
- NORTH AMERICA EDITIONAustraliaNorth AmericaWorld
October 05, 2023
Toro Energy (ASX:TOE) has begun its extension study for the Lake Maitland project, according to an article published by The West Australian. The study seeks to explore the Lake Way and Centipede-Millipede deposits for uranium-vanadium ore, the article said.
The study, to be completed by mining engineers at SRK Consulting Australasia (SRK), aims to increase the value of the Lake Maitland operation which was originally pegged at an EBITDA of $101 million within a 17.5-year life of mine.
The first seven years of the proposed Lake Maitland Uranium-Vanadium operation is expected to process high-grade uranium material and the new study will look at whether this high-grade operation can extend beyond the first seven years and have a transformational effect on the value of the broader Wiluna Uranium Project, a press release issued by the company explained.
To read the full article, click here.
Click here to connect with Toro Energy (ASX:TOE) for an Investor Presentation.
TOE:AU
The Conversation (0)
12 October
IsoEnergy to Acquire Toro Energy
Toro Energy (TOE:AU) has announced IsoEnergy to Acquire Toro EnergyDownload the PDF here. Keep Reading...
12 October
Joint Investor Presentation
Toro Energy (TOE:AU) has announced Joint Investor PresentationDownload the PDF here. Keep Reading...
12 October
IsoEnergy to Acquire Toro Energy, Strengthening a Top-Tier Uranium Portfolio in a Rising Market
PERTH, Australia - Oct. 13, 2025 - IsoEnergy Ltd. ("IsoEnergy") (NYSE American: ISOU) (TSX: ISO) and Toro Energy Ltd. ("Toro") (ASX: TOE,OTC:TOEYF) are pleased to announce that they have entered into a scheme implementation deed (the " SID ") pursuant to which, among other things, IsoEnergy has... Keep Reading...
31 July
Quarterly Activities and Cashflow Report June 2025
Toro Energy (TOE:AU) has announced Quarterly Activities and Cashflow Report June 2025Download the PDF here. Keep Reading...
27 May
Updated Scoping Study Results Lake Maitland Uranium Project
Toro Energy (TOE:AU) has announced Updated Scoping Study Results Lake Maitland Uranium ProjectDownload the PDF here. Keep Reading...
19 November
Hydrogeological Testing Underway at Lo Herma
Hydrogeological testing has commenced at AMU’s flagship Lo Herma ISR Project in Wyoming’s Powder River Basin to validate aquifer performance concurrent with Phase 1 drilling which aims expand the 8.57Mlb resource at Lo Herma.
American Uranium Limited (ASX:AMU, OTC:AMUIF) (American Uranium, AMU or the Company) is pleased to advise that hydrogeological testing at its Lo Herma ISR uranium project in Wyoming’s Powder River Basin has commenced. Testing is being undertaken by Petrotek Corporation, a leading injection well... Keep Reading...
11 November
Drilling Commenced for Sybella-Barkly Uranium and Rare Earth
Basin Energy (BSN:AU) has announced Drilling commenced for Sybella-Barkly uranium and rare earthDownload the PDF here. Keep Reading...
11 November
Generation Uranium Eyes Discovery Near 43 Million Pound Lac 50 Uranium Deposit
At the 51st annual New Orleans Investment Conference, Chris Huggins, CEO of Generation Uranium (TSXV:GEN,OTCQB:GENRF), shared how the company is positioning itself in one of Canada’s most promising uranium belts. “We have a property called the Yath. It's a uranium grassroots project that is in... Keep Reading...
Latest News
Latest Press Releases
Related News
TOP STOCKS
American Battery4.030.24
Aion Therapeutic0.10-0.01
Cybin Corp2.140.00






