Vertex Identifies Fully Developed Stope Block for Production

Vertex Identifies Fully Developed Stope Block for Production

Vertex Minerals (VTX:AU) has announced Vertex Identifies Fully Developed Stope Block for Production

Download the PDF here.

Vertex Minerals

Vertex Minerals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Vertex Minerals

Vertex Minerals


Keep reading...Show less

Australia’s next high-grade, green gold producer

Vertex Minerals Limited  Share Purchase Plan Raises A$1.6M and Closes

Vertex Minerals Limited Share Purchase Plan Raises A$1.6M and Closes

Perth, Australia (ABN Newswire) - Vertex Minerals Limited (ASX:VTX) (OTCMKTS:VTXXF) is pleased to advise that the Company's Share Purchase Plan Offer ("SPP") is closing Friday 6 June 2025 after raising A$1.6 million.

As announced on 12 May 2025, the Company proposed a maximum of A$1 million Share Purchase Plan Offer as part of a A$11 million capital raising.

Due to an overwhelming response, the Company decided to close the SPP early.

To view the updated anticipated dates, please visit:
https://abnnewswire.net/lnk/HQL85278

 

About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.

 

 

Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Vertex Minerals Limited  Reward Gold Mine Project Update

Vertex Minerals Limited Reward Gold Mine Project Update

Perth, Australia (ABN Newswire) - Vertex Minerals Limited (ASX:VTX) (OTCMKTS:VTXXF) is pleased to announce that the underground mining operation is on track to be producing high grade gold feed to the recently commissioned gravity gold plant early this quarter.

Vertex's Technical Director and Geologist, Tully Richards commented: "It is very exciting to be involved in the opening of the next chapter of what is a legendary gold field. I'm particularly pleased to see the enthusiasm of all those involved in wanting to make this chapter a success"

HIGHLIGHTS:

- VTX remains on track to deliver first underground high grade gold ore to the Gravity Gold plant in early Q3 2025, with commissioning and underground mine readiness ramp- up activities progressing as planned.

- Underground Gold Mining Readiness

- First underground miners onboarded under owner operator model

- TD1 Jumbo (for development and production) commissioned and operating underground

- Primary ventilation installed

- First stope development dewatering completed

- Explosive Magazine constructed

- Water feed installed

- Air lines installed and operational

- 11kva power installation underway

- Revised mine plan and schedule received and being implemented

- Underground Ore trialled through gravity plant

- Trail of 90 tonnes of development material with some reef quartz through the gravity plant

- Throughput exceeding expectation and beyond the nameplate plant flow sheet value.

- Pulse Mining System Installed and Implemented

- INX Software Installed and Implemented

- INX Software and site access kiosks to go live at mine site in June.

- INX will improve overall safety framework with real time risk mitigation focus.

- INX strengthens site access controls for employees, contractors and visitors.

- Sand Stack facility fully operational

- Facility fully functioning with return water pump station installed and operational (water recycling)

- 57 Megalitre Turon River water licence purchased for back up water supply

- Environmental & Compliance Implementation

- Multiple monitoring systems installed, and real time monitored (Dust, noise, vibration).

- Underground diamond drilling site ("drill cuddy") being established

- This location will be used for Reward Gold Mine resource development as well as mine corridor exploration diamond drilling

A batch of hard rock material, taken from the Reward Gold Mine - Amalgamated Vein, was trial processed through the Gravity Gold Plant and TOMRA sorter. Vertex engineers and operators were extremely pleased with the throughput rate and its sorting amenability.

As previously announced the new mine schedule for the Reward underground mine proposes mining two stope blocks consisting of 2,075 tonnes at 17.8 g/t Au and 700 tonnes at 42.5 g/t Au. The planned stope width is the same as the interpretation of the mineralisation. (Refer to Table 1 in Appendices 1) (VTX ASX announcement 26/06/23).

This stope can be exploited as soon as services have been established. Vertex mining crews are actively developing the adit to make room for the 11kva cable, water and air lines ("services").

