Slave Lake Zinc Secures Funding Through Northwest Territories Mining Incentive Program  to Advance O'Connor Lake Project

Slave Lake Zinc Secures Funding Through Northwest Territories Mining Incentive Program to Advance O'Connor Lake Project

Slave Lake Zinc Corp. (CSE: SLZ,OTC:SLZNF) (the "Company") is pleased to announce it has been awarded a grant under the Northwest Territories Mining Incentive Program (MIP) by the Government of the Northwest Territories (GNWT).

This non-dilutive funding will be allocated toward the ongoing and planned critical mineral exploration and delineation work at the Company's 100% owned O'Connor Lake Property, located in the prolific South Slave Magmatic zone.

Advancing Critical Mineral Exploration

The MIP grant, administered by the NWT Department of Industry, Tourism and Investment (ITI), is designed to stimulate and support high-quality mineral exploration activities throughout the Territory. This significant financial support directly validates the potential of the O'Connor Lake Project, which holds historic showings of zinc, lead, gold, silver, and copper, as well as other critical minerals potential.

The funds will specifically support:

  • The compilation and interpretation of data gathered during the recent successful field program, focusing on defining high-priority drill targets.

  • Geochemical and geological surveys aimed at confirming the known mineralized zones.

"We are incredibly grateful for the support from the Government of the Northwest Territories through the MIP program," stated Ritch Wigham, CEO & Director of Slave Lake Zinc. "This non-dilutive funding allows us to maximize the geological potential of O'Connor Lake and accelerate our exploration timeline. It underscores the importance of public-private partnerships in driving resource development in the NWT, especially as we focus on critical minerals vital for North America's green economy transition."

The O'Connor Lake Property is strategically located approximately 100 km east of Fort Resolution, offering favorable access and proximity to existing infrastructure. Slave Lake Zinc is committed to executing its exploration program responsibly and in collaboration with local Indigenous communities.

On Behalf of the Board of Directors,

Slave Lake Zinc Corp.
Per:
Ritch Wigham CEO & Director
Phone: 604-396-5762
Email: rwigham@zinccorp.ca

About Slave Lake Zinc Corp.

Slave Lake Zinc Corp. is a mineral exploration company focused on advancing its 100% owned O'Connor Lake Property, located in the prolific South Slave Magmatic zone of the Northwest Territories. The property is situated approximately 100 km east of Fort Resolution, the terminus of the all-weather road from Osisko's Pine Point deposits. The Company's geological team is experienced in identifying and delineating targets in our hydrothermal structurally controlled system and is committed to maximizing shareholder value through exploration and development of the O'Connor Lake Project.

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for the adequacy or accuracy of the content of this news release.

Forward-Looking Statement

Statements in this news release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in both Slave Lake Zinc's periodic filings with Canadian securities regulators. When used in this news release, words such as "will", "plan", "estimate", "expect", "intend", "potential", "should," and similar expressions, are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information. Forward-looking statements include, without limitation, statements regarding the progress of a definitive offtake agreement, potential development and production at the Company's O'Connor Lake project, future oriented events and other statements that are not facts. Forward-looking statements are based on a few assumptions and estimates that, while considered reasonable by management based on the business and markets in which Slave Lake Zinc operates, are inherently subject to significant operational, economic, and competitive uncertainties and contingencies. Such forward-looking statements should therefore be construed in light of such factors. Although Slave Lake Zinc has attempted to identify important factors that could cause actual results, performance or achievements to differ materially from those contained in the forward-looking statements, there can be other factors that cause results, performance or achievements not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate or that management's expectations or estimates of future developments, circumstances or results will materialize. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this news release are made as of the date of this news release, and Slave Lake Zinc disclaims any intention or obligation to update or revise such information, except as required by applicable law, and Slave Lake Zinc does not assume any liability for disclosure relating to any other company.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/272320

News Provided by Newsfile via QuoteMedia

SLZ:CC
The Conversation (0)
Slave Lake Zinc (CSE:SLZ)

Slave Lake Zinc

Prolific, Underexplored, District-scale Asset with First Nations Partnership

Prolific, Underexplored, District-scale Asset with First Nations Partnership Keep Reading...
Bold Ventures Approved for Trading on the OTCQB Venture Market

Bold Ventures Approved for Trading on the OTCQB Venture Market

Bold Ventures Inc. (TSXV: BOL,OTC:BVLDF) (the "Company" or "Bold") wishes to announce that its common shares have been approved for trading on the OTCQB Venture Market in the United States under the symbol (OTCQB: BVLDF). Trading commenced at the open of the market on May 7, 2026. Investors in... Keep Reading...
Sankamap Metals Launches Inaugural Drill Program at Kuma

Sankamap Metals Launches Inaugural Drill Program at Kuma

Sankamap Metals Inc. (CSE: SCU) ("Sankamap" or the "Company"), is pleased to provide additional geological context for its inaugural drill program at the Kuma Property in the Solomon Islands, with a focus on the identification of a well-developed lithocap and its significance for... Keep Reading...
Drilling Commences on the Rip Copper-Molybdenum Project

Drilling Commences on the Rip Copper-Molybdenum Project

Copper Quest Exploration Inc. (CSE: CQX,OTC:IMIMF; OTCQB: IMIMF; FRA: 3MX) ("Copper Quest" or the "Company") is pleased to announce that drilling has commenced on the Rip Copper-Molybdenum Project (the "Project" or "RIP") for drilling a minimum of 2,000 meters. The RIP Project is in the Stikine... Keep Reading...
Finlay Minerals Ltd. engages German Mining Networks and renews engagement with Investing News Network

Finlay Minerals Ltd. engages German Mining Networks and renews engagement with Investing News Network

finlay minerals ltd. (TSXV: FYL,OTC:FYMNF) (OTCQB: FYMNF) ("Finlay" or the "Company") reports that it has engaged German Mining Networks GmbH ("GMN") and renewed its engagement with Dig Media Inc. doing business as Investing News Network ("INN") for investor relations services. The Company has... Keep Reading...
Transition Metals Corp. Closes $618,844 Private Placement

Transition Metals Corp. Closes $618,844 Private Placement

Transition Metals Corp. (TSXV: XTM,OTC:TNTMF) ("Transition" or the "Company") is pleased to announce that it has closed its previously announced non-brokered private placement. A total of 5,381,250 Flow Through Units ("FT Units") were issued for gross proceeds of $618,844 (the "Offering"). The... Keep Reading...
Bold Ventures Announces Additional Results from Drilling at Burchell

Bold Ventures Announces Additional Results from Drilling at Burchell

Bold Ventures Inc. (TSXV: BOL,OTC:BVLDF) (the "Company" or "Bold") is pleased to announce the results from holes BL-26-03 and BL-26-04a from the first phase of drilling at its Burchell Project earlier this winter. 4 holes totaling 669 meters were completed. Table 1 below provides drillhole... Keep Reading...

Interactive Chart

Latest Press Releases

Related News