
October 05, 2023
Toro Energy (ASX:TOE) has begun its extension study for the Lake Maitland project, according to an article published by The West Australian. The study seeks to explore the Lake Way and Centipede-Millipede deposits for uranium-vanadium ore, the article said.
The study, to be completed by mining engineers at SRK Consulting Australasia (SRK), aims to increase the value of the Lake Maitland operation which was originally pegged at an EBITDA of $101 million within a 17.5-year life of mine.
The first seven years of the proposed Lake Maitland Uranium-Vanadium operation is expected to process high-grade uranium material and the new study will look at whether this high-grade operation can extend beyond the first seven years and have a transformational effect on the value of the broader Wiluna Uranium Project, a press release issued by the company explained.
To read the full article, click here.
Click here to connect with Toro Energy (ASX:TOE) for an Investor Presentation.
TOE:AU
The Conversation (0)
12 October 2025
IsoEnergy to Acquire Toro Energy
Toro Energy (TOE:AU) has announced IsoEnergy to Acquire Toro EnergyDownload the PDF here. Keep Reading...
12 October 2025
Joint Investor Presentation
Toro Energy (TOE:AU) has announced Joint Investor PresentationDownload the PDF here. Keep Reading...
31 July 2025
Quarterly Activities and Cashflow Report June 2025
Toro Energy (TOE:AU) has announced Quarterly Activities and Cashflow Report June 2025Download the PDF here. Keep Reading...
27 May 2025
Updated Scoping Study Results Lake Maitland Uranium Project
Toro Energy (TOE:AU) has announced Updated Scoping Study Results Lake Maitland Uranium ProjectDownload the PDF here. Keep Reading...
30 April 2025
Quarterly Activities and Cashflow Report March 2025
Toro Energy (TOE:AU) has announced Quarterly Activities and Cashflow Report March 2025Download the PDF here. Keep Reading...
9h
Quarterly Activities/Appendix 5B Cash Flow Report
Basin Energy (BSN:AU) has announced Quarterly Activities/Appendix 5B Cash Flow ReportDownload the PDF here. Keep Reading...
9h
Quarterly Appendix 5B Cash Flow Report
Basin Energy (BSN:AU) has announced Quarterly Appendix 5B Cash Flow ReportDownload the PDF here. Keep Reading...
27 January
Basin Energy Eyes Uranium Growth in Europe After Sweden Policy Shift
Basin Energy (ASX:BSN) is positioning for growth following Sweden’s significant shift in uranium policy, a move the company’s managing director, Pete Moorhouse, says has major implications not only for the company, but also for Europe’s broader energy strategy. In an interview with the Investing... Keep Reading...
27 January
American Uranium Exec Outlines Lo Herma ISR Progress, Resource Update
American Uranium (ASX:AMU,OTCID:AMUIF) Executive Director Bruce Lane says recent test work at the company’s Lo Herma uranium project in Wyoming has delivered an important proof of concept for its in situ recovery (ISR) development plans. The testing focused on validating aquifer performance, a... Keep Reading...
27 January
Standard Uranium CEO Outlines Athabasca Exploration Plans and Uranium Market Outlook
Standard Uranium (TSXV:STND,OTCQB:STTDF) is advancing an ambitious exploration strategy in Saskatchewan’s Athabasca Basin, according to CEO and Chairman Jon Bey, who spoke with the Investing News Network at the 2026 Vancouver Resource Investment Conference.The company is preparing for a... Keep Reading...
23 January
Investment establishes valuation of C$50M for the polymetallic Häggån project
Aura Energy Limited (ASX: AEE, AIM: AURA) (“Aura” or “the Company”) is pleased to announce that MMCAP International Inc. SPC (‘MMCAP’) and certain other strategic investors (together the ‘Strategic Investors’) will provide funding of C$10 million for a 19.7% interest in the Company’s... Keep Reading...
Latest News
Interactive Chart
Latest Press Releases
Related News
TOP STOCKS
American Battery4.030.24
Aion Therapeutic0.10-0.01
Cybin Corp2.140.00