Drill Cuddy (location for underground diamond drill rig)

A drill cuddy is being developed by Vertex airleg miners and will be completed mid-June. The drill cuddy will be mined up to 6m in height and 7m depth to cater for the Vertex LM90 drill rig. The rig will drill circa 7 holes in this location designed by the Vertex geologists, targeting the stacked veins below and above the Amalgamated adit. The LM 90 will be operated by Vertex drillers and will drill continuously going forward. The aim is to build gold inventory, convert inferred resource to indicated and to help with stope design.

Vertex have now fully installed and implemented a closed water system at the Reward Gold Mine. The water from the gravity process plant mixed with the waste sand material is decanted at the sand stack area. The decanted water is then pumped back to the process plant for re-use. Make-up water is sourced from the Reward Gold Mine where mine water is used to meet the water requirements for the gravity plant. Water use is minimised in the process because the ore is mostly processed by ore sorting which doesn't use water. Further the water is not polluted because the Reward Ore and country rock has no sulphide minerals and the plant process does not use chemicals (Cyanide or reagents).
*To view tables and figures, please visit:
https://abnnewswire.net/lnk/8HMS51NW

 

About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.

 

 

Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Vertex Minerals Limited  Identifies Additional Gold Resources at the Reward Mine

Vertex Minerals Limited Identifies Additional Gold Resources at the Reward Mine

Perth, Australia (ABN Newswire) - Vertex Minerals Limited (ASX:VTX) (OTCMKTS:VTXXF) is pleased to announce that the Company's engineering and geology team at the Reward Mine have identified an additional two stope block that have not been previously reported. These stopes will be incorporated into the overall mine schedule, but provide an early source of mill feed.

HIGHLIGHTS:

- VTX's Technical Services team has identified a fully developed stope block to include in the mine production start-up.

- Stopes are suitable for airleg mining which will augment jumbo production.

- Stope blocks contains an Inferred Resource of 2,075 tonnes at 17.8 g/t Au and forms part of the 2023 Mineral Resource Estimate. With the lower block having over 700 tonnes at 42.5 g/t. The planned stope width is the same as the interpretation of the mineralisation.

- Stopes are additional to the PFS mine schedule which is illustrated in Figure 2* showing the location of the additional stope.

- Stope blocks are fully developed and have been sampled from development.

- This stope can be exploited as soon as services have been established.

The stopes were developed by a previous operator and are accessible from existing development. The additional stope blocks contain an Inferred Resource of 2,075 tonnes at 17.8 g/t Au containing 1,189 ounces of gold with the lower block having over 700 tonnes at 42.5 g/t. The planned stope width is the same as the interpretation of the mineralisation. These stopes forms part of the Mineral Resource Estimate reported in VTX Announcement 22 June 2023. They were not included in the production forecast detailed in the 2024 Pre-Feasibility Study (Announcement 3 January 2024). This was due to the complexity of existing airleg workings and uncertainty around access and ground conditions and wide spaced drilling which established these areas into an Inferred Resource Category.

Note: 'The Mineral Resources are additional to the Ore Reserves.'

Subsequent investigations, which included physical inspection of the levels and completing a geotechnical assessment, have concluded that the stopes are fully developed and accessible.

The quartz veins are exposed in the existing development and have been sampled. In total ninety-seven (97) face samples were taken along the stope and assayed for gold. Figure 3* illustrates the sample grades diluted to 1.5m width, which represents a minimum mining width, and the locations along the stope.

The density of sampling around the stope locations, along with accessibility adds to the confidence that the Company can successfully mine this area very early in the start-up of underground production. The Company believes the inclusion of these stopes is significant to early production, and that the stopes will be mined before the Company updates the Resource and Reserve Estimates for the Project. These samples were not used in the Resource.

The Company plans to exploit this stope once the mine services have been established and bring this stope into the initial stages of the production schedule.

Vertex's Executive Chairman, Roger Jackson commented: "Our new technical team has been established, and it is great to see them looking for the opportunities to add value to the high-grade underground production start-up.

This really does show the potential this mine has for high grade expansion. We are in the process of re-opening the underground mine with the establishment of mine services. Dewatering of the declines has commenced and is progressing to schedule."

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/0C116659

 

About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.

