

 

Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×