 

 

Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
VIDEO: Vertex Minerals Ltd  Exec. Chairman Roger Jackson Outlines the Move to Gold Production

VIDEO: Vertex Minerals Ltd Exec. Chairman Roger Jackson Outlines the Move to Gold Production

Sydney, Australia (ABN Newswire) - VIDEO: Vertex Minerals Ltd (ASX:VTX) (OTCMKTS:VTXXF) Exec. Chairman Roger Jackson is interviewed by ABN Newswire and outlines the Move to Gold Production for the Hill End project.

Mr Jackson explains that the company is fully funded with all processes in place to begin gold mining at the historic Hill End location, where the largest gold specimen (The Holterman Nugget) in history was found.

New drilling equipment will allow the company to extend on its current gold resource. 3,600 shallow shafts running along strike, with no drilling provides the company with an exceptional opportunity to grow the resource base as it concurrently begins mining from the "Reward" that contains over 200,000 ounces of gold at over 17 grams per tonne.

The company is moving quickly from explorer/developer to explorer/miner.

To view the Video Interview, please visit:
https://www.abnnewswire.net/lnk/NOSAH25C

 

About Vertex Minerals Limited:  

Vertex Minerals Limited (ASX:VTX) is an Australian based gold exploration company developing its advanced Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical and environmentally sustainable approach.

 

 

Source:
Vertex Minerals Limited

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Bold Ventures Provides Update on Field Work at Burchell Property

Bold Ventures Provides Update on Field Work at Burchell Property

 

Bold Ventures Inc. (TSXV: BOL) (the "Company" or "Bold") is pleased to provide an update on the progress of field work at its Burchell Gold and Copper Property, located approximately 100 km west of Thunder Bay.

 

Prospecting, outcrop mapping and soil sampling were carried out during the months of May and June on a 1 km by 800 m flagged grid centered on the recently discovered 111 Zone, where grab samples returned between 10 ppb gold and 68 g/t gold last December (see news releases dated December 12, 2024 and January 9, 2025). More than 600 rock and soil samples have been submitted for analysis from this first phase of field work, with final results pending.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Juggernaut Announces Financing Of $1,000,000 From One Strategic Investor

Juggernaut Announces Financing Of $1,000,000 From One Strategic Investor

 

(TheNewswire)

 
        
  Juggernaut Exploration Ltd. 
                   
 

Vancouver, British Columbia July 3 rd 2025 TheNewswire - Juggernaut Exploration Ltd. (TSX-V: JUGR) (OTCQB: JUGRF) (FSE: 4JE) (the "Company" or "Juggernaut"), is pleased to announce a $1,000,000 hard dollar financing from one strategic investor, further confirming the support and excitement of the newly discovered 11 km Highway of Gold surrounding the Eldorado porphyry system on the Big One property. The discovery is in an area of glacial and snowpack abatement next door to the gold-rich porphyry systems at Newmont Mining's Galore Creek. The Big One Property is a discovery previously announced Jan 20 th (Click Link) with assays up to 79.01 gt gold (2.54 ozt gold) and 3157.89 gt silver (101.5 ozt silver) from over 200 gold-silver-copper rich polymetallic veins up to 8 m wide and striking for up to 500 m that all remain open at surface. The Big One Project covers 33,693 hectares in a globally ranked tier 1 jurisdiction with tremendous additional discovery potential in the heart of the Golden Triangle, British Columbia.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Anteros Returns High-Grade Lead-Zinc-Silver in Surface Samples from the MMZ at its Havens Steady VMS Property, Newfoundland

Anteros Returns High-Grade Lead-Zinc-Silver in Surface Samples from the MMZ at its Havens Steady VMS Property, Newfoundland

 

Anteros Metals Inc. (CSE: ANT) ("Anteros" or the "Company") is pleased to announce assay results from six grab samples collected at the Main Mineralized Zone ("MMZ") of its wholly-owned, road-accessible Havens Steady VMS Property ("Havens Steady" or the "Property") in central Newfoundland. These samples confirm high-grade lead-zinc-silver mineralization at surface and show associated gold and copper enrichment consistent with a polymetallic volcanogenic massive sulphide ("VMS") system.

 

The grab samples were collected during a recent field visit, focused on confirming the tenor and extent of exposed mineralization within the MMZ. All samples were collected from bedrock outcroppings of gossanous surface material. Surface grab sample highlights are given in Table 1, below.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Vertex Minerals

Vertex Minerals Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×